Beta ViaFrei is in beta: answers and coverage can change, and the AI can make mistakes. Please check important details with the source named. What this means
Dörth
Everything ViaFrei knows about Dörth right now – from open data, with the source of every figure.
ViaFrei creates no account and no profile and does not store your place. Your browser remembers a place on this device only when you choose it in the place bar – a place or an address, “Use my location” or “All of Germany” – together with your recent places; while this page uses a remembered place, a line under the place bar says so, and “Forget place” deletes it at once. The page asks for your location only when you choose “Use my location”; if you have already allowed it permanently in your browser, this page reads it without asking and stores nothing. Your location is rounded on your device to an area of about 500 m, and our server derives the street or place name for it from that area; it keeps that name in memory for at most an hour per area, without any link to you, and does not store it. It keeps the name of a station, place or address chosen here in memory for at most an hour in the same way. Your IP address is used only in memory, for the approximate location, and is not stored for it. More in the privacy policy
Yellow — Roadworks narrowing the road · B327 Hermeskeil Richtung Koblenz zwischen Abzweig nach Emmelshausen und Emmelshausen · 1.2 km
Within 5.0 km of Dörth.
2 × Roadworks narrowing the road · Verkehrsmeldungen der Polizei: Landesbetrieb Straßenbau NRW (VIZ.NRW) via Mobilithek, Datenlizenz Deutschland – Zero – Version 2.0
Schematic map – not for navigation.Streets (OpenStreetMap)Buses and trainsChargingLorry parking and rest areas
The streets come from our street database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Red for a full closure of the carriageway, a wrong-way driver, objects, people or animals on the road, an accident with a closure, a weather warning of level 3–4 or a jam with a delay of 30 minutes or more.
Yellow for a shorter jam, roadworks narrowing the road, another traffic warning, a weather warning of level 1–2, slippery roads in the road-weather forecast, a closed entry or exit — or when a source is missing or out of date.
Green only when none of this is reported nearby and both the traffic messages and the German Weather Service's warnings for this place can be read. Green is no guarantee of a clear road.
Read: every traffic message for this place within 5.0 km (Autobahn GmbH, police, Land and city) and the German Weather Service (warnings, road weather).
No colour from: parking, charging, fuel, buses and trains.
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
0 closures · 0 jams and accidents · 2 roadworks within 5.0 km
1.2 kmdirection unknownMon 26 Oct, 07:30 – Sat 28 Nov, 18:00 · in force now, ends in 26 daysRestriction unknownRoadworksMap · Google MapsAutomatic translation: B327 Hermeskeil Richtung Koblenz between Abzweig nach Emmelshausen and Emmelshausen Construction site, closed, from 26/10/2026, 07:30 to 28/11/2026, 18:00 Full lock of … · Original (German) →Full text
B327 Hermeskeil Richtung Koblenz between Abzweig nach Emmelshausen and Emmelshausen Construction site, closed, from 26/10/2026, 07:30 to 28/11/2026, 18:00 Full lock of Bundesstraße B 327 at the level of Sauerbrunnen towards industrial area Emmelshausen. The diversion takes place from Emmelshausen via the motorway A 61 to exit Pfalzfeld in the direction of Bickenbach via Reidenthal to Sauerbrunnen.
2.0 kmdirection unknownMon 26 Oct, 07:30 – Sat 28 Nov, 18:00 · in force now, ends in 26 daysRestriction unknownRoadworksMap · Google MapsAutomatic translation: B327 Koblenz Richtung Hermeskeil between Emmelshausen and Abzweig nach Emmelshausen Construction site, closed, from 26/10/2026, 07:30 to 28/11/2026, 18:00 Full lock of … · Original (German) →Full text
B327 Koblenz Richtung Hermeskeil between Emmelshausen and Abzweig nach Emmelshausen Construction site, closed, from 26/10/2026, 07:30 to 28/11/2026, 18:00 Full lock of Bundesstraße B 327 at the level of Sauerbrunnen towards industrial area Emmelshausen. The diversion takes place from Emmelshausen via the motorway A 61 to exit Pfalzfeld in the direction of Bickenbach via Reidenthal to Sauerbrunnen.
Rhineland-Palatinate: we do not hold federal or state roads – for them this is no all-clear
The publishers' own texts are on the German page.
Translated automatically by ViaFrei; the German original is binding. Opus-MT, Helsinki-NLP (Tiedemann, Thottingal) (CC BY 4.0)
For lorries
Long-lorry positive network nearby: A61 500 m, B42 16 km, B50 18 km, B327 20 km, B9 20 km, L125 22 km
What binds is the Annex to § 2(1) of the LKWÜberlStVAusnV. The publisher states that the data make no claim to be complete or correct, have no legal or official meaning, and are not suitable for navigation or similar purposes.
Ask your AI assistant:Are there closures or jams near Dörth?
Ask your AI assistant:Tell me here in this chat when the traffic situation near Dörth changes.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →
A61 · between Sinzig interchange (31) and Bad Neuenahr interchange (30) · near Sinzig · Rhineland-Palatinate (placed by ViaFrei)towards Nettetalplanned 3 Nov, 19:00–4 Nov, 05:00 · further time windows: 2Hard shoulder closed · Speed limit 80 km/hChanged traffic layout: setting up and removing the roadworks barriersMap · Google Maps
Short-duration roadworks are planned at short notice and often changed; they replace neither a permit for oversize and heavy transport nor the route check before setting off (our translation of the publisher's note).
Lorry parking · Erzkaul · 58 spaces · 12 lorry spaces · 1.6 km south · Map · Google MapsFacilities per the publisher: toilet · picnic area
Lorry parking · Marienau · 59 spaces · 12 lorry spaces · 1.8 km south · Map · Google MapsFacilities per the publisher: toilet · picnic area
Lorry parking · Shell Autohof Pfalzfeld · 91 spaces · 47 lorry spaces · 3.5 km south · Map · Google MapsFacilities: not reportedNearby per OpenStreetMap (straight line, access not checked): café 210 m · snack bar 210 mNearby (straight line, access not checked): EV charger 225 kW, 210 m (DE*EWE)
Live occupancy only where the operator publishes it — ask your assistant.
Ask your AI assistant:Where is a lorry park near Dörth?
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Truck-parking occupancy (Toll Collect, SID)
By clicking you accept the terms of use (section 2, truck parking).
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
8 of 8 topics shown
Ready in one minute
ViaFrei lives inside the assistant you already have. Three steps, once:
In Claude or ChatGPT: settings → “Connectors”.
Add ViaFrei with the address below.
Ask: “Is the A8 towards Munich clear right now?”
Draft — these steps are not yet verified in every assistant.
MCP endpoint (Streamable HTTP)
https://mcp.viafrei.de/mcp
Show the steps for your client
For older clients (HTTP + SSE)
https://mcp.viafrei.de/sse
Claude (desktop and claude.ai)
Settings → Connectors → “Add custom connector”.
Paste the endpoint above and save.
Ask: “Is the A8 towards Munich clear?”
Draft — these steps have not been verified on the client yet.