B533 Freyung Richtung Hengersberg closed between Abzweig nach Hötzelsberg and Auerbach, construction site, from 02/11/2026, 07:00 to 23/12/2026, 15:00 A detour is signposted. · Original (German) →Severe weather
AttentionAuerbach1 official warning
- Official WARNING of FROST · Level 1 · —until 22 Nov, 09:00
What the DWD says
There is a risk of frost (level 1 of 2). Minimum temperature: > -4 °C
Hazard(s) to expect: possible frost damage. Recommendations for what to do: If necessary, take precautions against frost.
DWD road-surface forecast for the nearest road-weather stations — a model forecast (run 20:00), not a measurement and not an official warning
The next hours at Hainstetten-Schaufling
- 22:00 air 0.7 °C · road surface 1.4 °C, dry
- 23:00 air 0.4 °C · road surface 1.1 °C, dry
- 00:00 air 0.3 °C · road surface 0.7 °C, dry
- 01:00 air 0 °C · road surface 0.4 °C, dry
- 02:00 air −0.4 °C · road surface 0.0 °C, dry
- 03:00 air −0.6 °C · road surface −0.3 °C, dry
No slippery class forecast until 22 Nov, 21:23.
Each line is for the station's own location, not for the whole road.
Ask your AI assistant: Is there a severe-weather warning for Auerbach right now?
Ask your AI assistant: Tell me here in this chat as soon as a severe-weather warning comes for Auerbach.
Your AI assistant gives this answer only when ViaFrei is connected. https://mcp.viafrei.de How to connect ViaFrei