Beta ViaFrei is in beta: answers and coverage can change, and the AI can make mistakes. Please check important details with the source named. What this means
Balduinstein
Balduinstein, Rhineland-Palatinate: the next departures live with their platform, which lifts and escalators work now, platforms with step-free access, facilities and surroundings – from open data, with source and date.
3 × Roadworks narrowing the road · Verkehrsmeldungen der Polizei: Landesbetrieb Straßenbau NRW (VIZ.NRW) via Mobilithek, Datenlizenz Deutschland – Zero – Version 2.0
Schematic map – not for navigation.Streets (OpenStreetMap)Buses and trains
The streets come from our street database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Warning marks: Datenbasis: Deutscher Wetterdienst, zusammengefasst
How the traffic light is set
Red for a full closure of the carriageway, a wrong-way driver, objects, people or animals on the road, an accident with a closure, a weather warning of level 3–4 or a jam with a delay of 30 minutes or more.
Yellow for a shorter jam, roadworks narrowing the road, another traffic warning, a weather warning of level 1–2, slippery roads in the road-weather forecast, a closed entry or exit — or when a source is missing or out of date.
Green only when none of this is reported nearby and both the traffic messages and the German Weather Service's warnings for this place can be read. Green is no guarantee of a clear road.
Read: every traffic message for this place within 5.0 km (Autobahn GmbH, police, Land and city) and the German Weather Service (warnings, road weather).
No colour from: parking, charging, fuel, buses and trains.
Official WARNING of FOG · Level 1 · —until 09:00What the DWD says
There is a risk of fog (level 1 of 1).
Visibility: < 150 m
Hazard(s) to expect: severely reduced visibility possible.
Recommendations for what to do:
Adapt your driving behaviour to sudden reduced visibility (fog banks).
DWD road-surface forecast for the nearest road-weather stations — a model forecast (run 01:00), not a measurement and not an official warning
The next hours at Elzer Berg
03:00 air 4.8 °C · road surface 6.1 °C, dry
04:00 air 4.5 °C · road surface 5.6 °C, dry
05:00 air 4.2 °C · road surface 5.1 °C, dry
06:00 air 4.2 °C · road surface 4.7 °C, dry
07:00 air 4.2 °C · road surface 5.1 °C, dry
08:00 air 4.5 °C · road surface 5.7 °C, dry
No slippery class forecast until 30 Oct, 02:44.
Each line is for the station's own location, not for the whole road.
Ask your AI assistant:Is there a severe-weather warning for Balduinstein right now?
Ask your AI assistant:Tell me here in this chat as soon as a severe-weather warning comes for Balduinstein.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →
Balduinstein Feuerwehr🚌Bus 350 m · 5 min walk · Map · Google MapsNothing leaves here in the next 60 minutes, by the timetable.
Birlenbach Fachingen Bahnhof🚆Train 2.7 km · 34 min walk · Map · Google MapsNothing leaves here in the next 60 minutes, by the timetable.Platforms per DB: 2 of 2 step-free
Laurenburg Bahnhof🚆Train 4.6 km · 57 min walk · Map · Google MapsNothing leaves here in the next 60 minutes, by the timetable.Platforms per DB: 2 of 2 step-free
More stops (1)
Diez Bahnhof🚆Train🚌Bus 4.8 km · 60 min walk · Map · Google Maps
Ask your AI assistant:What leaves next in Balduinstein, and is it on time?
Ask your AI assistant:Tell me here in this chat if the next departures in Balduinstein run late.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
🚧 Roads
Balduinstein · 5.0 kmlive · (sources: Landesbetrieb Straßenbau NRW (VIZ.NRW) 02:42, Die Autobahn GmbH des Bundes (Mobilithek) 02:44, Landesmeldestelle für den Verkehrswarndienst Baden-Württemberg (Innenministerium Baden-Württemberg) 02:34, Landesmeldestelle Polizei Schleswig-Holstein 02:14, Senatsverwaltung für Mobilität 02:03, Landesmeldestelle Berlin (LMST BE) 02:39, Digitale Plattform Stadtverkehr Berlin / Baustellen 02:03, Stadt Köln 02:04, Landeshauptstadt Hannover – Fachbereich Tiefbau 01:53, Stadt Rüsselsheim am Main 02:21, Stadt Kassel 02:26, Stadt Leipzig 01:53 · not answering: 2)stale · Verkehrsmanagementzentrale Bremen · ↻
0 closures · 0 jams and accidents · 7 roadworks within 5.0 km
300 mdirection unknownMon, 1 Jul 2024, 07:00 – Thu 31 Dec, 17:00 · in force now, ends in 64 daysRestriction unknownRoadworksMap · Google Mapsthe publisher's wording: Text only in German → · translation pending
3.4 kmdirection unknownThu 1 Oct, 07:00 – Tue 1 Dec, 18:00 · in force now, ends in 34 daysRestriction unknownRoadworksMap · Google MapsAutomatic translation: Rhein-Lahn-Kreis, L323 between Abzweig nach Klingelbach and Abzweig nach Steinsberg Maintenance work, from 01/10/2026, 07:00 to 01/12/2026, 18:00 · Original (German) →
3.5 kmdirection unknownThu 1 Jan, 07:00 – Mon, 4 Jan 2027, 20:00 · in force now, ends in 68 daysRestriction unknownRoadworksMap · Google Mapsthe publisher's wording: Text only in German → · translation pending
Rhineland-Palatinate: we do not hold federal or state roads – for them this is no all-clear
The publishers' own texts are on the German page.
Translated automatically by ViaFrei; the German original is binding. Opus-MT, Helsinki-NLP (Tiedemann, Thottingal) (CC BY 4.0)
Autobahn GmbH's motorway reports are on the “Motorways” card.
For lorries
no lorry restriction listed within 5 km (ivm Frankfurt RheinMain) — this is not an all-clear, the signs on site apply
Long-lorry positive network nearby: A3 7.4 km, L318 7.7 km, B49 9.7 km, L317 13 km, B255 13 km, L327 14 km
What binds is the Annex to § 2(1) of the LKWÜberlStVAusnV. The publisher states that the data make no claim to be complete or correct, have no legal or official meaning, and are not suitable for navigation or similar purposes.
Ask your AI assistant:Are there closures or jams near Balduinstein?
Ask your AI assistant:Tell me here in this chat when the traffic situation near Balduinstein changes.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →
🛣 Motorways
Balduinsteinstale · not read yet (sources: Autobahn GmbH des Bundes not read yet · not answering: 1)↻
A3 · between Kaiserberg interchange (14) and Oberhausen-Lirich junction (13) · near Duisburg · North Rhine-Westphalia (placed by ViaFrei)both directionsplanned for now, 28 Oct, 20:00–05:00 · further time windows: 12 of 3 lanes closed · Hard shoulder closedConstruction works: works on a structure (bridge, tunnel)Map · Google Maps
A3 · between Bad Camberg junction (44) and Limburg-Süd junction (43) · near Bad Camberg · Hesse (placed by ViaFrei)towards Emmerich am Rheinplanned for now, 28 Oct, 20:00–06:00 · further time windows: 11 of 3 lanes closed · Hard shoulder closed · Speed limit 80 km/hMaintenance works: verge mowing and tree careMap · Google Maps
A3 · between Diez junction (41) and Ransbach-Baumbach / Mogendorf junction (38) · near Diez · Rhineland-Palatinate (placed by ViaFrei)towards Emmerich am Rheinplanned 08:00–12:00 · further time windows: 11 of 2 lanes closed · Hard shoulder closed · Speed limit 80 km/hMaintenance works: sign and gantry worksMap · Google Maps
Short-duration roadworks are planned at short notice and often changed; they replace neither a permit for oversize and heavy transport nor the route check before setting off (our translation of the publisher's note).
The publisher's wording is on the German page.
Nearby
A3Limburg-Nord - Diez · 7.6 kmtowards Kölntime not reportedRestriction unknownRoadworksMap · Google Mapsbetween 5.7 km after AS Limburg-Nord and 0.7 km before AS Diez · 3 km long · max. 80 km/h · 7.5 m wide to pass · 29 Oct, 00:00–05:00
A3Montabaur - Welchehahn · 14 kmtowards Kölnfrom Mon 27 Jul, 00:00, end not reported · in force nowRestriction unknownRoadworksMap · Google Mapsbetween 0.6 km after Montabaur and 1.1 km before Welchehahn · 9.91 km long · 11.25 m wide to pass · 27 Jul 2026 – 12 Nov 2029
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Truck-parking occupancy (Toll Collect, SID)
By clicking you accept the terms of use (section 2, truck parking).
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.