ViaFrei Transport data, spoken Connect
Connect in one minute

Beta ViaFrei is in beta: answers and coverage can change, and the AI can make mistakes. Please check important details with the source named. What this means

A650 motorway now

The A650 runs from Friedelsheim junction to Bruchwiesenstraße junction, about 14 km long (schematic), through Rhineland-Palatinate, with 7 junctions and interchanges (2 of them interchanges). Reported on the A650 now: 2 closures, 0 jams, 9 roadworks (as of 09:20).

Reported now

2 closures · 0 jams · 9 roadworks · as of 09:20

By direction

  • Bad Dürkheim → Ludwigshafen: 0 closures · 0 jams · 5 roadworks
  • Ludwigshafen → Bad Dürkheim: 0 closures · 0 jams · 4 roadworks
  • no direction given: 2 closures · 0 jams · 0 roadworks
Stretch and direction

Direction:

Show:

Whole motorway

Map

Schematic map of the A650The A650 from Friedelsheim to Bruchwiesenstraße, drawn schematically through its junctions, with the reported closures, roadworks and jams.
  • Junction or interchange
  • Closure
  • Roadworks
  • Charging station

Schematic: the line joins the points of the Location Code List in their order – not to scale, not a navigation map. Where the list has a gap, the line breaks too.

Closures, jams and roadworks on the A650

Closures

  • Closure · Map · 2 identical reports

Jams

none

Roadworks

  • Roadworks · Bruchwiesenstraße - Oggersheimer Kreuz · Ludwigshafen → Bad Dürkheim · Map
  • Roadworks · Friedelsheim - Ludwigshafen · Bad Dürkheim → Ludwigshafen · Map
  • Roadworks · Ludwigshafen - Oggersheimer Kreuz · Bad Dürkheim → Ludwigshafen · Map
  • Roadworks · Ludwigshafen - Ruchheim · Bad Dürkheim → Ludwigshafen · Map
  • Roadworks · Maxdorf - Ruchheim · Bad Dürkheim → Ludwigshafen · Map
  • Roadworks · Oggersheimer Kreuz - Ludwigshafen · Ludwigshafen → Bad Dürkheim · Map
  • Roadworks · Oggersheim-Süd - Oggersheimer Kreuz · Ludwigshafen → Bad Dürkheim · Map
  • Roadworks · Oggersheim-Süd - Ruchheim · Ludwigshafen → Bad Dürkheim · Map
  • Roadworks · Ruchheim - Oggersheimer Kreuz · Bad Dürkheim → Ludwigshafen · Map

Planned full closures, next 7 days

Autobahn GmbH announces no full closure on this motorway for the next 7 days (as of 09:20).

Some stretches are described in German only; the German page shows them.

Route

From Friedelsheim junction to Bruchwiesenstraße junction · 7 junctions and interchanges

about 14 km along the points of the Location Code List (schematic)

Through Rhineland-Palatinate (state by the nearest municipality of each junction)

Junction strip

The junctions in their order, with what is reported at each.

  1. 1 Friedelsheim junction parking
  2. 4 Maxdorf junction 1 roadworks · parking · charging
  3. 5 Ludwigshafen interchange meets A61 1 closure · 3 roadworks · parking
  4. 6 Ruchheim junction parking · charging
  5. 7 Oggersheimer Kreuz interchange 3 roadworks · parking · charging
  6. 8 Oggersheim-Süd junction 1 roadworks
  7. 9 Bruchwiesenstraße junction 1 roadworks · parking · charging

Places on the A650

Parking and rest

More car parks mapped by OpenStreetMap

  • Mitfahrerparkplatz · at Friedelsheim junction · 300 m
  • Mitfahrerparkplatz · at Maxdorf junction · 150 m
  • Bauhof · at Ludwigshafen interchange · 850 m
  • dm · at Ludwigshafen interchange · 800 m
  • REWE · at Ludwigshafen interchange · 800 m
  • Kurt-Kreiselmaier-Platz · at Ruchheim junction · 1.0 km
  • IGSLO · at Oggersheimer Kreuz interchange · 550 m
  • Anne-Frank-Schule · at Bruchwiesenstraße junction · 100 m
  • McDonald's · at Bruchwiesenstraße junction · 100 m
  • Skiclub Ludwigshafen · at Bruchwiesenstraße junction · 1.0 km

OSM-Standortdaten: © OpenStreetMap-Mitwirkende, ODbL 1.0 · licence text

These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.

Charging

Charging stations within 600 m of the junctions and service areas. Charging stations read 09:12; each point's status with its own time.

  • ALDI SE & Co. KG Kirchheim · 3 charge points · up to 150 kW · status from 07:00 — possibly out of date · at Maxdorf junction
  • Erfurter Ring · 2 charge points · up to 50 kW · no status data · at Ruchheim junction
  • PEKO GmbH - Anlagenbau, Wartung, Instandhaltung · 10 charge points · up to 22 kW · no status data · at Ruchheim junction
  • amperio GmbH (DEAMP) · 2 charge points · up to 22 kW · no status data · at Oggersheimer Kreuz interchange
  • Pfalzwerke AG · 8 charge points · up to 300 kW · no status data · at Oggersheimer Kreuz interchange
  • Pfalzwerke Ladestation (BAUHAUS) · 8 charge points · up to 300 kW · status from 04:26 — possibly out of date · at Oggersheimer Kreuz interchange
  • Technische Werke Ludwigshafen am Rhein AG · 2 charge points · up to 22 kW · no status data · at Oggersheimer Kreuz interchange
  • Ludwigshafen am Rhein - Ludwig-Reichling-Straße bei Haus 54 · 2 charge points · up to 22 kW · status from 20 Oct, 09:44 — possibly out of date · at Bruchwiesenstraße junction
  • Shell Recharge OBN 0222 - Shell Val-Bauer-Strasse · 4 charge points · up to 300 kW · status from 20 Oct, 17:31 — possibly out of date · at Bruchwiesenstraße junction
  • Technische Werke Ludwigshafen am Rhein AG · 2 charge points · up to 22 kW · no status data · at Bruchwiesenstraße junction

Only a few operators publish live occupancy; “no status data” means unknown, not free.

Fast charging from 150 kW and power classes

Longest stretch without a charging site of 150 kW or more: from Maxdorf junction to Oggersheimer Kreuz interchange, about 5.5 km (schematic).

By power: under 50 kW: 5 · 50 to 149 kW: 1 · 150 kW and up: 4.

Our count of the sites above (within the distance named from a junction or service area) – whether one is free, the list says.

Ladesäulenregister: Bundesnetzagentur.de, CC BY 4.0, bearbeitet · licence text

Ladepunkte: Eco-Movement via Mobilithek, CC BY 4.0, bearbeitet · licence text

Ladepunkt-Verfügbarkeit: Eco-Movement via Mobilithek, CC BY 4.0, bearbeitet · licence text

Ladepunkt-Verfügbarkeit: Hamburger Energienetze GmbH (eRound) via Mobilithek, CC0 1.0

Ladepunkte: Hamburger Energienetze GmbH (eRound) via Mobilithek, CC0 1.0

Ladepunkt-Verfügbarkeit: vaylens GmbH via Mobilithek, CC0 1.0

Ladepunkte: vaylens GmbH via Mobilithek, CC0 1.0

Ladepunkt-Verfügbarkeit: Wirelane GmbH via Mobilithek, CC0 1.0

Ladepunkte: Wirelane GmbH via Mobilithek, CC0 1.0

Weather along the motorway

Official warnings of the Deutscher Wetterdienst

No official warning along the motorway.

Fuel prices

We load the prices of the filling stations along the motorway only when you ask for them. Loading the prices needs JavaScript on this page.

On every motorway

Lorry driving ban

On Sundays and public holidays, lorries over 7.5 t and lorries with trailers may not drive between 00:00 and 22:00. (§ 30 Abs. 3 StVO)

Next ban day: Sunday 25 October.

The motorway's states by the nearest municipality of each junction. Holidays per § 30 Abs. 4 StVO, reviewed 8 October 2026 · Informational, not legal advice.

  • On the Autobahn there is no general speed limit where no sign says otherwise; the advisory speed is 130 km/h. Drive faster and you can share liability in a crash. (Autobahn-Richtgeschwindigkeits-V)
  • Rescue lane: as soon as traffic slows on a motorway or rural road with at least two lanes per direction, keep a lane free between the leftmost lane and the one beside it — immediately, not once the blue lights arrive. (§ 11 Abs. 2 StVO)
  • 112 reaches ambulance and fire service (Europe-wide), 110 the police — free from any network, credit or not. (Notrufverordnung (NotrufV))

Reviewed 19 September 2026 · Informational, not legal advice.

All motorways