Freinsheim, Bahnhofstraße between Dürkheimer Hohl and Am Güterbahnhof Construction site, closed, from 04/09/2026, 08:00 to 29/11/2026, 20:00 VG measure Freinsheim. … · Original (German) →Full text
Freinsheim, Bahnhofstraße between Dürkheimer Hohl and Am Güterbahnhof Construction site, closed, from 04/09/2026, 08:00 to 29/11/2026, 20:00 VG measure Freinsheim. Full lock of the railway bridge in Freinsheim. A passage is not possible. There's a detour signposted. Umleitung towards Bad Dürkheim: U7 Umleitung towards Freinsheim: U8