Beta ViaFrei is in beta: answers and coverage can change, and the AI can make mistakes. Please check important details with the source named. What this means
Reckweilerhof (Wolfstein)
Reckweilerhof (Wolfstein), Rhineland-Palatinate: the next departures live with their platform, which lifts and escalators work now, platforms with step-free access, facilities and surroundings – from open data, with source and date.
Traffic light for Reckweilerhof, Oberweiler-Tiefenbach
Yellow — Roadworks narrowing the road · B270 Richtung Idar-Oberstein zwischen Sulzhof und Lauterecken · 4.4 km
Within 5.0 km of Reckweilerhof, Oberweiler-Tiefenbach. No motorway junction within 5.0 km: the traffic light judges the other roads.
2 × Roadworks narrowing the road · Verkehrsmeldungen der Polizei: Landesbetrieb Straßenbau NRW (VIZ.NRW) via Mobilithek, Datenlizenz Deutschland – Zero – Version 2.0
Schematic map – not for navigation.Streets (OpenStreetMap)Buses and trains
The streets come from our street database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Red for a full closure of the carriageway, a wrong-way driver, objects, people or animals on the road, an accident with a closure, a weather warning of level 3–4 or a jam with a delay of 30 minutes or more.
Yellow for a shorter jam, roadworks narrowing the road, another traffic warning, a weather warning of level 1–2, slippery roads in the road-weather forecast, a closed entry or exit — or when a source is missing or out of date.
Green only when none of this is reported nearby and both the traffic messages and the German Weather Service's warnings for this place can be read. Green is no guarantee of a clear road.
Read: every traffic message for this place within 5.0 km (Autobahn GmbH, police, Land and city) and the German Weather Service (warnings, road weather).
No colour from: parking, charging, fuel, buses and trains.
Tiefenbach/Kus, Pfarrwiese🚌Bus 350 m · 5 min walk · Map · Google Maps
2974 to Wolfstein, Hotel Ney · in 15 min(05:59) · timetable
274 to Kusel, Gymnasium · in 47 min(06:31) · timetable
Wolfstein, Bahnhof🚆Train 2.3 km · 29 min walk · Map · Google MapsNothing leaves here in the next 60 minutes, by the timetable.Platforms per DB: 1 of 1 step-free
We cannot give the share of late trips right now.
More stops (3)
Heinzenhausen, Bahnhof🚆Train 2.3 km · 29 min walk · Map · Google Maps
Lohnweiler, Bahnhof🚆Train 3.6 km · 45 min walk · Map · Google Maps
Roßbach, Bahnhof🚆Train 3.7 km · 47 min walk · Map · Google Maps
Ask your AI assistant:What leaves next in Oberweiler-Tiefenbach, and is it on time?
Ask your AI assistant:Tell me here in this chat if the next departures in Oberweiler-Tiefenbach run late.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
🚧 Roads
Reckweilerhof, Oberweiler-Tiefenbach · 5.0 kmlive · (sources: Landesbetrieb Straßenbau NRW (VIZ.NRW) 05:23, Die Autobahn GmbH des Bundes (Mobilithek) 05:42, Landesmeldestelle für den Verkehrswarndienst Baden-Württemberg (Innenministerium Baden-Württemberg) 05:24, Landesmeldestelle Polizei Schleswig-Holstein 05:34, Senatsverwaltung für Mobilität 05:38, Landesmeldestelle Berlin (LMST BE) 05:31, Digitale Plattform Stadtverkehr Berlin / Baustellen 05:38, Stadt Köln 05:38, Landeshauptstadt Hannover – Fachbereich Tiefbau 05:06, Stadt Rüsselsheim am Main 05:38, Stadt Kassel 05:39, Stadt Leipzig 05:06 · not answering: 2)stale · Verkehrsmanagementzentrale Bremen · ↻
0 closures · 0 jams and accidents · 2 roadworks within 5.0 km
4.4 kmdirection unknownFri 7 Aug, 08:30 – Thu 31 Dec, 16:30 · in force now, ends in 62 daysRestriction unknownRoadworksMap · Google MapsAutomatic translation: B270 Richtung Idar-Oberstein between Sulzhof and Lauterecken Construction site, closed until 31/12/2026, 16:30 Full lock of K 39 in OD Lauterecken, in section between … · Original (German) →Full text
B270 Richtung Idar-Oberstein between Sulzhof and Lauterecken Construction site, closed until 31/12/2026, 16:30 Full lock of K 39 in OD Lauterecken, in section between Cronenbergerstraße and exit Lauterecken. The detour from B 270 to Cronenberg runs through L 383 Heinzenhausen, Hohenöllen and further on K 39 Sulzhof.
4.4 kmdirection unknownFri 7 Aug, 08:30 – Thu 31 Dec, 16:30 · in force now, ends in 62 daysRestriction unknownRoadworksMap · Google MapsAutomatic translation: B270 Idar-Oberstein Richtung Kaiserslautern between Lauterecken and Sulzhof Construction site, closed until 31/12/2026, 16:30 Full lock of K 39 in OD Lauterecken, in section … · Original (German) →Full text
B270 Idar-Oberstein Richtung Kaiserslautern between Lauterecken and Sulzhof Construction site, closed until 31/12/2026, 16:30 Full lock of K 39 in OD Lauterecken, in section between Cronenbergerstraße and exit Lauterecken. The detour from B 270 to Cronenberg runs through L 383 Heinzenhausen, Hohenöllen and further on K 39 Sulzhof.
Rhineland-Palatinate: we do not hold federal or state roads – for them this is no all-clear
The publishers' own texts are on the German page.
Translated automatically by ViaFrei; the German original is binding. Opus-MT, Helsinki-NLP (Tiedemann, Thottingal) (CC BY 4.0)
For lorries
Long-lorry positive network nearby: L367 15 km, B270 16 km, A6 18 km, L369 18 km, A63 19 km, A62 19 km
What binds is the Annex to § 2(1) of the LKWÜberlStVAusnV. The publisher states that the data make no claim to be complete or correct, have no legal or official meaning, and are not suitable for navigation or similar purposes.
Ask your AI assistant:Are there closures or jams near Oberweiler-Tiefenbach?
Ask your AI assistant:Tell me here in this chat when the traffic situation near Oberweiler-Tiefenbach changes.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →