Beta ViaFrei is in beta: answers and coverage can change, and the AI can make mistakes. Please check important details with the source named. What this means
Kronweiler
Everything ViaFrei knows about Kronweiler right now – from open data, with the source of every figure.
The streets come from our street database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Red for a full closure of the carriageway, a wrong-way driver, objects, people or animals on the road, an accident with a closure, a weather warning of level 3–4 or a jam with a delay of 30 minutes or more.
Yellow for a shorter jam, roadworks narrowing the road, another traffic warning, a weather warning of level 1–2, slippery roads in the road-weather forecast, a closed entry or exit — or when a source is missing or out of date.
Green only when none of this is reported nearby and both the traffic messages and the German Weather Service's warnings for this place can be read. Green is no guarantee of a clear road.
Read: every traffic message for this place within 5.0 km (Autobahn GmbH, police, Land and city) and the German Weather Service (warnings, road weather).
No colour from: parking, charging, fuel, buses and trains.
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
0 closures · 0 jams and accidents · 15 roadworks within 15 km
6.5 kmboth directionsMon 21 Sept, 06:00 – Mon 30 Nov, 18:00 · in force now, ends in 31 daysRestriction unknownRoadworksMap · Google MapsAutomatic translation: Kreis Birkenfeld L173 between Leisel and Wilzenberg construction site, closed until 30/11/2026, 18:00 full lock of L 173 at Leisel for 3 to 5 days in the period from 21.09 to … · Original (German) →Full text
Kreis Birkenfeld L173 between Leisel and Wilzenberg construction site, closed until 30/11/2026, 18:00 full lock of L 173 at Leisel for 3 to 5 days in the period from 21.09 to 30/11/2026. Redirection is carried out via L 175 to the estuary L 175/K 16. Then continue over K 16 to L 173 (and vice versa)
6.9 kmdirection unknownFri 20 Feb, 00:00 – Wed, 19 May 2027, 23:59 · in force now, ends in 202 daysRestriction unknownRoadworksMap · Google MapsAutomatic translation: Kreis Birkenfeld K7 between Abzweig nach Ellenberg and Birkenfeld construction site, closed, until 19/05/2027, 23:59 K 7 from Birkenfeld until access to the north gate of … · Original (German) →Full text
Kreis Birkenfeld K7 between Abzweig nach Ellenberg and Birkenfeld construction site, closed, until 19/05/2027, 23:59 K 7 from Birkenfeld until access to the north gate of Heinrich-Herz-Kaserne free for residents
7.4 kmdirection unknownFri 20 Feb, 00:00 – Wed, 19 May 2027, 23:59 · in force now, ends in 202 daysRestriction unknownRoadworksMap · Google MapsAutomatic translation: Kreis Birkenfeld K7 between Birkenfeld and Abzweig nach Ellenberg construction site, closed, until 19/05/2027, 23:59 K 7 from Birkenfeld until access to the north gate of … · Original (German) →Full text
Kreis Birkenfeld K7 between Birkenfeld and Abzweig nach Ellenberg construction site, closed, until 19/05/2027, 23:59 K 7 from Birkenfeld until access to the north gate of Heinrich-Herz-Kaserne free for residents
Rhineland-Palatinate: we do not hold federal or state roads – for them this is no all-clear
Nothing right here — the nearest within 15 km
The publishers' own texts are on the German page.
Translated automatically by ViaFrei; the German original is binding. Opus-MT, Helsinki-NLP (Tiedemann, Thottingal) (CC BY 4.0)
Autobahn GmbH's motorway reports are on the “Motorways” card.
For lorries
Long-lorry positive network nearby: A62 8.7 km, L315 12 km, L133 12 km, B41 14 km, L134 21 km, A1 21 km
What binds is the Annex to § 2(1) of the LKWÜberlStVAusnV. The publisher states that the data make no claim to be complete or correct, have no legal or official meaning, and are not suitable for navigation or similar purposes.
Ask your AI assistant:Are there closures or jams near Kronweiler?
Ask your AI assistant:Tell me here in this chat when the traffic situation near Kronweiler changes.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →
Short-duration roadworks are planned at short notice and often changed; they replace neither a permit for oversize and heavy transport nor the route check before setting off (our translation of the publisher's note).
The publisher's wording is on the German page.
Nearby
A62Kusel - Reichweiler · 14 kmtowards Nonnweilerfrom Mon 26 Oct, 10:00, end not reported · in force nowRestriction unknownRoadworksMap · Google Mapsbetween 5.8 km after AS Kusel and 0.7 km before AS Reichweiler · 0.31 km long · 7.5 m wide to pass · 26 Oct – 27 Nov
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
8 of 8 topics shown
Ready in one minute
ViaFrei lives inside the assistant you already have. Three steps, once:
In Claude or ChatGPT: settings → “Connectors”.
Add ViaFrei with the address below.
Ask: “Is the A8 towards Munich clear right now?”
Draft — these steps are not yet verified in every assistant.
MCP endpoint (Streamable HTTP)
https://mcp.viafrei.de/mcp
Show the steps for your client
For older clients (HTTP + SSE)
https://mcp.viafrei.de/sse
Claude (desktop and claude.ai)
Settings → Connectors → “Add custom connector”.
Paste the endpoint above and save.
Ask: “Is the A8 towards Munich clear?”
Draft — these steps have not been verified on the client yet.