Nürnberg, Zickstraße closed between Fürther Straße and Bärenschanzstraße, construction site, from 10/03/2026, 07:30 to 18/12/2026, 15:00 The SUN channel operation, which N-Ergie … · Original (German) →Full text
Nürnberg, Zickstraße closed between Fürther Straße and Bärenschanzstraße, construction site, from 10/03/2026, 07:30 to 18/12/2026, 15:00 The SUN channel operation, which N-Ergie and SÖR are located at the corner Willstraße/Fürther Straße a common construction site. After the canal work and laying of the supply lines, the walkways and the roadway are renovated. Willstraße Kernstraße and Bärenschanzstraße are fully closed during this period. The Fürther Straße is only accessible with one lane per direction of travel.