Beta ViaFrei is in beta: answers and coverage can change, and the AI can make mistakes. Please check important details with the source named. What this means
Laudert
Everything ViaFrei knows about Laudert right now – from open data, with the source of every figure.
ViaFrei creates no account and no profile and does not store your place. Your browser remembers a place on this device only when you choose it in the place bar – a place or an address, “Use my location” or “All of Germany” – together with your recent places; while this page uses a remembered place, a line under the place bar says so, and “Forget place” deletes it at once. The page asks for your location only when you choose “Use my location”; if you have already allowed it permanently in your browser, this page reads it without asking and stores nothing. Your location is rounded on your device to an area of about 500 m, and our server derives the street or place name for it from that area; it keeps that name in memory for at most an hour per area, without any link to you, and does not store it. It keeps the name of a station, place or address chosen here in memory for at most an hour in the same way. Your IP address is used only in memory, for the approximate location, and is not stored for it. More in the privacy policy
The streets come from our street database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Red for a full closure of the carriageway, a wrong-way driver, objects, people or animals on the road, an accident with a closure, a weather warning of level 3–4 or a jam with a delay of 30 minutes or more.
Yellow for a shorter jam, roadworks narrowing the road, another traffic warning, a weather warning of level 1–2, slippery roads in the road-weather forecast, a closed entry or exit — or when a source is missing or out of date.
Green only when none of this is reported nearby and both the traffic messages and the German Weather Service's warnings for this place can be read. Green is no guarantee of a clear road.
Read: every traffic message for this place within 5.0 km (Autobahn GmbH, police, Land and city) and the German Weather Service (warnings, road weather).
No colour from: parking, charging, fuel, buses and trains.
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
0 closures · 0 jams and accidents · 34 roadworks within 15 km
6.0 kmdirection unknownSat 17 Oct, 06:00 – Sat, 27 Mar 2027, 21:00 · in force now, ends in 145 daysRestriction unknownRoadworksMap · Google MapsAutomatic translation: Rhein-Hunsrück-Kreis, L214 between Rheinböllen and Abzweig nach Mörschbach Construction site, closed, from 17/10/2026, 06:00 to 27/03/2027, 21:00 Full lock of L 214 between … · Original (German) →Full text
Rhein-Hunsrück-Kreis, L214 between Rheinböllen and Abzweig nach Mörschbach Construction site, closed, from 17/10/2026, 06:00 to 27/03/2027, 21:00 Full lock of L 214 between Liebshausen and Rheinböllen The diversion takes place from Liebshausen via Mörschbach to Rheinböllen.
6.6 kmdirection unknownWed 28 Oct, 06:30 – Sat 5 Dec, 21:00 · in force now, ends in 33 daysRestriction unknownRoadworksMap · Google MapsAutomatic translation: Rhein-Hunsrück-Kreis L218 between Abzweig nach Budenbach and Abzweig nach Klosterkumbd Construction site, closed, from 28/10/2026, 06:30 to 05/12/2026, 21:00 Full lock at … · Original (German) →Full text
Rhein-Hunsrück-Kreis L218 between Abzweig nach Budenbach and Abzweig nach Klosterkumbd Construction site, closed, from 28/10/2026, 06:30 to 05/12/2026, 21:00 Full lock at Landesstraße L 218 , L 220, L 223 Node at Klosterkumbd. here: In addition to the lock of the node at L 218 / L 220, the free distance of L 218 in this area shall be closed from 28/10/2026. The redirection takes place from Budenbach via Pleitzenhausen to L 218 to Simmern. As well as from L 218 via Klosterkumbd to Niederkumbd.
7.1 kmboth directionsMon 19 Oct, 06:30 – Sat 5 Dec, 21:00 · in force now, ends in 33 daysRestriction unknownRoadworksMap · Google MapsAutomatic translation: Rhein-Hunsrück-Kreis L220 between Abzweig nach Laubach and Abzweig nach Pleizenhausen Construction site, closed, from 19/10/2026, 06:30 to 05/12/2026, 21:00 Full lock at … · Original (German) →Full text
Rhein-Hunsrück-Kreis L220 between Abzweig nach Laubach and Abzweig nach Pleizenhausen Construction site, closed, from 19/10/2026, 06:30 to 05/12/2026, 21:00 Full lock at Landesstraße L 218 , L 220, L 223 Node at Klosterkumbd. The redirection takes place from Budenbach via Pleitzenhausen to L 218 to Simmern.
Rhineland-Palatinate: we do not hold federal or state roads – for them this is no all-clear
Nothing right here — the nearest within 15 km
The publishers' own texts are on the German page.
Translated automatically by ViaFrei; the German original is binding. Opus-MT, Helsinki-NLP (Tiedemann, Thottingal) (CC BY 4.0)
Autobahn GmbH's motorway reports are on the “Motorways” card.
For lorries
no lorry restriction listed within 5 km (ivm Frankfurt RheinMain) — this is not an all-clear, the signs on site apply
Long-lorry positive network nearby: A61 1.0 km, B50 9.9 km, B42 23 km
What binds is the Annex to § 2(1) of the LKWÜberlStVAusnV. The publisher states that the data make no claim to be complete or correct, have no legal or official meaning, and are not suitable for navigation or similar purposes.
Ask your AI assistant:Are there closures or jams near Laudert?
Ask your AI assistant:Tell me here in this chat when the traffic situation near Laudert changes.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →
A61 · between Sinzig interchange (31) and Bad Neuenahr interchange (30) · near Sinzig · Rhineland-Palatinate (placed by ViaFrei)towards Nettetalplanned 3 Nov, 19:00–4 Nov, 05:00 · further time windows: 2Hard shoulder closed · Speed limit 80 km/hChanged traffic layout: setting up and removing the roadworks barriersMap · Google Maps
Short-duration roadworks are planned at short notice and often changed; they replace neither a permit for oversize and heavy transport nor the route check before setting off (our translation of the publisher's note).
The publisher's wording is on the German page.
Nearby
A61Rheinböllen - Hunsrück-West · 12 kmtowards Ludwigshafenfrom Mon, 9 Dec 2024, 05:00, end not reported · in force nowRestriction unknownRoadworksMap · Google Mapsbetween 1.3 km after AS Rheinböllen and 1.1 km before Hunsrück-West · 4.67 km long · 6.25 m wide to pass · 9 Dec 2024 – 1 Apr 2029
Lorry parking · Shell Autohof Pfalzfeld · 91 spaces · 47 lorry spaces · 4.6 km north · Map · Google MapsFacilities: not reportedNearby per OpenStreetMap (straight line, access not checked): café 210 m · snack bar 210 mNearby (straight line, access not checked): EV charger 225 kW, 210 m (DE*EWE)
Live occupancy only where the operator publishes it — ask your assistant.
Ask your AI assistant:Where is a lorry park near Laudert?
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Truck-parking occupancy (Toll Collect, SID)
By clicking you accept the terms of use (section 2, truck parking).
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
8 of 8 topics shown
Ready in one minute
ViaFrei lives inside the assistant you already have. Three steps, once:
In Claude or ChatGPT: settings → “Connectors”.
Add ViaFrei with the address below.
Ask: “Is the A8 towards Munich clear right now?”
Draft — these steps are not yet verified in every assistant.
MCP endpoint (Streamable HTTP)
https://mcp.viafrei.de/mcp
Show the steps for your client
For older clients (HTTP + SSE)
https://mcp.viafrei.de/sse
Claude (desktop and claude.ai)
Settings → Connectors → “Add custom connector”.
Paste the endpoint above and save.
Ask: “Is the A8 towards Munich clear?”
Draft — these steps have not been verified on the client yet.