Beta ViaFrei is in beta: answers and coverage can change, and the AI can make mistakes. Please check important details with the source named. What this means
Thür
Everything ViaFrei knows about Thür right now – from open data, with the source of every figure.
Yellow — Roadworks narrowing the road · Kottenheim, Hausener Straße zwischen Kreisverkehr und Burgstraße · 1.8 km
Within 5.0 km of Thür.
3 × Roadworks narrowing the road · Verkehrsmeldungen der Polizei: Landesbetrieb Straßenbau NRW (VIZ.NRW) via Mobilithek, Datenlizenz Deutschland – Zero – Version 2.0
Schematic map – not for navigation.Streets (OpenStreetMap)Buses and trainsChargingLorry parking and rest areas
The streets come from our street database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Red for a full closure of the carriageway, a wrong-way driver, objects, people or animals on the road, an accident with a closure, a weather warning of level 3–4 or a jam with a delay of 30 minutes or more.
Yellow for a shorter jam, roadworks narrowing the road, another traffic warning, a weather warning of level 1–2, slippery roads in the road-weather forecast, a closed entry or exit — or when a source is missing or out of date.
Green only when none of this is reported nearby and both the traffic messages and the German Weather Service's warnings for this place can be read. Green is no guarantee of a clear road.
Read: every traffic message for this place within 5.0 km (Autobahn GmbH, police, Land and city) and the German Weather Service (warnings, road weather).
No colour from: parking, charging, fuel, buses and trains.
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
0 closures · 0 jams and accidents · 5 roadworks within 5.0 km
1.8 kmdirection unknownMon 26 Oct, 00:00 – Sat 14 Nov, 23:59 · in force now, ends in 14 daysRestriction unknownRoadworksMap · Google MapsAutomatic translation: Kottenheim, Hausener Straße between Kreisverkehr and Burgstraße Construction site, closed, from 26/10/2026, 00:00 to 14/11/2026, 23:59 Extra-local detour signs for full lock … · Original (German) →Full text
Kottenheim, Hausener Straße between Kreisverkehr and Burgstraße Construction site, closed, from 26/10/2026, 00:00 to 14/11/2026, 23:59 Extra-local detour signs for full lock Kreisverkehr Kottenheim
1.8 kmdirection unknownMon 26 Oct, 00:00 – Sat 14 Nov, 23:59 · in force now, ends in 14 daysRestriction unknownRoadworksMap · Google MapsAutomatic translation: Kottenheim, Hausener Straße between Burgstraße and Kreisverkehr Construction site, closed, from 26/10/2026, 00:00 to 14/11/2026, 23:59 Extra-local detour signs for full lock … · Original (German) →Full text
Kottenheim, Hausener Straße between Burgstraße and Kreisverkehr Construction site, closed, from 26/10/2026, 00:00 to 14/11/2026, 23:59 Extra-local detour signs for full lock Kreisverkehr Kottenheim
4.1 kmdirection unknownMon 10 Aug, 00:00 – Mon 30 Nov, 23:59 · in force now, ends in 30 daysRestriction unknownRoadworksMap · Google MapsAutomatic translation: Kreis Mayen-Koblenz L82 between Abzweig nach Mayen and Ettringen Maintenance work, from 10/08/2026, 00:00 to 30/11/2026, 23:59 Semi-sided blocking or Traffic restriction due to … · Original (German) →Full text
Kreis Mayen-Koblenz L82 between Abzweig nach Mayen and Ettringen Maintenance work, from 10/08/2026, 00:00 to 30/11/2026, 23:59 Semi-sided blocking or Traffic restriction due to cable laying
Rhineland-Palatinate: we do not hold federal or state roads – for them this is no all-clear
The publishers' own texts are on the German page.
Translated automatically by ViaFrei; the German original is binding. Opus-MT, Helsinki-NLP (Tiedemann, Thottingal) (CC BY 4.0)
For lorries
Long-lorry positive network nearby: B262 550 m, A61 3.1 km, A48 5.0 km, L113 5.0 km, B256 6.4 km, L117 7.5 km
What binds is the Annex to § 2(1) of the LKWÜberlStVAusnV. The publisher states that the data make no claim to be complete or correct, have no legal or official meaning, and are not suitable for navigation or similar purposes.
Ask your AI assistant:Are there closures or jams near Thür?
Ask your AI assistant:Tell me here in this chat when the traffic situation near Thür changes.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →
A61 · between Sinzig interchange (31) and Bad Neuenahr interchange (30) · near Sinzig · Rhineland-Palatinate (placed by ViaFrei)towards Nettetalplanned 3 Nov, 19:00–4 Nov, 05:00 · further time windows: 2Hard shoulder closed · Speed limit 80 km/hChanged traffic layout: setting up and removing the roadworks barriersMap · Google Maps
Short-duration roadworks are planned at short notice and often changed; they replace neither a permit for oversize and heavy transport nor the route check before setting off (our translation of the publisher's note).
Westenergie Metering GmbH, MarktplatzMendig · 2 charge points · up to 22 kW · status from 30 Oct, 15:34 — possibly out of date · 1.7 km north · Map · Google Maps
Westenergie Metering GmbH, Bahnstr. 39Mendig · 4 charge points · up to 22 kW · status from 30 Oct, 17:04 — possibly out of date · 1.7 km north-east · Map · Google Maps
Caspar-Clemens-Pickel-Str. 3Kottenheim · 12 charge points · up to 22 kW · no status data, per charging point register · 1.8 km south-west · Map · Google Maps
Only a few operators publish live occupancy; “no status data” means unknown, not free.
Ask your AI assistant:Where is the nearest charging station in Thür?
Ask your AI assistant:Tell me here in this chat as soon as a charge point turns free at the nearest charging station in Thür.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →