3.0 kmdirection unknownMon 22 Jun, 00:00 – Fri, 26 Feb 2027, 23:59 · in force now, ends in 103 daysRestriction unknownRoadworksMap · Google MapsAutomatic translation: Kreis Altenkirchen (Westerwald), K118 between Abzweig nach Dickendorf and Kausen construction site, closed, until 26/02/2027, 23:59 renovation of Kreisstraße 118 in the location …
· Original (German) →Full text
Kreis Altenkirchen (Westerwald), K118 between Abzweig nach Dickendorf and Kausen construction site, closed, until 26/02/2027, 23:59 renovation of Kreisstraße 118 in the location Kausen /// Here the road on the free track before Kausen receives new asphalt layers in the so-called building installation. /// In the village passage the road is completely renewed. At the same time, the Verbandsgemeindewerke Betzdorf-Gebhardshain are renovating their canal and water pipeline network. In addition, the municipality Kausen renews the walkways. A continuous walkway is first produced between Kirchstraße and the cemetery. In addition, the EAM network renews the existing power cables.