A485 motorway now
The A485 runs from Langgöns junction to Gießener Nordkreuz interchange, about 18 km long (schematic), through Hesse, with 12 junctions and interchanges (2 of them interchanges). Reported on the A485 now: 0 closures, 0 jams, 3 roadworks (as of 08:09).
Reported now
0 closures · 0 jams · 3 roadworks · as of 08:09
By direction
- Langgöns → Gießener Nordkreuz: 0 closures · 0 jams · 1 roadworks
- no direction given: 0 closures · 0 jams · 2 roadworks
Map
- Junction or interchange
- Roadworks
- Charging station
- Road-weather station
Schematic: the line joins the points of the Location Code List in their order – not to scale, not a navigation map. Where the list has a gap, the line breaks too.
Map sources
Kartengrundlage: © BKG (2026) dl-de/by-2-0, Datenquellen: https://sgx.geodatenzentrum.de/web_public/gdz/datenquellen/datenquellen_vg_nuts.pdf (Daten verändert)
TMC Location Code List (LCL 22.0): Bundesanstalt für Straßenwesen (BASt), CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/), bearbeitet · licence text
Ladepunkte: vaylens GmbH via Mobilithek, CC0 1.0
Ladepunkte: EnBW AG via Mobilithek, CC BY 4.0, bearbeitet · licence text
Ladepunkte: Wirelane GmbH via Mobilithek, CC0 1.0
Ladesäulenregister: Bundesnetzagentur.de, CC BY 4.0, bearbeitet · licence text
Ladepunkte: chargecloud GmbH via Mobilithek, CC0 1.0
Ladepunkte: Tesla Germany GmbH via Mobilithek, CC0 1.0
Ladepunkte: Eco-Movement via Mobilithek, CC BY 4.0, bearbeitet · licence text
Quelle: Deutscher Wetterdienst. Datenquelle: BMVBS und Straßenbauverwaltungen der Länder · licence text Die Daten der Glättemeldeanlagen stellen ungeprüfte Punktmessungen dar und spiegeln nicht die Verhältnisse auf einem Straßenabschnitt wider. Es besteht kein Anspruch auf regelmäßige und vollständige Datenlieferungen.
Closures, jams and roadworks on the A485
Closures
none
Jams
none
Roadworks
Planned full closures, next 7 days
Autobahn GmbH announces no full closure on this motorway for the next 7 days (as of 08:09).
Some stretches are described in German only; the German page shows them.
Route
From Langgöns junction to Gießener Nordkreuz interchange · 12 junctions and interchanges
about 18 km along the points of the Location Code List (schematic)
Through Hesse (state by the nearest municipality of each junction)
Junction strip
The junctions in their order, with what is reported at each.
- 10 Langgöns junction charging
- 9 Gießener Südkreuz interchange meets A45
- 8 Linden junction charging
- 7 Bergwerkswald junction 1 roadworks
- 6 Gießen-Schiffenberger Tal junction parking · charging
- 5 Gießen-Licher Straße junction parking · charging · road weather
- 4 Gießen-Grünberger Straße junction parking · charging
- 3 Gießen-Ursulum junction 1 roadworks · charging
- 2 Gießen-Wieseck junction charging
- 1 Gießener Nordkreuz/B3 junction
- 1 Gießen-Marburger Straße junction
- 1 Gießener Nordkreuz interchange meets A480
Places on the A485
Parking and rest
More car parks mapped by OpenStreetMap
- Aldi · at Gießen-Schiffenberger Tal junction · 800 m
- Am Forstgarten · at Gießen-Schiffenberger Tal junction · 900 m
- Philosophikum II · at Gießen-Schiffenberger Tal junction · 550 m
- Parkplatz Schiffenberg · at Gießen-Licher Straße junction · 750 m
- Penny · at Gießen-Licher Straße junction · 750 m
- REWE · at Gießen-Grünberger Straße junction · 950 m
- Service Reisen · at Gießen-Grünberger Straße junction · 50 m
OSM-Standortdaten: © OpenStreetMap-Mitwirkende, ODbL 1.0 · licence text
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Charging
Charging stations within 600 m of the junctions and service areas. Charging stations read 08:09; each point's status with its own time.
- ALDI SE & Co. KG Butzbach · 3 charge points · up to 80 kW · status from 07:00 — possibly out of date · at Langgöns junction
- ENBW · 9 charge points · up to 300 kW · status from 20 Oct, 01:00 — possibly out of date · at Langgöns junction
- ENBW · 8 charge points · up to 300 kW · status from 20 Oct, 01:00 — possibly out of date · at Linden junction
- Linden - Gottlieb-Daimler-Straße 8 · 4 charge points · up to 11 kW · no status data · at Linden junction
- Volksbank Mittelhessen eG · 4 charge points · up to 11 kW · no status data · at Gießen-Schiffenberger Tal junction
- Volksbank Mittelhessen eG · 4 charge points · up to 11 kW · no status data · at Gießen-Schiffenberger Tal junction
- Volksbank Mittelhessen eG · 4 charge points · up to 11 kW · no status data · at Gießen-Schiffenberger Tal junction
- OVAG Gießen - Riversplatz 2 · 4 charge points · up to 22 kW · 4 of 4 free (as of 08:08) · at Gießen-Licher Straße junction
- Giessen, Germany · 8 charge points · up to 250 kW · status from 20 Oct, 05:56 — possibly out of date, 5 without status · at Gießen-Grünberger Straße junction
- Lidl Filiale Gießen · 3 charge points · up to 50 kW · status from 20 Oct, 16:31 — possibly out of date, 1 without status · at Gießen-Grünberger Straße junction
- Autohaus Michel GmbH & Co KG · 3 charge points · up to 50 kW · no status data · at Gießen-Ursulum junction
- Autohaus Michel GmbH & Co KG · 3 charge points · up to 50 kW · no status data · at Gießen-Ursulum junction
- e-mobilio Autohaus Michel GmbH & Co. KG Zeppelinstr · 6 charge points · up to 160 kW · status from 20 Oct, 12:42 — possibly out of date, 2 without status · at Gießen-Ursulum junction
- TMO LP1/2 EDEKA · 4 charge points · up to 225 kW · status from 20 Oct, 21:36 — possibly out of date · at Gießen-Wieseck junction
Only a few operators publish live occupancy; “no status data” means unknown, not free.
Fast charging from 150 kW and power classes
Longest stretch without a charging site of 150 kW or more: from Linden junction to Gießen-Grünberger Straße junction, about 7.5 km (schematic).
By power: under 50 kW: 5 · 50 to 149 kW: 4 · 150 kW and up: 5.
Our count of the sites above (within the distance named from a junction or service area) – whether one is free, the list says.
Ladesäulenregister: Bundesnetzagentur.de, CC BY 4.0, bearbeitet · licence text
Ladepunkte: chargecloud GmbH via Mobilithek, CC0 1.0
Ladepunkte: Eco-Movement via Mobilithek, CC BY 4.0, bearbeitet · licence text
Ladepunkt-Verfügbarkeit: Eco-Movement via Mobilithek, CC BY 4.0, bearbeitet · licence text
Ladepunkt-Verfügbarkeit: EnBW AG via Mobilithek, CC BY 4.0, bearbeitet · licence text
Ladepunkte: EnBW AG via Mobilithek, CC BY 4.0, bearbeitet · licence text
Ladepunkt-Verfügbarkeit: Tesla Germany GmbH via Mobilithek, CC0 1.0
Ladepunkte: Tesla Germany GmbH via Mobilithek, CC0 1.0
Ladepunkt-Verfügbarkeit: vaylens GmbH via Mobilithek, CC0 1.0
Ladepunkte: vaylens GmbH via Mobilithek, CC0 1.0
Ladepunkte: Wirelane GmbH via Mobilithek, CC0 1.0
Ladepunkte und Verfügbarkeit: chargecloud (CC0 1.0) via MobiData BW (NVBW), Datenlizenz Deutschland – Namensnennung – Version 2.0 (www.govdata.de/dl-de/by-2-0), Daten geändert · licence text
Weather along the motorway
Official warnings of the Deutscher Wetterdienst
No official warning along the motorway.
Road-surface forecast
DWD road-surface forecast for the nearest road-weather stations — a model forecast (run 07:00), not a measurement and not an official warning
- AS Licher Strasse · at Gießen-Licher Straße junction · 09:00: damp, road surface 9.7 °C
Each line is for the station's own location, not for the whole road.
Quelle: Deutscher Wetterdienst. Datenquelle: BMVBS und Straßenbauverwaltungen der Länder · licence text Die Daten der Glättemeldeanlagen stellen ungeprüfte Punktmessungen dar und spiegeln nicht die Verhältnisse auf einem Straßenabschnitt wider. Es besteht kein Anspruch auf regelmäßige und vollständige Datenlieferungen.
Fuel prices
We load the prices of the filling stations along the motorway only when you ask for them. Loading the prices needs JavaScript on this page.
Loading prices …
The prices cannot be fetched right now.
On every motorway
Lorry driving ban
On Sundays and public holidays, lorries over 7.5 t and lorries with trailers may not drive between 00:00 and 22:00. (§ 30 Abs. 3 StVO)
Next ban day: Sunday 25 October.
The motorway's states by the nearest municipality of each junction. Holidays per § 30 Abs. 4 StVO, reviewed 8 October 2026 · Informational, not legal advice.
- On the Autobahn there is no general speed limit where no sign says otherwise; the advisory speed is 130 km/h. Drive faster and you can share liability in a crash. (Autobahn-Richtgeschwindigkeits-V)
- Rescue lane: as soon as traffic slows on a motorway or rural road with at least two lanes per direction, keep a lane free between the leftmost lane and the one beside it — immediately, not once the blue lights arrive. (§ 11 Abs. 2 StVO)
- 112 reaches ambulance and fire service (Europe-wide), 110 the police — free from any network, credit or not. (Notrufverordnung (NotrufV))
Reviewed 19 September 2026 · Informational, not legal advice.