Beta ViaFrei is in beta: answers and coverage can change, and the AI can make mistakes. Please check important details with the source named. What this means
Kürnach
Everything ViaFrei knows about Kürnach right now – from open data, with the source of every figure.
The streets come from our street database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Warning marks: Datenbasis: Deutscher Wetterdienst, zusammengefasst
How the traffic light is set
Red for a full closure of the carriageway, a wrong-way driver, objects, people or animals on the road, an accident with a closure, a weather warning of level 3–4 or a jam with a delay of 30 minutes or more.
Yellow for a shorter jam, roadworks narrowing the road, another traffic warning, a weather warning of level 1–2, slippery roads in the road-weather forecast, a closed entry or exit — or when a source is missing or out of date.
Green only when none of this is reported nearby and both the traffic messages and the German Weather Service's warnings for this place can be read. Green is no guarantee of a clear road.
Read: every traffic message for this place within 5.0 km (Autobahn GmbH, police, Land and city) and the German Weather Service (warnings, road weather).
No colour from: parking, charging, fuel, buses and trains.
Official WARNING of FOG · Level 1 · —until 10:00What the DWD says
There is a risk of fog (level 1 of 1).
Visibility: < 150 m
Hazard(s) to expect: severely reduced visibility possible.
Recommendations for what to do:
Adapt your driving behaviour to sudden reduced visibility (fog banks).
DWD road-surface forecast for the nearest road-weather stations — a model forecast (run 04:00), not a measurement and not an official warning
The next hours at Rothofbruecke
06:00 air 2.5 °C · road surface 3.3 °C, dry
07:00 air 2.5 °C · road surface 3.9 °C, dry
08:00 air 3 °C · road surface 5.3 °C, dry
09:00 air 4.1 °C · road surface 7.1 °C, dry
10:00 air 5.3 °C · road surface 9.1 °C, dry
11:00 air 6.9 °C · road surface 11.1 °C, dry
No slippery class forecast until 30 Oct, 05:47.
Each line is for the station's own location, not for the whole road.
Ask your AI assistant:Is there a severe-weather warning for Kürnach right now?
Ask your AI assistant:Tell me here in this chat as soon as a severe-weather warning comes for Kürnach.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
0 closures · 0 jams and accidents · 1 roadworks within 5.0 km
A7 2.5 kmdirection unknownMon 28 Sept, 00:00 – Sun 29 Nov, 23:59 · in force now, ends in 32 daysRestriction unknownRoadworksMap · Google MapsAutomatic translation: A7 Ulm towards Würzburg between interchange Biebelried and Rastplatz Kapellenholz: roadworks, from 28/09/2026, 00:00 to 29/11/2026, 23:59 · Original (German) →
Bavaria: we do not hold state roads – for them this is no all-clear
The publishers' own texts are on the German page.
Translated automatically by ViaFrei; the German original is binding.
Autobahn GmbH's motorway reports are on the “Motorways” card.
For lorries
Long-lorry positive network nearby: S2260 850 m, A7 1.2 km, B19 1.8 km, B8 6.9 km, A3 8.4 km, B13 13 km
What binds is the Annex to § 2(1) of the LKWÜberlStVAusnV. The publisher states that the data make no claim to be complete or correct, have no legal or official meaning, and are not suitable for navigation or similar purposes.
Ask your AI assistant:Are there closures or jams near Kürnach?
Ask your AI assistant:Tell me here in this chat when the traffic situation near Kürnach changes.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →
Short-duration roadworks are planned at short notice and often changed; they replace neither a permit for oversize and heavy transport nor the route check before setting off (our translation of the publisher's note).
The publisher's wording is on the German page.
Nearby
A7Kapellenholz - Biebelried · 2.5 kmtowards Ulmfrom Mon 28 Sept, 00:00, end not reported · in force nowRestriction unknownRoadworksMap · Google Mapsbetween 0.6 km after Kapellenholz and 1.9 km before AK Biebelried · 4.8 km long · 5.5 m wide to pass · 28 Sept – 30 Nov