Beta ViaFrei is in beta: answers and coverage can change, and the AI can make mistakes. Please check important details with the source named. What this means
Kaub
Everything ViaFrei knows about Kaub right now – from open data, with the source of every figure.
Yellow — Roadworks narrowing the road · Rhein-Lahn-Kreis, L339 zwischen Abzweig nach Dörscheid und Kaub · 600 m
Within 5.0 km of Kaub.
3 × Roadworks narrowing the road · Verkehrsmeldungen der Polizei: Landesbetrieb Straßenbau NRW (VIZ.NRW) via Mobilithek, Datenlizenz Deutschland – Zero – Version 2.0
Schematic map without the street network – not for navigation.
Red for a full closure of the carriageway, a wrong-way driver, objects, people or animals on the road, an accident with a closure, a weather warning of level 3–4 or a jam with a delay of 30 minutes or more.
Yellow for a shorter jam, roadworks narrowing the road, another traffic warning, a weather warning of level 1–2, slippery roads in the road-weather forecast, a closed entry or exit — or when a source is missing or out of date.
Green only when none of this is reported nearby and both the traffic messages and the German Weather Service's warnings for this place can be read. Green is no guarantee of a clear road.
Read: every traffic message for this place within 5.0 km (Autobahn GmbH, police, Land and city) and the German Weather Service (warnings, road weather).
No colour from: parking, charging, fuel, buses and trains.
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
0 closures · 0 jams and accidents · 7 roadworks within 5.0 km
600 mdirection unknownMon 19 Oct, 07:00 – Mon 2 Nov, 18:00 · in force now, ends in 5 daysRestriction unknownRoadworksMap · Google Mapsthe publisher's wording: Text only in German →
900 mdirection unknownMon 19 Oct, 07:00 – Mon 2 Nov, 18:00 · in force now, ends in 5 daysRestriction unknownRoadworksMap · Google Mapsthe publisher's wording: Text only in German →
1.0 kmdirection unknownMon 1 Jun, 07:00 – Sun, 28 Feb 2027, 18:00 · in force now, ends in 123 daysRestriction unknownRoadworksMap · Google Mapsthe publisher's wording: Text only in German →
Rhineland-Palatinate: we do not hold federal or state roads – for them this is no all-clear
The publishers' own texts are on the German page.
Autobahn GmbH's motorway reports are on the “Motorways” card.
For lorries
Lorry restrictions within 5 km (ivm Frankfurt RheinMain):
Entries in range, none with a street given: 75. This is not an all-clear: the signs on site apply.
Lorry priority network: nearest section 2.4 km
Long-lorry positive network nearby: A61 9.8 km, B50 12 km, L419 20 km, A60 20 km, B48 21 km, L242 22 km
What binds is the Annex to § 2(1) of the LKWÜberlStVAusnV. The publisher states that the data make no claim to be complete or correct, have no legal or official meaning, and are not suitable for navigation or similar purposes.
These lorry entries come from our database derived from “Lkw-Vorrangnetz Frankfurt RheinMain (ivm)” (ODbL 1.0; its geometry comes from OpenStreetMap). We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Ask your AI assistant:Are there closures or jams near Kaub?
Ask your AI assistant:Tell me here in this chat when the traffic situation near Kaub changes.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →
A61 · between Alzey junction (55) and Gundersheim junction (56) · near Alzey · Rhineland-Palatinate (placed by ViaFrei)towards Hockenheimplanned 19:00–29 Oct, 05:001 of 2 lanes closed · Hard shoulder closed · Speed limit 80 km/hMaintenance works: road surface repairMap · Google Maps
A61 · between Alzey junction (55) and Gundersheim junction (56) · near Alzey · Rhineland-Palatinate (placed by ViaFrei)towards Hockenheimplanned 19:00–29 Oct, 05:00 · further time windows: 11 of 2 lanes closed · Hard shoulder closed · Speed limit 80 km/hMaintenance works: road surface repairMap · Google Maps
A61 · between Koblenz/Dieblich junction (39) and Plaidt junction (36) · near Lahnstein · Rhineland-Palatinate (placed by ViaFrei)towards Nettetalplanned 19:00–29 Oct, 05:00 · further time windows: 21 of 2 lanes closed · Speed limit 80 km/hChanged traffic layout: setting up and removing the roadworks barriersMap · Google Maps
Short-duration roadworks are planned at short notice and often changed; they replace neither a permit for oversize and heavy transport nor the route check before setting off (our translation of the publisher's note).
The publisher's wording is on the German page.
Nearby
A61Rheinböllen - Hunsrück-West · 12 kmtowards Ludwigshafenfrom Mon, 9 Dec 2024, 05:00, end not reported · in force nowRestriction unknownRoadworksMap · Google Mapsbetween 1.3 km after AS Rheinböllen and 1.1 km before Hunsrück-West · 4.67 km long · 6.25 m wide to pass · 9 Dec 2024 – 1 Apr 2029
A61Hunsrück-West - Rheinböllen · 13 kmtowards Koblenzfrom Mon, 9 Dec 2024, 05:00, end not reported · in force nowRestriction unknownRoadworksMap · Google Mapsbetween 1.1 km after Hunsrück-West and 1.3 km before AS Rheinböllen · 4.67 km long · 6.25 m wide to pass · 9 Dec 2024 – 1 Apr 2029
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Truck-parking occupancy (Toll Collect, SID)
By clicking you accept the terms of use (section 2, truck parking).
Westenergie Metering GmbH, Liebfrauenstr. 25Oberwesel · 2 charge points · up to 22 kW · status from 27 Oct, 13:29 — possibly out of date · 3.2 km north-west · Map · Google Maps
Elbag Energietechnik GmbHBrückenstr. 28, Weisel · 7 charge points · up to 33 kW · no status data, per charging point register · 3.6 km north-east · Map · Google Maps
Westenergie Metering GmbH, Mainzer Straße 10Bacharach · 2 charge points · up to 22 kW · status from 08:25 — possibly out of date · 3.7 km south · Map · Google Maps
Only a few operators publish live occupancy; “no status data” means unknown, not free.
Ask your AI assistant:Where is the nearest charging station in Kaub?
Ask your AI assistant:Tell me here in this chat as soon as a charge point turns free at the nearest charging station in Kaub.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →