B423 Richtung Altenglan between Abzweig nach Höchen and Schönenberg-Kübelberg Construction site, closed until 18/12/2026, 16:30 Full lock of K 4 in OD Schönenberg-Kübelberg, zw. … · Original (German) →Full text
B423 Richtung Altenglan between Abzweig nach Höchen and Schönenberg-Kübelberg Construction site, closed until 18/12/2026, 16:30 Full lock of K 4 in OD Schönenberg-Kübelberg, zw. Node K 4 / B 423 and local exit panel according to Schmittweiler, in two construction phases. From Schönenberg-Kübelberg the signposted diversion U12 runs via B 423 to Waldmohr and L 354 towards Dunzweiler / Schmittweiler. In the opposite direction the signposted diversion U13 to Schönenberg-Kübelberg is indicated.