Nürnberg, Allersberger Straße closed between Humboldtstraße and Wodanstraße, construction site, from 24/03/2026, 07:30 to 30/06/2027, 15:00 Due to a large extension in the … · Original (German) →Full text
Nürnberg, Allersberger Straße closed between Humboldtstraße and Wodanstraße, construction site, from 24/03/2026, 07:30 to 30/06/2027, 15:00 Due to a large extension in the Allersberger str. between Schweiggerstr. and Wodanstr., the roadway is completely closed on a sectional basis. A passage is not possible over the entire period. The works include the renovation of the tram tracks from the VAG, the renovation of the SUN canal, the renovation and re-location of N-Ergie lines and the development of SÖR roads. There's a detour signposted.