Beta ViaFrei is in beta: answers and coverage can change, and the AI can make mistakes. Please check important details with the source named. What this means
Baunach
Everything ViaFrei knows about Baunach right now – from open data, with the source of every figure.
The streets come from our street database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Warning marks: Datenbasis: Deutscher Wetterdienst, zusammengefasst
How the traffic light is set
Red for a full closure of the carriageway, a wrong-way driver, objects, people or animals on the road, an accident with a closure, a weather warning of level 3–4 or a jam with a delay of 30 minutes or more.
Yellow for a shorter jam, roadworks narrowing the road, another traffic warning, a weather warning of level 1–2, slippery roads in the road-weather forecast, a closed entry or exit — or when a source is missing or out of date.
Green only when none of this is reported nearby and both the traffic messages and the German Weather Service's warnings for this place can be read. Green is no guarantee of a clear road.
Read: every traffic message for this place within 5.0 km (Autobahn GmbH, police, Land and city) and the German Weather Service (warnings, road weather).
No colour from: parking, charging, fuel, buses and trains.
Official WARNING of FOG · Level 1 · —until 10:00What the DWD says
There is a risk of fog (level 1 of 1).
Visibility: < 150 m
Hazard(s) to expect: severely reduced visibility possible.
Recommendations for what to do:
Adapt your driving behaviour to sudden reduced visibility (fog banks).
DWD road-surface forecast for the nearest road-weather stations — a model forecast (run 00:00), not a measurement and not an official warning
The next hours at Bamberg
02:00 air 3.5 °C · road surface 5.2 °C, dry
03:00 air 3.3 °C · road surface 4.7 °C, dry
04:00 air 3.3 °C · road surface 4.1 °C, dry
05:00 air 3.3 °C · road surface 4.4 °C, dry
06:00 air 3.2 °C · road surface 4.0 °C, dry
07:00 air 3.3 °C · road surface 3.8 °C, dry
No slippery class forecast until 30 Oct, 01:51.
Each line is for the station's own location, not for the whole road.
Ask your AI assistant:Is there a severe-weather warning for Baunach right now?
Ask your AI assistant:Tell me here in this chat as soon as a severe-weather warning comes for Baunach.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
0 closures · 0 jams and accidents · 1 roadworks within 5.0 km
B279 3.5 kmdirection unknownThu 15 Oct, 15:31 – Sun, 31 Oct 2027, 15:30 · in force now, ends in 368 daysRestriction unknownRestrictionMap · Google MapsAutomatic translation: B279 Reckendorf, Hauptstraße closed between Geracher Straße and Ortsausgang, road renewal, from 15/10/2026, 15:31 to 31/10/2027, 15:30 A diversion is signposted. · Original (German) →
Bavaria: we do not hold state roads – for them this is no all-clear
The publishers' own texts are on the German page.
Translated automatically by ViaFrei; the German original is binding. Opus-MT, Helsinki-NLP (Tiedemann, Thottingal) (CC BY 4.0)
Autobahn GmbH's motorway reports are on the “Motorways” card.
For lorries
Long-lorry positive network nearby: A73 2.5 km, A70 7.4 km, S2281 7.7 km, B26 7.7 km, B22 12 km, B505 15 km
What binds is the Annex to § 2(1) of the LKWÜberlStVAusnV. The publisher states that the data make no claim to be complete or correct, have no legal or official meaning, and are not suitable for navigation or similar purposes.
Ask your AI assistant:Are there closures or jams near Baunach?
Ask your AI assistant:Tell me here in this chat when the traffic situation near Baunach changes.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →
A73 · between Coburg junction (7) and Schleusingen junction (4) · near Rödental · Bavaria (placed by ViaFrei)towards Suhlplanned 07:00–18:00 · further time windows: 61 of 2 lanes closed · Hard shoulder closed · Speed limit 80 km/hMaintenance works: verge mowing and tree careMap · Google Maps
A73 · between Eisfeld-Süd junction (6) and Eisfeld-Nord junction (5) · Thuringia (placed by ViaFrei)towards Suhlplanned 2 Nov, 07:00–2 Nov, 17:00 · further time windows: 2Hard shoulder closed · Speed limit 80 km/hMaintenance works: sign and gantry worksMap · Google Maps
as of 01:47
The publishers' own texts are on the German page.
Short-duration roadworks are planned at short notice and often changed; they replace neither a permit for oversize and heavy transport nor the route check before setting off (our translation of the publisher's note).
The publisher's wording is on the German page.
Nearby
A70Bamberg-Hafen - Bamberg · 7.8 kmboth directionsfrom Sat, 23 Aug 2025, 00:00, end not reported · in force nowRestriction unknownRoadworksMap · Google Mapsbetween 0.7 km after AS Bamberg-Hafen and 0.2 km before AS Bamberg · 2 km long · max. 80 km/h · 5.5 m wide to pass · 23 Aug 2025 – 1 Jan 2028
Lorry parking · OMV Tankstelle - AS Breitengüßbach-Mitte · 50 spaces · 38 lorry spaces · 2.5 km south-east · Map · Google MapsFacilities: not reportedNearby per OpenStreetMap (straight line, access not checked): shop 50 m · snack bar 90 mNearby (straight line, access not checked): EV charger 150 kW, 80 m (ENBW)
Live occupancy only where the operator publishes it — ask your assistant.
Ask your AI assistant:Where is a lorry park near Baunach?
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Truck-parking occupancy (Toll Collect, SID)
By clicking you accept the terms of use (section 2, truck parking).
50five-S DE 07501204Überkumstraße 36, Baunach · 2 charge points · up to 4 kW · no status data · 50 m south-east · Map · Google Maps
LiB_Baunach_Stufenburgstraße SB2Stufenburgstraße 22, Baunach · 1 charge point · up to 7 kW · no status data · 250 m west · Map · Google Maps
bayernwerk e-mobil Ladestation Stadt BaunachBahnhofstraße 14, Baunach · 2 charge points · up to 22 kW · status from 24 Oct, 10:35 — possibly out of date, 1 without status · 300 m east · Map · Google Maps
Only a few operators publish live occupancy; “no status data” means unknown, not free.
Ask your AI assistant:Where is the nearest charging station in Baunach?
Ask your AI assistant:Tell me here in this chat as soon as a charge point turns free at the nearest charging station in Baunach.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →