Beta ViaFrei is in beta: answers and coverage can change, and the AI can make mistakes. Please check important details with the source named. What this means
Strullendorf
Everything ViaFrei knows about Strullendorf right now – from open data, with the source of every figure.
The streets come from our street database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Red for a full closure of the carriageway, a wrong-way driver, objects, people or animals on the road, an accident with a closure, a weather warning of level 3–4 or a jam with a delay of 30 minutes or more.
Yellow for a shorter jam, roadworks narrowing the road, another traffic warning, a weather warning of level 1–2, slippery roads in the road-weather forecast, a closed entry or exit — or when a source is missing or out of date.
Green only when none of this is reported nearby and both the traffic messages and the German Weather Service's warnings for this place can be read. Green is no guarantee of a clear road.
Read: every traffic message for this place within 5.0 km (Autobahn GmbH, police, Land and city) and the German Weather Service (warnings, road weather).
No colour from: parking, charging, fuel, buses and trains.
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
0 closures · 0 jams and accidents · 4 roadworks within 5.0 km
A73 1.5 kmdirection unknownWed 1 Apr, 00:00 – Sat 28 Nov, 23:59 · in force now, ends in 27 daysRestriction unknownRoadworksMap · Google MapsAutomatic translation: A73 Bamberg towards Nürnberg between Bamberg-Süd and Hirschaid: roadworks, from 01/04/2026, 00:00 to 28/11/2026, 23:59 · Original (German) →
B505 2.4 kmdirection unknownMon 27 Apr, 07:30 – Thu, 30 Sept 2027, 15:00 · in force now, ends in 333 daysRestriction unknownRestrictionMap · Google MapsAutomatic translation: B505 Bamberg Richtung Höchstadt between B22, Bamberg-Süd and Pettstadt Road narrowing, bridge work, up to 30/09/2027, 15:00 · Original (German) →
B22 2.6 kmdirection unknownMon 27 Apr, 07:30 – Thu, 30 Sept 2027, 15:00 · in force now, ends in 333 daysRestriction unknownRestrictionMap · Google MapsAutomatic translation: B22, St2244 Bamberg direction Forchheim between B505, Bamberg-Süd and S2244 nördlich von Strullendorf Road narrowing, bridge work until 30/09/2027, 15:00 · Original (German) →
Bavaria: we do not hold state roads – for them this is no all-clear
The publishers' own texts are on the German page.
Translated automatically by ViaFrei; the German original is binding. Opus-MT, Helsinki-NLP (Tiedemann, Thottingal) (CC BY 4.0)
Autobahn GmbH's motorway reports are on the “Motorways” card.
For lorries
Long-lorry positive network nearby: S2244 500 m, B505 1.1 km, A73 1.4 km, B22 2.6 km, A70 9.9 km, S2281 11 km
What binds is the Annex to § 2(1) of the LKWÜberlStVAusnV. The publisher states that the data make no claim to be complete or correct, have no legal or official meaning, and are not suitable for navigation or similar purposes.
Ask your AI assistant:Are there closures or jams near Strullendorf?
Ask your AI assistant:Tell me here in this chat when the traffic situation near Strullendorf changes.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →
A73 · between Coburg junction (7) and Schleusingen junction (4) · near Rödental · Bavaria (placed by ViaFrei)towards Suhlplanned for now, 07:00–18:00 · further time windows: 31 of 2 lanes closed · Hard shoulder closed · Speed limit 80 km/hMaintenance works: verge mowing and tree careMap · Google Maps
A73 · between Eisfeld-Süd junction (6) and Eisfeld-Nord junction (5) · Thuringia (placed by ViaFrei)towards Suhlplanned 2 Nov, 07:00–2 Nov, 17:00 · further time windows: 3Hard shoulder closed · Speed limit 80 km/hMaintenance works: sign and gantry worksMap · Google Maps
Short-duration roadworks are planned at short notice and often changed; they replace neither a permit for oversize and heavy transport nor the route check before setting off (our translation of the publisher's note).
The publisher's wording is on the German page.
Nearby
A73Hirschaid - Bamberg-Süd · 1.5 kmboth directionsfrom Wed 1 Apr, 00:00, end not reported · in force nowRestriction unknownRoadworksMap · Google Mapsbetween 4.7 km after AS Hirschaid and 2.1 km before AS Bamberg-Süd · 0.1 km long · 6.25 m wide to pass · 1 Apr – 29 Nov
Strullendorf - RathausForchheimer Straße 32, Strullendorf · 2 charge points · up to 22 kW · occupied(as of 16:19) · 200 m south-east · Map · Google Maps
EnBW mobility+ AG und Co.KG, Amlingstadter Str. 45Hirschaid · 2 charge points · up to 50 kW · no status data, per charging point register · 2.4 km south-east · Map · Google Maps
Schule PettstadtSchulstraße 12, Pettstadt · 2 charge points · up to 22 kW · 2 of 2 free(as of 16:19) · 2.9 km south-west · Map · Google Maps
Only a few operators publish live occupancy; “no status data” means unknown, not free.
Ask your AI assistant:Where is the nearest charging station in Strullendorf?
Ask your AI assistant:Tell me here in this chat as soon as a charge point turns free at the nearest charging station in Strullendorf.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →