Kreis Birkenfeld L173 between Leisel and Wilzenberg construction site, closed until 30/11/2026, 18:00 full lock of L 173 at Leisel for 3 to 5 days in the period from 21.09 to … · Original (German) →Full text
Kreis Birkenfeld L173 between Leisel and Wilzenberg construction site, closed until 30/11/2026, 18:00 full lock of L 173 at Leisel for 3 to 5 days in the period from 21.09 to 30/11/2026. Redirection is carried out via L 175 to the estuary L 175/K 16. Then continue over K 16 to L 173 (and vice versa)