Beta ViaFrei is in beta: answers and coverage can change, and the AI can make mistakes. Please check important details with the source named. What this means
Haste
Everything ViaFrei knows about Haste right now – from open data, with the source of every figure.
The streets come from our street database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Red for a full closure of the carriageway, a wrong-way driver, objects, people or animals on the road, an accident with a closure, a weather warning of level 3–4 or a jam with a delay of 30 minutes or more.
Yellow for a shorter jam, roadworks narrowing the road, another traffic warning, a weather warning of level 1–2, slippery roads in the road-weather forecast, a closed entry or exit — or when a source is missing or out of date.
Green only when none of this is reported nearby and both the traffic messages and the German Weather Service's warnings for this place can be read. Green is no guarantee of a clear road.
Read: every traffic message for this place within 5.0 km (Autobahn GmbH, police, Land and city) and the German Weather Service (warnings, road weather).
No colour from: parking, charging, fuel, buses and trains.
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
0 closures · 0 jams and accidents · 14 roadworks within 15 km
5.6 kmdirection unknownFri 17 Jul, 06:15 – Mon 9 Nov, 23:59 · in force now, ends in 11 daysRestriction unknownRestrictionMap · Google MapsAutomatic translation: A2 Hannover Richtung Dortmund between Wunstorf-Luthe and Wunstorf-Kolenfeld changed traffic management in the construction site area, permanent construction site, up to approx. … · Original (German) →Full text
A2 Hannover Richtung Dortmund between Wunstorf-Luthe and Wunstorf-Kolenfeld changed traffic management in the construction site area, permanent construction site, up to approx. 09/11/2026, 23:59
6.1 kmdirection unknownMon, 31 Mar 2025, 06:15 – Tue, 30 Mar 2027, 17:00 · in force now, ends in 152 daysRestriction unknownRestrictionMap · Google MapsAutomatic translation: Wunstorf, Gustav-Kohne-Straße to Luther Weg between Frankestraße and Friedrichstraße in both directions Bahnübergang: closed, roadworks, a local diversion is in place, until … · Original (German) →Full text
Wunstorf, Gustav-Kohne-Straße to Luther Weg between Frankestraße and Friedrichstraße in both directions Bahnübergang: closed, roadworks, a local diversion is in place, until approx. 30/03/2027, 17:00
8.9 kmdirection unknownFri 17 Jul, 06:15 – Mon 9 Nov, 23:59 · in force now, ends in 11 daysRestriction unknownRestrictionMap · Google MapsAutomatic translation: A2 Dortmund Richtung Hannover between Wunstorf-Kolenfeld and Wunstorf-Luthe changed traffic in the construction site area, temporary limitation of road width to 5.20 m, permanent … · Original (German) →Full text
A2 Dortmund Richtung Hannover between Wunstorf-Kolenfeld and Wunstorf-Luthe changed traffic in the construction site area, temporary limitation of road width to 5.20 m, permanent construction site, up to approx. 09/11/2026, 23:59
Nothing right here — the nearest within 15 km
The publishers' own texts are on the German page.
Translated automatically by ViaFrei; the German original is binding. Opus-MT, Helsinki-NLP (Tiedemann, Thottingal) (CC BY 4.0)
Autobahn GmbH's motorway reports are on the “Motorways” card.
For lorries
Long-lorry positive network nearby: A2 3.6 km, L392 5.2 km, B441 6.8 km, B442 11 km, L390 13 km, B6 13 km
What binds is the Annex to § 2(1) of the LKWÜberlStVAusnV. The publisher states that the data make no claim to be complete or correct, have no legal or official meaning, and are not suitable for navigation or similar purposes.
Ask your AI assistant:Are there closures or jams near Haste?
Ask your AI assistant:Tell me here in this chat when the traffic situation near Haste changes.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →
A2 · between Theessen junction (75) and Ziesar junction (76) · Brandenburg (placed by ViaFrei)towards Kloster Lehninplanned for now, 08:00–14:151 of 3 lanes closed · Speed limit 80 km/hMaintenance works: verge mowing and tree careMap · Google Maps
A2 · between Bad Eilsen-Ost junction (35) and Rehren junction (36) · near Rinteln · Lower Saxony (placed by ViaFrei)towards Kloster Lehninplanned for now, 09:00–17:00 · further time windows: 11 of 3 lanes closed · Hard shoulder closedMaintenance works: verge mowing and tree careMap · Google Maps
A2 · between Herten junction (7) and Gelsenkirchen-Buer junction (6) · near Gladbeck · North Rhine-Westphalia (placed by ViaFrei)towards Bottropplanned for now, 09:00–15:00 · further time windows: 21 of 3 lanes closed · Speed limit 80 km/hMaintenance works: verge mowing and tree careMap · Google Maps
A2 · between Rehren junction (36) and Wunstorf-Luthe junction (40) · near Hessisch Oldendorf · Lower Saxony (placed by ViaFrei)towards Kloster Lehninplanned for now, 09:00–15:00 · further time windows: 41 of 3 lanes closed · Hard shoulder closed · Speed limit 80 km/hMaintenance works: verge mowing and tree careMap · Google Maps
A2 · between Bad Eilsen junction (35) and Veltheim junction (34) · near Porta Westfalica · North Rhine-Westphalia (placed by ViaFrei)towards Bottropplanned for now, 09:00–15:00 · further time windows: 11 of 3 lanes closed · Hard shoulder closed · Speed limit 80 km/hMaintenance works: maintenance worksMap · Google Maps
Short-duration roadworks are planned at short notice and often changed; they replace neither a permit for oversize and heavy transport nor the route check before setting off (our translation of the publisher's note).
The publisher's wording is on the German page.
Nearby
A2Wunstorf-Kolenfeld - Bad Nenndorf · 4.0 kmtowards Dortmundfrom Thu 1 Oct, 00:00, end not reported · in force nowRestriction unknownRoadworksMap · Google Mapsbetween 5.4 km after AS Wunstorf-Kolenfeld and 1.3 km before AS Bad Nenndorf · 0.93 km long · 10 m wide to pass · 1 Oct – 1 Dec
Q1 Autostrom LadestationHauptstraße 42, Haste · 2 charge points · up to 50 kW · 2 of 2 free(as of 12:39) · 150 m south-west · Map · Google Maps
Gemeinde Hohnhorst - S98136Feldweg 1A, Hohnhorst · 2 charge points · up to 22 kW · 2 of 2 free(as of 12:39) · 750 m south-west · Map · Google Maps
Westfalen Weser Ladeservice GmbH, Feldweg 2dHaste · 2 charge points · up to 22 kW · no status data, per charging point register · 750 m south-west · Map · Google Maps
Only a few operators publish live occupancy; “no status data” means unknown, not free.
Ask your AI assistant:Where is the nearest charging station in Haste?
Ask your AI assistant:Tell me here in this chat as soon as a charge point turns free at the nearest charging station in Haste.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →