Beta ViaFrei is in beta: answers and coverage can change, and the AI can make mistakes. Please check important details with the source named. What this means
Schwarzenfeld
Everything ViaFrei knows about Schwarzenfeld right now – from open data, with the source of every figure.
The streets come from our street database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Red for a full closure of the carriageway, a wrong-way driver, objects, people or animals on the road, an accident with a closure, a weather warning of level 3–4 or a jam with a delay of 30 minutes or more.
Yellow for a shorter jam, roadworks narrowing the road, another traffic warning, a weather warning of level 1–2, slippery roads in the road-weather forecast, a closed entry or exit — or when a source is missing or out of date.
Green only when none of this is reported nearby and both the traffic messages and the German Weather Service's warnings for this place can be read. Green is no guarantee of a clear road.
Read: every traffic message for this place within 5.0 km (Autobahn GmbH, police, Land and city) and the German Weather Service (warnings, road weather).
No colour from: parking, charging, fuel, buses and trains.
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
0 closures · 0 jams and accidents · 3 roadworks within 5.0 km
1.1 kmdirection unknownMon 12 Oct, 07:30 – Fri 13 Nov, 15:00 · in force now, ends in 15 daysRestriction unknownRestrictionMap · Google MapsAutomatic translation: SAD3 between Abzweig nach Irlaching and Schwarzenfeld closed, cycle path closed, construction site, from 12/10/2026, 07:30 to 13/11/2026, 15:00, recommended diversion: over St … · Original (German) →Full text
SAD3 between Abzweig nach Irlaching and Schwarzenfeld closed, cycle path closed, construction site, from 12/10/2026, 07:30 to 13/11/2026, 15:00, recommended diversion: over St 2151 - SAD 21 - B 85 - SAD 3 and vice versa.
A93 1.2 kmdirection unknownTue 6 Oct, 00:00 – Sat 31 Oct, 23:59 · in force now, ends in 2 daysRestriction unknownRoadworksMap · Google MapsAutomatic translation: A93 Regensburg towards Weiden between Schwandorf-Mitte and Schwarzenfeld: roadworks, from 06/10/2026, 00:00 to 31/10/2026, 23:59 · Original (German) →
2.6 kmdirection unknownMon 12 Oct, 07:30 – Fri 13 Nov, 15:00 · in force now, ends in 15 daysRestriction unknownRestrictionMap · Google MapsAutomatic translation: SAD3 closed between Schwarzenfeld and Abzweig nach Irlaching, construction site, from 12/10/2026, 07:30 to 13/11/2026, 15:00, recommended diversion: over St 2151 - SAD 21 - B 85 - … · Original (German) →Full text
SAD3 closed between Schwarzenfeld and Abzweig nach Irlaching, construction site, from 12/10/2026, 07:30 to 13/11/2026, 15:00, recommended diversion: over St 2151 - SAD 21 - B 85 - SAD 3 and vice versa.
Bavaria: we do not hold state roads – for them this is no all-clear
The publishers' own texts are on the German page.
Translated automatically by ViaFrei; the German original is binding. Opus-MT, Helsinki-NLP (Tiedemann, Thottingal) (CC BY 4.0)
Autobahn GmbH's motorway reports are on the “Motorways” card.
For lorries
Long-lorry positive network nearby: A93 700 m, S2151 750 m, A6 7.0 km, B85 8.4 km, S2398 16 km, B14 16 km
What binds is the Annex to § 2(1) of the LKWÜberlStVAusnV. The publisher states that the data make no claim to be complete or correct, have no legal or official meaning, and are not suitable for navigation or similar purposes.
Ask your AI assistant:Are there closures or jams near Schwarzenfeld?
Ask your AI assistant:Tell me here in this chat when the traffic situation near Schwarzenfeld changes.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →
Short-duration roadworks are planned at short notice and often changed; they replace neither a permit for oversize and heavy transport nor the route check before setting off (our translation of the publisher's note).
The publisher's wording is on the German page.
Nearby
A93Schwarzenfeld - Nabburg · 2.9 kmtowards Weidenfrom Thu 29 Oct, 11:50, end not reported · in force now+14 minJamMap · Google Mapsbetween 2.7 km after AS Schwarzenfeld and 0.2 km before AS Nabburg
A93Lindenlohe - Hirtlohe · 4.1 kmtowards Regensburgtime not reportedRestriction unknownRoadworksMap · Google Mapsbetween 1.8 km after Lindenlohe and 1.5 km before Hirtlohe · 6.02 km long · 4 m wide to pass · 29 Oct, 12:30–15:00
bayernwerk e-mobil Ladestation Markt SchwarzenfeldViktor-Koch-Straße 4, Schwarzenfeld · 2 charge points · up to 22 kW · status from 28 Oct, 04:52 — possibly out of date · 250 m west · Map · Google Maps
E.ON Drive GmbH, Viktor-Koch-Straße 4Schwarzenfeld · 4 charge points · up to 22 kW · no status data, per charging point register · 250 m west · Map · Google Maps
ENBW, Morgenlandstraße 5Schwarzenfeld · 9 charge points · up to 300 kW · no status data · 250 m south · Map · Google Maps
Asklepios Klinik Lindenlohe ILindenlohe 18, Schwandorf · 4 charge points · up to 11 kW · 4 of 4 free(as of 13:27) · 3.7 km south · Map · Google Maps
Only a few operators publish live occupancy; “no status data” means unknown, not free.
Ask your AI assistant:Where is the nearest charging station in Schwarzenfeld?
Ask your AI assistant:Tell me here in this chat as soon as a charge point turns free at the nearest charging station in Schwarzenfeld.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →