Beta ViaFrei is in beta: answers and coverage can change, and the AI can make mistakes. Please check important details with the source named. What this means
Eckenroth
Everything ViaFrei knows about Eckenroth right now – from open data, with the source of every figure.
The streets come from our street database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Red for a full closure of the carriageway, a wrong-way driver, objects, people or animals on the road, an accident with a closure, a weather warning of level 3–4 or a jam with a delay of 30 minutes or more.
Yellow for a shorter jam, roadworks narrowing the road, another traffic warning, a weather warning of level 1–2, slippery roads in the road-weather forecast, a closed entry or exit — or when a source is missing or out of date.
Green only when none of this is reported nearby and both the traffic messages and the German Weather Service's warnings for this place can be read. Green is no guarantee of a clear road.
Read: every traffic message for this place within 5.0 km (Autobahn GmbH, police, Land and city) and the German Weather Service (warnings, road weather).
No colour from: parking, charging, fuel, buses and trains.
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
0 closures · 0 jams and accidents · 10 roadworks within 15 km
5.4 kmdirection unknownMon, 9 Dec 2024, 05:00 – Sun, 1 Apr 2029, 00:00 · in force now, ends in 882 daysRestriction unknownRoadworksMap · Google MapsAutomatic translation: A61 Koblenz towards Ludwigshafen between Rheinböllen and services Hunsrück West: bridge works, lanes closed: 1, narrowed to two lanes, traffic is routed onto the opposite … · Original (German) →Full text
A61 Koblenz towards Ludwigshafen between Rheinböllen and services Hunsrück West: bridge works, lanes closed: 1, narrowed to two lanes, traffic is routed onto the opposite carriageway, until 01/04/2029, 00:00
9.4 kmdirection unknownMon, 9 Dec 2024, 05:00 – Sun, 1 Apr 2029, 00:00 · in force now, ends in 882 daysRestriction unknownRoadworksMap · Google MapsAutomatic translation: A61 Ludwigshafen towards Koblenz between services Hunsrück Ost and Rheinböllen: bridge works, narrowed to two lanes, until 01/04/2029, 00:00 · Original (German) →
9.5 kmdirection unknownMon 3 Aug, 00:00 – Mon 7 Dec, 23:59 · in force now, ends in 37 daysRestriction unknownRoadworksMap · Google MapsAutomatic translation: Assmannshausen, Niederwaldstraße between Höllenbergstraße and Bohrenweg: roadworks, closed in both directions, a diversion is in place, until 07/12/2026 · Original (German) →
Rhineland-Palatinate: we do not hold federal or state roads – for them this is no all-clear
Nothing right here — the nearest within 15 km
The publishers' own texts are on the German page.
Translated automatically by ViaFrei; the German original is binding.
Autobahn GmbH's motorway reports are on the “Motorways” card.
For lorries
Lorry restrictions within 5 km (ivm Frankfurt RheinMain):
Entries in range, none with a street given: 25. This is not an all-clear: the signs on site apply.
Long-lorry positive network nearby: A61 2.2 km, B48 8.3 km, L242 10 km, L400 10 km, B50 11 km, A60 11 km
What binds is the Annex to § 2(1) of the LKWÜberlStVAusnV. The publisher states that the data make no claim to be complete or correct, have no legal or official meaning, and are not suitable for navigation or similar purposes.
Ask your AI assistant:Are there closures or jams near Eckenroth?
Ask your AI assistant:Tell me here in this chat when the traffic situation near Eckenroth changes.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →
A61 · between Sinzig interchange (31) and Bad Neuenahr interchange (30) · near Sinzig · Rhineland-Palatinate (placed by ViaFrei)towards Nettetalplanned 3 Nov, 19:00–4 Nov, 05:00 · further time windows: 2Hard shoulder closed · Speed limit 80 km/hChanged traffic layout: setting up and removing the roadworks barriersMap · Google Maps
Short-duration roadworks are planned at short notice and often changed; they replace neither a permit for oversize and heavy transport nor the route check before setting off (our translation of the publisher's note).
The publisher's wording is on the German page.
Nearby
A61Hunsrück-West - Rheinböllen · 5.4 kmtowards Koblenzfrom Mon, 9 Dec 2024, 05:00, end not reported · in force nowRestriction unknownRoadworksMap · Google Mapsbetween 1.1 km after Hunsrück-West and 1.3 km before AS Rheinböllen · 4.67 km long · 6.25 m wide to pass · 9 Dec 2024 – 1 Apr 2029
A61Rheinböllen - Hunsrück-West · 9.4 kmtowards Ludwigshafenfrom Mon, 9 Dec 2024, 05:00, end not reported · in force nowRestriction unknownRoadworksMap · Google Mapsbetween 1.3 km after AS Rheinböllen and 1.1 km before Hunsrück-West · 4.67 km long · 6.25 m wide to pass · 9 Dec 2024 – 1 Apr 2029
Lorry parking · Euro Rastpark Waldlaubersheim · 210 spaces · 140 lorry spaces · 3.3 km east · Map · Google MapsFacilities: not reportedNearby per OpenStreetMap (straight line, access not checked): snack bar 90 mNearby (straight line, access not checked): EV charger 300 kW, 100 m (DE*EWE)
Lorry parking · Hunsrück West · 165 spaces · 88 lorry spaces · 4.4 km north · Map · Google MapsFacilities per the publisher: toilet · shower · picnic area · playgroundNearby per OpenStreetMap (straight line, access not checked): snack bar 140 m · café 150 m · restaurant 150 mNearby (straight line, access not checked): EV charger 300 kW, 20 m (ENBW)
Lorry parking · Hunsrück Ost · 119 spaces · 59 lorry spaces · 4.5 km north · Map · Google MapsFacilities per the publisher: toilet · restaurant · fuel station · drinking water · picnic areaNearby per OpenStreetMap (straight line, access not checked): café 60 m · snack bar 170 mNearby (straight line, access not checked): EV charger 160 kW, 100 m
Live occupancy only where the operator publishes it — ask your assistant.
Ask your AI assistant:Where is a lorry park near Eckenroth?
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Truck-parking occupancy (Toll Collect, SID)
By clicking you accept the terms of use (section 2, truck parking).
Stromberg - Pappelweg 6Pappelweg 6, Stromberg · 4 charge points · up to 11 kW · no status data · 850 m north-west · Map · Google Maps
DUOBLOQ am Buchenring 6 | 1/4Am Buchenring 6, Stromberg · 2 charge points · up to 22 kW · status from 29 Oct, 11:13 — possibly out of date, 1 without status · 1.2 km north-west · Map · Google Maps
DUOBLOQ am Buchenring 6 | 3/4Am Buchenring 6, Stromberg · 2 charge points · up to 22 kW · status from 27 Oct, 20:20 — possibly out of date, 1 without status · 1.2 km north-west · Map · Google Maps
Only a few operators publish live occupancy; “no status data” means unknown, not free.
Ask your AI assistant:Where is the nearest charging station in Eckenroth?
Ask your AI assistant:Tell me here in this chat as soon as a charge point turns free at the nearest charging station in Eckenroth.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
8 of 8 topics shown
Ready in one minute
ViaFrei lives inside the assistant you already have. Three steps, once:
In Claude or ChatGPT: settings → “Connectors”.
Add ViaFrei with the address below.
Ask: “Is the A8 towards Munich clear right now?”
Draft — these steps are not yet verified in every assistant.
MCP endpoint (Streamable HTTP)
https://mcp.viafrei.de/mcp
Show the steps for your client
For older clients (HTTP + SSE)
https://mcp.viafrei.de/sse
Claude (desktop and claude.ai)
Settings → Connectors → “Add custom connector”.
Paste the endpoint above and save.
Ask: “Is the A8 towards Munich clear?”
Draft — these steps have not been verified on the client yet.