Beta ViaFrei is in beta: answers and coverage can change, and the AI can make mistakes. Please check important details with the source named. What this means
Graben
Everything ViaFrei knows about Graben right now – from open data, with the source of every figure.
The streets come from our street database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Red for a full closure of the carriageway, a wrong-way driver, objects, people or animals on the road, an accident with a closure, a weather warning of level 3–4 or a jam with a delay of 30 minutes or more.
Yellow for a shorter jam, roadworks narrowing the road, another traffic warning, a weather warning of level 1–2, slippery roads in the road-weather forecast, a closed entry or exit — or when a source is missing or out of date.
Green only when none of this is reported nearby and both the traffic messages and the German Weather Service's warnings for this place can be read. Green is no guarantee of a clear road.
Read: every traffic message for this place within 5.0 km (Autobahn GmbH, police, Land and city) and the German Weather Service (warnings, road weather).
No colour from: parking, charging, fuel, buses and trains.
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
0 closures · 0 jams and accidents · 2 roadworks within 15 km
13 kmboth directionsMon 21 Sept, 07:30 – Fri 11 Dec, 15:00 · in force now, ends in 41 daysRestriction unknownRestrictionMap · Google MapsAutomatic translation: Augsburg closed between Sonnenstraße and Jupiterstraße, construction site, until 11/12/2026, 15:00 Due to a construction measure and the related land development work, … · Original (German) →Full text
Augsburg closed between Sonnenstraße and Jupiterstraße, construction site, until 11/12/2026, 15:00 Due to a construction measure and the related land development work, Brahmsstraße is removed from the envelopment area of Jupiterstraße 21. September 2026 completely closed. The construction project is diverted via Lehárstraße. Pedestrians can pass through the construction site area on the northern sidewalk. Due to public transport and school bus transport, some parking spaces are no longer available in the Lehárstraße, Thurgauerstraße and the middle Lechfeldweg.
13 kmboth directionsMon 21 Sept, 07:30 – Fri 11 Dec, 15:00 · in force now, ends in 41 daysRestriction unknownRestrictionMap · Google MapsAutomatic translation: Augsburg Brahmsstraße closed between Leharstraße and Merkurstraße, construction site, until 11/12/2026, 15:00 Due to a construction measure and the related land development work, … · Original (German) →Full text
Augsburg Brahmsstraße closed between Leharstraße and Merkurstraße, construction site, until 11/12/2026, 15:00 Due to a construction measure and the related land development work, Brahmsstraße is closed in the envelopment area of Jupiterstraße 21. September 2026 completely closed. The construction project is diverted via Lehárstraße. Pedestrians can pass through the construction site area on the northern sidewalk. Due to public transport and school bus transport, some parking spaces are no longer available in the Lehárstraße, Thurgauerstraße and the middle Lechfeldweg.
Bavaria: we do not hold state roads – for them this is no all-clear
Nothing right here — the nearest within 15 km
The publishers' own texts are on the German page.
Translated automatically by ViaFrei; the German original is binding. Opus-MT, Helsinki-NLP (Tiedemann, Thottingal) (CC BY 4.0)
For lorries
Long-lorry positive network nearby: B17 1.8 km, S2380 8.3 km, A96 14 km, B2 14 km, B300 19 km, B12 20 km
What binds is the Annex to § 2(1) of the LKWÜberlStVAusnV. The publisher states that the data make no claim to be complete or correct, have no legal or official meaning, and are not suitable for navigation or similar purposes.
Ask your AI assistant:Are there closures or jams near Graben?
Ask your AI assistant:Tell me here in this chat when the traffic situation near Graben changes.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →
Short-duration roadworks are planned at short notice and often changed; they replace neither a permit for oversize and heavy transport nor the route check before setting off (our translation of the publisher's note).
Lorry parking · Lechwiesen Nord · 98 spaces · 48 lorry spaces · 15 km south · Map · Google MapsFacilities per the publisher: toilet · shower · picnic area · playgroundNearby per OpenStreetMap (straight line, access not checked): café 70 m · snack bar 70 m · restaurant 80 mNearby (straight line, access not checked): EV charger 350 kW, 40 m (IONITY)
Lorry parking · Lechwiesen Süd · 121 spaces · 50 lorry spaces · 15 km south · Map · Google MapsFacilities per the publisher: toilet · shower · picnic area · playgroundNearby per OpenStreetMap (straight line, access not checked): café 60 m · snack bar 70 m · restaurant 70 mNearby (straight line, access not checked): EV charger 350 kW, 30 m (IONITY)
Nothing right here — the nearest within 15 km
Live occupancy only where the operator publishes it — ask your assistant.
Ask your AI assistant:Where is a lorry park near Graben?
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Truck-parking occupancy (Toll Collect, SID)
By clicking you accept the terms of use (section 2, truck parking).
Tulpenweg 20Graben · 1 charge point · up to 11 kW · no status data, per charging point register · 550 m south-east · Map · Google Maps
LEW Natur GmbH, Lechfelder Straße 25Graben · 2 charge points · up to 22 kW · status from 30 Oct, 16:37 — possibly out of date · 600 m east · Map · Google Maps
LEW Natur GmbH, Bahnhofstraße 30Lagerlechfeld · 2 charge points · up to 22 kW · status from 30 Oct, 17:04 — possibly out of date · 1.7 km south-east · Map · Google Maps
Only a few operators publish live occupancy; “no status data” means unknown, not free.
Ask your AI assistant:Where is the nearest charging station in Graben?
Ask your AI assistant:Tell me here in this chat as soon as a charge point turns free at the nearest charging station in Graben.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →