Beta ViaFrei is in beta: answers and coverage can change, and the AI can make mistakes. Please check important details with the source named. What this means
Balduinstein
Everything ViaFrei knows about Balduinstein right now – from open data, with the source of every figure.
ViaFrei creates no account and no profile and does not store your place. Your browser remembers a place on this device only when you choose it in the place bar – a place or an address, “Use my location” or “All of Germany” – together with your recent places; while this page uses a remembered place, a line under the place bar says so, and “Forget place” deletes it at once. The page asks for your location only when you choose “Use my location”; if you have already allowed it permanently in your browser, this page reads it without asking and stores nothing. Your location is rounded on your device to an area of about 500 m, and our server derives the street or place name for it from that area; it keeps that name in memory for at most an hour per area, without any link to you, and does not store it. It keeps the name of a station, place or address chosen here in memory for at most an hour in the same way. Your IP address is used only in memory, for the approximate location, and is not stored for it. More in the privacy policy
Yellow — Roadworks narrowing the road · Rhein-Lahn-Kreis, K25 zwischen Abzweig nach Langenscheid und Balduinstein · 450 m
Within 5.0 km of Balduinstein. No motorway junction within 5.0 km: the traffic light judges the other roads.
3 × Roadworks narrowing the road · Verkehrsmeldungen der Polizei: Landesbetrieb Straßenbau NRW (VIZ.NRW) via Mobilithek, Datenlizenz Deutschland – Zero – Version 2.0
Schematic map – not for navigation.Streets (OpenStreetMap)Buses and trainsCharging
The streets come from our street database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Red for a full closure of the carriageway, a wrong-way driver, objects, people or animals on the road, an accident with a closure, a weather warning of level 3–4 or a jam with a delay of 30 minutes or more.
Yellow for a shorter jam, roadworks narrowing the road, another traffic warning, a weather warning of level 1–2, slippery roads in the road-weather forecast, a closed entry or exit — or when a source is missing or out of date.
Green only when none of this is reported nearby and both the traffic messages and the German Weather Service's warnings for this place can be read. Green is no guarantee of a clear road.
Read: every traffic message for this place within 5.0 km (Autobahn GmbH, police, Land and city) and the German Weather Service (warnings, road weather).
No colour from: parking, charging, fuel, buses and trains.
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
0 closures · 0 jams and accidents · 7 roadworks within 5.0 km
450 mdirection unknownMon, 1 Jul 2024, 07:00 – Thu 31 Dec, 17:00 · in force now, ends in 59 daysRestriction unknownRoadworksMap · Google MapsAutomatic translation: Rhein-Lahn-Kreis, K25 between Abzweig nach Langenscheid and Balduinstein Maintenance work, until 31/12/2026, 17:00 Construction of the Lahn Bridge Balduinstein /// Permanent ban … · Original (German) →Full text
Rhein-Lahn-Kreis, K25 between Abzweig nach Langenscheid and Balduinstein Maintenance work, until 31/12/2026, 17:00 Construction of the Lahn Bridge Balduinstein /// Permanent ban on stopping -> Entry construction site -> Crossing area Railway station/Hauptstraße -> Location Bus stop at the hotel and restaurant Balduin
3.5 kmdirection unknownThu 1 Jan, 07:00 – Mon, 4 Jan 2027, 20:00 · in force now, ends in 63 daysRestriction unknownRoadworksMap · Google MapsAutomatic translation: Rhein-Lahn-Kreis, K30 between Abzweig nach Aull and Altendiez Construction site, closed until 04/01/2027, 20:00 Due to serious road damage caused by K30, it is fully closed for … · Original (German) →Full text
Rhein-Lahn-Kreis, K30 between Abzweig nach Aull and Altendiez Construction site, closed until 04/01/2027, 20:00 Due to serious road damage caused by K30, it is fully closed for transit traffic. For passengers and buses, the traffic is free. The speed is reduced to 30 km/h throughout the entire route.
3.5 kmdirection unknownThu 1 Oct, 07:00 – Tue 1 Dec, 18:00 · in force now, ends in 29 daysRestriction unknownRoadworksMap · Google MapsAutomatic translation: Rhein-Lahn-Kreis, L323 between Abzweig nach Klingelbach and Abzweig nach Steinsberg Maintenance work, from 01/10/2026, 07:00 to 01/12/2026, 18:00 · Original (German) →
Rhineland-Palatinate: we do not hold federal or state roads – for them this is no all-clear
The publishers' own texts are on the German page.
Translated automatically by ViaFrei; the German original is binding. Opus-MT, Helsinki-NLP (Tiedemann, Thottingal) (CC BY 4.0)
Autobahn GmbH's motorway reports are on the “Motorways” card.
For lorries
no lorry restriction listed within 5 km (ivm Frankfurt RheinMain) — this is not an all-clear, the signs on site apply
Long-lorry positive network nearby: A3 7.3 km, L318 8.0 km, B49 9.3 km, L317 13 km, B255 14 km, L327 15 km
What binds is the Annex to § 2(1) of the LKWÜberlStVAusnV. The publisher states that the data make no claim to be complete or correct, have no legal or official meaning, and are not suitable for navigation or similar purposes.
Ask your AI assistant:Are there closures or jams near Balduinstein?
Ask your AI assistant:Tell me here in this chat when the traffic situation near Balduinstein changes.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →
A3 · between Geiselwind junction (76) and Wiesentheid junction (75) · Bavaria (placed by ViaFrei)towards Emmerich am Rheinplanned for now, 07:00–18:001 of 3 lanes closed · Speed limit 80 km/hConstruction works: works on a structure (bridge, tunnel)Map · Google Maps
A3 · between Geiselwind junction (76) and Schlüsselfeld junction (77) · Bavaria (placed by ViaFrei)towards Pockingplanned for now, 08:00–14:001 of 3 lanes closed · Hard shoulder closed · Speed limit 80 km/hConstruction works: works on a structure (bridge, tunnel)Map · Google Maps
Short-duration roadworks are planned at short notice and often changed; they replace neither a permit for oversize and heavy transport nor the route check before setting off (our translation of the publisher's note).
The publisher's wording is on the German page.
Nearby
A3Montabaur - Welchehahn · 15 kmtowards Kölnfrom Mon 27 Jul, 00:00, end not reported · in force nowRestriction unknownRoadworksMap · Google Mapsbetween 0.6 km after Montabaur and 1.1 km before Welchehahn · 9.91 km long · 11.25 m wide to pass · 27 Jul 2026 – 12 Nov 2029
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
9 of 9 topics shown
Ready in one minute
ViaFrei lives inside the assistant you already have. Three steps, once:
In Claude or ChatGPT: settings → “Connectors”.
Add ViaFrei with the address below.
Ask: “Is the A8 towards Munich clear right now?”
Draft — these steps are not yet verified in every assistant.
MCP endpoint (Streamable HTTP)
https://mcp.viafrei.de/mcp
Show the steps for your client
For older clients (HTTP + SSE)
https://mcp.viafrei.de/sse
Claude (desktop and claude.ai)
Settings → Connectors → “Add custom connector”.
Paste the endpoint above and save.
Ask: “Is the A8 towards Munich clear?”
Draft — these steps have not been verified on the client yet.