Münstermaifeld Schebenstraße between Severusstraße and Pilligertorstraße Construction site, closed, from 11/11/2026, 00:00 to 31/12/2026, 23:59 Full lock Schebenstr. 4 during the … · Original (German) →Full text
Münstermaifeld Schebenstraße between Severusstraße and Pilligertorstraße Construction site, closed, from 11/11/2026, 00:00 to 31/12/2026, 23:59 Full lock Schebenstr. 4 during the period 11/11-31/1226 / The absolute stopping ban extends from 11/1126 to 13/1126 from the junction Josefstraße/Pilligertorstraße, in the direction of travel node Pilligertorstraße/Schebenstraße/Bornstraße.