Donnersbergkreis, Alsenzstraße between Imsweiler and Dörrmoschel Construction site, closed, Fr between 07:00 and 16:30 Full lock in the OD Imsweiler from junction Stat. km 2+895 … · Original (German) →Full text
Donnersbergkreis, Alsenzstraße between Imsweiler and Dörrmoschel Construction site, closed, Fr between 07:00 and 16:30 Full lock in the OD Imsweiler from junction Stat. km 2+895 to Alsenstraße 99, for the ceiling renovation in the second phase of construction. The signposted detour crosses the B 48 via the southern access of the L 367 to Imsweiler. The detour is also signposted in the opposite direction.