Kreis Bad Dürkheim, K2 between Dackenheim and Freinsheim Construction site, closed until 31/12/2026, 18:00 Full lock of K2 Freinsheim - Dackenheim due to bridge damage at the … · Original (German) →Full text
Kreis Bad Dürkheim, K2 between Dackenheim and Freinsheim Construction site, closed until 31/12/2026, 18:00 Full lock of K2 Freinsheim - Dackenheim due to bridge damage at the railway bridge. The lock will last for the specified duration.