Beta ViaFrei is in beta: answers and coverage can change, and the AI can make mistakes. Please check important details with the source named. What this means
March
Everything ViaFrei knows about March right now – from open data, with the source of every figure.
The streets come from our street database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Red for a full closure of the carriageway, a wrong-way driver, objects, people or animals on the road, an accident with a closure, a weather warning of level 3–4 or a jam with a delay of 30 minutes or more.
Yellow for a shorter jam, roadworks narrowing the road, another traffic warning, a weather warning of level 1–2, slippery roads in the road-weather forecast, a closed entry or exit — or when a source is missing or out of date.
Green only when none of this is reported nearby and both the traffic messages and the German Weather Service's warnings for this place can be read. Green is no guarantee of a clear road.
Read: every traffic message for this place within 5.0 km (Autobahn GmbH, police, Land and city) and the German Weather Service (warnings, road weather).
No colour from: parking, charging, fuel, buses and trains.
Park and ride · Moosweiher · 81 spaces · 52 free, operator's status: openTraffic light: Green(as of 17:08) · 3.4 km south-east · Map · Google MapsFacilities: not reportedNearby per OpenStreetMap (straight line): shop 140 m · café 210 m · restaurant 270 m
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
More car parks mapped by OpenStreetMap
Parkplatz Bahnhof · 700 m south-east · Map · Google Maps
Parkplatz Industriestraße · 750 m south-east · Map · Google Maps
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
0 closures · 0 jams and accidents · 3 roadworks within 15 km
B31AUmkirch-Freiburg · 6.0 kmdirection unknownMon 24 Aug, 00:00 – Fri, 23 Jul 2027, 23:59 · in force now, ends in 266 daysRestriction unknownRoadworksMap · Google MapsAutomatic translation: Construction phase 1 · Original (German) →
L110Denzlingen-Sexau · 8.8 kmdirection unknownWed 13 May, 00:00 – Fri, 31 Dec 2027, 23:59 · in force now, ends in 427 daysRestriction unknownRoadworksMap · Google MapsAutomatic translation: Construction phase · Original (German) →
L186Sexau-Waldkirch · 11 kmdirection unknownWed 13 May, 00:00 – Fri, 31 Dec 2027, 23:59 · in force now, ends in 427 daysRestriction unknownRoadworksMap · Google MapsAutomatic translation: Construction phase · Original (German) →
Nothing right here — the nearest within 15 km
Translated automatically by ViaFrei; the German original is binding. Opus-MT, Helsinki-NLP (Tiedemann, Thottingal) (CC BY 4.0)
Autobahn GmbH's motorway reports are on the “Motorways” card.
City and Land roadworks, now
Roadworks · until 31 Oct 2026 · 2.8 km · Map · Google Maps
Roadworks · full closure · until 6 Nov 2026 · 3.5 km · Map · Google Maps
Roadworks · full closure · until 18 Dec 2026 · 4.3 km · Map · Google Maps
The names of the sites are on the German page.
For lorries
Long-lorry positive network nearby: A5 2.3 km, L103 24 km
What binds is the Annex to § 2(1) of the LKWÜberlStVAusnV. The publisher states that the data make no claim to be complete or correct, have no legal or official meaning, and are not suitable for navigation or similar purposes.
Ask your AI assistant:Are there closures or jams near March?
Ask your AI assistant:Tell me here in this chat when the traffic situation near March changes.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →
A5 · between Appenweier junction (54) and Achern junction (53) · near Willstätt · Baden-Württemberg (placed by ViaFrei)towards Hattenbacher Dreieckplanned 20:00–31 Oct, 05:002 of 3 lanes closed · Hard shoulder closed · Speed limit 80 km/hMaintenance works: clearing up after an accidentMap · Google Maps
A5 · between Bruchsal junction (42) and Walldorf interchange (40) · near Karlsdorf-Neuthard · Baden-Württemberg (placed by ViaFrei)both directionsplanned 2 Nov, 09:00–2 Nov, 15:30 · further time windows: 41 of 3 lanes closed · Speed limit 80 km/hChanged traffic layout: setting up and removing the roadworks barriersMap · Google Maps
Short-duration roadworks are planned at short notice and often changed; they replace neither a permit for oversize and heavy transport nor the route check before setting off (our translation of the publisher's note).
The publisher's wording is on the German page.
Nearby
A5Freiburg-Mitte - Teningen · 2.6 kmtowards Karlsruhefrom Fri 30 Oct, 16:46, end not reported · in force now+8 minJamMap · Google Mapsbetween 1.6 km after AS Freiburg-Mitte and 5.3 km before AS Teningen
A5Schlatthof - Schauinsland · 3.8 kmtowards Karlsruhefrom Fri 30 Oct, 16:29, end not reported · in force now+3 minJamMap · Google Mapsbetween 4 km after Schlatthof and 2.4 km before Schauinsland
A5Freiburg-Nord - Teningen · 4.8 kmtowards Karlsruhefrom Tue 15 Sept, 00:00, end not reported · in force nowRestriction unknownRoadworksMap · Google Mapsbetween 4 km after AS Freiburg-Nord and 0.5 km before AS Teningen · 1.8 km long · 6.2 m wide to pass · 15 Sept 2026 – 13 Mar 2027
Lorry parking · Schauinsland · 57 spaces · 15 lorry spaces · 2.3 km east · Map · Google MapsFacilities per the publisher: toilet · fuel station · picnic areaNearby per OpenStreetMap (straight line, access not checked): restaurant 10 mNearby (straight line, access not checked): EV charger 100 kW, 30 m
Lorry parking · Glotter · 8 spaces · 8 lorry spaces · 3.9 km north · Map · Google MapsFacilities per the publisher: picnic area
Lorry parking · Hölzle · 8 spaces · 8 lorry spaces · 4.7 km north · Map · Google MapsFacilities per the publisher: picnic area
Live occupancy only where the operator publishes it — ask your assistant.
Ask your AI assistant:Where is a lorry park near March?
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Truck-parking occupancy (Toll Collect, SID)
By clicking you accept the terms of use (section 2, truck parking).
Gemeinde March RathausAm Felsenkeller 2, March · 2 charge points · up to 22 kW · status from 25 Oct, 05:43 — possibly out of date, 1 without status · 250 m east · Map · Google Maps
Bauer, Am Banhof 8March · 4 charge points · up to 50 kW · no status data, per charging point register · 700 m south-east · Map · Google Maps
Bauer, Sportplatzstraße 5March · 2 charge points · up to 22 kW · no status data, per charging point register · 800 m north · Map · Google Maps
Benzstr. 11aBenzstraße 11a, March · 2 charge points · up to 22 kW · 2 of 2 free(as of 17:11) · 1.3 km south-east · Map · Google Maps
Only a few operators publish live occupancy; “no status data” means unknown, not free.
Ask your AI assistant:Where is the nearest charging station in March?
Ask your AI assistant:Tell me here in this chat as soon as a charge point turns free at the nearest charging station in March.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →