Beta ViaFrei is in beta: answers and coverage can change, and the AI can make mistakes. Please check important details with the source named. What this means
Offenburg
Offenburg, Baden-Württemberg: the next departures live with their platform, which lifts and escalators work now, platforms with step-free access, facilities and surroundings – from open data, with source and date.
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Charging
live · (sources: EnBW AG 01:10, Eco-Movement 01:13, Tesla Germany GmbH 00:58, Volkswagen Group Charging GmbH 00:58, e-clearing.net (smartlab Innovationsgesellschaft mbH) 01:07, 800 Volt Technologies GmbH (PUMP) 28 Oct, 10:24, Ampeco Ltd 28 Oct, 10:24, Audi AG (Audi charging hub) 28 Oct, 10:25, ENIO GmbH 28 Oct, 10:25, EW Pricing GmbH (EV Price) 28 Oct, 10:25, EWE 28 Oct, 10:25, GLS Mobility GmbH 28 Oct, 10:28, GP JOULE Connect GmbH 28 Oct, 10:28, Grid & Co 28 Oct, 10:28, Hamburger Energienetze GmbH (eRound) 28 Oct, 10:30, INERGIA GmbH 28 Oct, 10:30, K.u.L 28 Oct, 10:30, LichtBlick eMobility GmbH 28 Oct, 10:31, Monta ApS 28 Oct, 10:34, Qwello Deutschland GmbH 28 Oct, 10:34, Road B.V 28 Oct, 10:34, SMATRICS GmbH & Co KG 28 Oct, 10:34, Wirelane GmbH 28 Oct, 10:35, chargecloud GmbH 28 Oct, 10:35, vaylens GmbH 28 Oct, 10:36, Taubert Consulting GmbH (TC-Backend) 28 Oct, 14:13, ELU Mobility 28 Oct, 14:14, Chargepool Enerando Technologies GmbH 28 Oct, 14:14, eliso GmbH 28 Oct, 14:14, chargecloud (CC0 1.0) 00:39, Taubert Consulting (CC0 1.0) 00:39, Bundesnetzagentur.de 00:54, ENERANDO Technologies GmbH 06:35, Freie und Hansestadt Hamburg 06:36 · not answering: 5)stale · ENIO GmbH · stale · Audi AG (Audi charging hub) · stale · Volkswagen Group Charging GmbH · +2
within 5.0 km
ALDI SE & Co. KG Mahlberg, Carl-Blos-Straße 2Offenburg · 2 charge points · up to 50 kW · status from 28 Oct, 20:18 — possibly out of date · 200 m south · Map · Google Maps
ParkplatzZeller Str. 1-3, Offenburg · 4 charge points · up to 22 kW · no status data, per charging point register · 250 m south · Map · Google Maps
SI Energy OffenburgOkenstrasse 24, Offenburg · 2 charge points · up to 23 kW · status from 27 Oct, 17:07 — possibly out of date, 1 without status · 300 m south-west · Map · Google Maps
B+B Parkhaus Offenburg - Gustav-Ree-AnlageGustav-Ree-Anlage 2, Offenburg · 14 charge points · up to 22 kW · 14 of 14 free(as of 06:39) · 450 m south · Map · Google Maps
Only a few operators publish live occupancy; “no status data” means unknown, not free.
Facilities
♿Step-free access
🚻Toilets
🧳Lockers
📶Wi-Fi
🎫Travel centre
🔎Lost and found
🤝Bahnhofsmission (station mission)
🛒Travel essentials
🅿️Car parking
🚲Bicycle parking
🚕Taxi rank
🚏Local transport
♿Mobility service: A mobility service is offered. · Mon–Sat 06:00–23:30, Sun 06:00–23:00 · Meeting point: DB Information
ℹ️DB Information: Mon–Sun 06:00–23:00, Public holiday 06:00–23:00
ℹ️Staff on site: Mon–Sun 06:00–23:30, Public holiday 06:00–23:30
The streets come from our street database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Warning marks: Datenbasis: Deutscher Wetterdienst, zusammengefasst
How the traffic light is set
Red for a full closure of the carriageway, a wrong-way driver, objects, people or animals on the road, an accident with a closure, a weather warning of level 3–4 or a jam with a delay of 30 minutes or more.
Yellow for a shorter jam, roadworks narrowing the road, another traffic warning, a weather warning of level 1–2, slippery roads in the road-weather forecast, a closed entry or exit — or when a source is missing or out of date.
Green only when none of this is reported nearby and both the traffic messages and the German Weather Service's warnings for this place can be read. Green is no guarantee of a clear road.
Read: every traffic message for this place within 5.0 km (Autobahn GmbH, police, Land and city) and the German Weather Service (warnings, road weather).
No colour from: parking, charging, fuel, buses and trains.
Official WARNING of FOG · Level 1 · —until 10:00What the DWD says
There is a risk of fog (level 1 of 1).
Visibility: < 150 m
Hazard(s) to expect: severely reduced visibility possible.
Recommendations for what to do:
Adapt your driving behaviour to sudden reduced visibility (fog banks).
DWD road-surface forecast for the nearest road-weather stations — a model forecast (run 05:00), not a measurement and not an official warning
The next hours at Unditz
07:00 air 3.7 °C · road surface 6.1 °C, dry
08:00 air 6.5 °C · road surface 7.7 °C, dry
09:00 air 8.6 °C · road surface 10.3 °C, dry
10:00 air 11.2 °C · road surface 14.0 °C, dry
11:00 air 13.3 °C · road surface 16.2 °C, dry
12:00 air 13.6 °C · road surface 17.8 °C, dry
No slippery class forecast until 30 Oct, 06:39.
Each line is for the station's own location, not for the whole road.
Ask your AI assistant:Is there a severe-weather warning for Offenburg right now?
Ask your AI assistant:Tell me here in this chat as soon as a severe-weather warning comes for Offenburg.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
🚧 Roads
Offenburg · 5.0 kmlive · (sources: Landesbetrieb Straßenbau NRW (VIZ.NRW) 06:36, Die Autobahn GmbH des Bundes (Mobilithek) 06:36, Landesmeldestelle für den Verkehrswarndienst Baden-Württemberg (Innenministerium Baden-Württemberg) 06:28, Landesmeldestelle Polizei Schleswig-Holstein 06:20, Senatsverwaltung für Mobilität 06:06, Landesmeldestelle Berlin (LMST BE) 06:33, Digitale Plattform Stadtverkehr Berlin / Baustellen 06:08, Stadt Köln 06:08, Landeshauptstadt Hannover – Fachbereich Tiefbau 04:54, Stadt Rüsselsheim am Main 05:21, Stadt Kassel 06:29, Stadt Leipzig 04:54 · not answering: 2)stale · Verkehrsmanagementzentrale Bremen · ↻
0 closures · 0 jams and accidents · 2 roadworks within 5.0 km
B3Lahr/Schwarzwald-Offenburg · 3.3 kmdirection unknownMon 5 Oct, 07:00 – Sat 31 Oct, 18:00 · in force now, ends in 2 daysRestriction unknownRoadworksMap · Google MapsAutomatic translation: Construction phase · Original (German) →
B3Achern-Offenburg · 4.8 kmdirection unknownWed 1 Jul, 00:00 – Sun 22 Nov, 23:59 · in force now, ends in 25 daysRestriction unknownRoadworksMap · Google MapsAutomatic translation: Construction phase · Original (German) →
Translated automatically by ViaFrei; the German original is binding. Opus-MT, Helsinki-NLP (Tiedemann, Thottingal) (CC BY 4.0)
Autobahn GmbH's motorway reports are on the “Motorways” card.
For lorries
Long-lorry positive network nearby: B3 1.8 km, B33A 1.8 km, L99 2.0 km, A5 3.4 km, L98 3.7 km, L75 9.8 km
What binds is the Annex to § 2(1) of the LKWÜberlStVAusnV. The publisher states that the data make no claim to be complete or correct, have no legal or official meaning, and are not suitable for navigation or similar purposes.
Ask your AI assistant:Are there closures or jams near Offenburg?
Ask your AI assistant:Tell me here in this chat when the traffic situation near Offenburg changes.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →
🛣 Motorways
Offenburgstale · not read yet (sources: Autobahn GmbH des Bundes not read yet · not answering: 1)↻
Motorways within 15 km, nearest first
A5 · traffic light there: Yellow · Offenburg junction · 3.4 kmOn the whole A5: 8 closures · 1 jam · 37 roadworksMost important now: Jam · Westkreuz Frankfurt am Main - Frankfurt am Main-Westhafen · Kassel → Frankfurt · Map · Google Maps
A5 · between Kronau junction (41) and Walldorf interchange (40) · near Bad Schönborn · Baden-Württemberg (placed by ViaFrei)towards Hattenbacher Dreieckplanned 09:00–15:001 of 3 lanes closed · Hard shoulder closed · Speed limit 80 km/hMaintenance works: clearing up after an accidentMap · Google Maps
A5 · between Bühl junction (52) and Rastatt-Süd junction (50) · near Bühl · Baden-Württemberg (placed by ViaFrei)both directionsplanned 20:00–30 Oct, 05:00 · further time windows: 31 of 3 lanes closed · Hard shoulder closedMaintenance works: drainage worksMap · Google Maps
Short-duration roadworks are planned at short notice and often changed; they replace neither a permit for oversize and heavy transport nor the route check before setting off (our translation of the publisher's note).
The publisher's wording is on the German page.
Nearby
A5Offenburg - Unditz · 3.5 kmboth directionsfrom Wed 28 Oct, 00:00, end not reported · in force nowRestriction unknownRoadworksMap · Google Mapsbetween 0.6 km after AS Offenburg and 5.8 km before Unditz · 2.45 km long · 8.45 m wide to pass · 28 Oct 2026 – 16 Mar 2027