Rhein-Hunsrück-Kreis L218 between Abzweig nach Budenbach and Abzweig nach Klosterkumbd Construction site, closed, from 28/10/2026, 06:30 to 05/12/2026, 21:00 Full lock at … · Original (German) →Full text
Rhein-Hunsrück-Kreis L218 between Abzweig nach Budenbach and Abzweig nach Klosterkumbd Construction site, closed, from 28/10/2026, 06:30 to 05/12/2026, 21:00 Full lock at Landesstraße L 218 , L 220, L 223 Node at Klosterkumbd. here: In addition to the lock of the node at L 218 / L 220, the free distance of L 218 in this area shall be closed from 28/10/2026. The redirection takes place from Budenbach via Pleitzenhausen to L 218 to Simmern. As well as from L 218 via Klosterkumbd to Niederkumbd.