Beta ViaFrei is in beta: answers and coverage can change, and the AI can make mistakes. Please check important details with the source named. What this means
Hinterweidenthal, Ort
Hinterweidenthal, Ort, Rhineland-Palatinate: the next departures live with their platform, which lifts and escalators work now, platforms with step-free access, facilities and surroundings – from open data, with source and date.
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Charging
within 500 m
Shell RechargeShell Recharge OBN 0953 - Shell Kaltenbach B10Kaltenbach B 10, Hinterweidenthal400 m north-west · Map · Google Maps
up to 150 kWHPC4 charge pointsCCS2
status from 1 Nov, 19:28 — possibly out of date, 2 without status
Only a few operators publish live occupancy; “no status data” means unknown, not free.
3 × Roadworks narrowing the road · Verkehrsmeldungen der Polizei: Landesbetrieb Straßenbau NRW (VIZ.NRW) via Mobilithek, Datenlizenz Deutschland – Zero – Version 2.0
Schematic map – not for navigation.Streets (OpenStreetMap)Buses and trainsCharging
The streets come from our street database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Warning marks: Datenbasis: Deutscher Wetterdienst, zusammengefasst
How the traffic light is set
Red for a full closure of the carriageway, a wrong-way driver, objects, people or animals on the road, an accident with a closure, a weather warning of level 3–4 or a jam with a delay of 30 minutes or more.
Yellow for a shorter jam, roadworks narrowing the road, another traffic warning, a weather warning of level 1–2, slippery roads in the road-weather forecast, a closed entry or exit — or when a source is missing or out of date.
Green only when none of this is reported nearby and both the traffic messages and the German Weather Service's warnings for this place can be read. Green is no guarantee of a clear road.
Read: every traffic message for this place within 5.0 km (Autobahn GmbH, police, Land and city) and the German Weather Service (warnings, road weather).
No colour from: parking, charging, fuel, buses and trains.
RB55 to Landau, Hauptbahnhof · in 27 min(05:04) · on time · platform 1
Platforms per DB: 1 of 1 step-free
Hinterweidenthal, Kirche🚌Bus 700 m · 9 min walk · Map · Google MapsNothing leaves here in the next 60 minutes, by the timetable.
Hinterweidenthal, Ost🚆Train 2.1 km · 26 min walk · Map · Google MapsNothing leaves here in the next 60 minutes, by the timetable.Platforms per DB: 1 of 2 step-free, 1 not step-free
Salzwoog, Tanklager🚌Bus 2.5 km · 32 min walk · Map · Google Maps
250 to Pirmasens, Hauptbahnhof · in 22 min(04:59) · timetable · platform 2
Moosbachtal🚆Train 3.3 km · 41 min walk · Map · Google MapsWe cannot match this station to the live train data yet; the times are timetable times.Nothing leaves here in the next 60 minutes, by the timetable.
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
🚧 Roads
Hinterweidenthal, Ort, Hinterweidenthal · 5.0 kmlive · (sources: Landesbetrieb Straßenbau NRW (VIZ.NRW) 04:29, Die Autobahn GmbH des Bundes (Mobilithek) 04:26, Landesmeldestelle für den Verkehrswarndienst Baden-Württemberg (Innenministerium Baden-Württemberg) 04:21, Landesmeldestelle Polizei Schleswig-Holstein 04:21, Senatsverwaltung für Mobilität 03:38, Landesmeldestelle Berlin (LMST BE) 04:22, Digitale Plattform Stadtverkehr Berlin / Baustellen 03:38, Stadt Köln 03:39, Landeshauptstadt Hannover – Fachbereich Tiefbau 02:31, Verkehrsmanagementzentrale Bremen 03:38, Stadt Rüsselsheim am Main 02:58, Stadt Kassel 03:44, Stadt Leipzig 02:26 · not answering: 1)↻
0 closures · 0 jams and accidents · 3 roadworks within 5.0 km
850 mdirection unknownfrom Thu 29 Oct, 14:52, end not reported · in force nowRestriction unknownRoadworksMap · Google MapsAutomatic translation: B10 Pirmasens Richtung Karlsruhe between B427, Hinterweidenthal and Hinterweidenthal Maintenance work, Mo and Di between 08:00 and 17:00 Production of media signs on B 10 at … · Original (German) →Full text
B10 Pirmasens Richtung Karlsruhe between B427, Hinterweidenthal and Hinterweidenthal Maintenance work, Mo and Di between 08:00 and 17:00 Production of media signs on B 10 at Hinterweidenthal
1.6 kmdirection unknownfrom Thu 29 Oct, 14:52, end not reported · in force nowRestriction unknownRoadworksMap · Google MapsAutomatic translation: B10 Pirmasens Richtung Karlsruhe between B427, Hinterweidenthal and Einfahrt Hauenstein Maintenance work, Mi and Do between 08:00 and 17:00 Production of signs on B 10 at … · Original (German) →Full text
B10 Pirmasens Richtung Karlsruhe between B427, Hinterweidenthal and Einfahrt Hauenstein Maintenance work, Mi and Do between 08:00 and 17:00 Production of signs on B 10 at Hinterweidenthal
4.5 kmdirection unknownMon 14 Sept, 09:00 – Fri, 27 Oct 2028, 16:30 · in force now, ends in 725 daysRestriction unknownRoadworksMap · Google MapsAutomatic translation: B10 Karlsruhe Richtung Pirmasens between Einfahrt Hauenstein and Hinterweidenthal Maintenance work, from 14/09/2026, 09:00 to 27/10/2028, 16:30 Traffic restrictions Due to the … · Original (German) →Full text
B10 Karlsruhe Richtung Pirmasens between Einfahrt Hauenstein and Hinterweidenthal Maintenance work, from 14/09/2026, 09:00 to 27/10/2028, 16:30 Traffic restrictions Due to the upgrading of the B 10 at Hauenstein in the area of the rock nose, in several construction phases. In this work, an embankment is produced below the "rock nose", in which an additional roadway is later built, which will take up traffic in the direction of Pirmasens. A securing system consisting of up to 15 m long rock nails and a wire mesh is provided for the attachment of the newly emerging embankment surface. To protect the flowing traffic on the B 10 a mobile scree fence is built. The installation is carried out at night under half-way blocking and traffic light control. Following this, only minimal traffic impairments can be expected in the first phases of construction according to current planning.
Rhineland-Palatinate: we do not hold federal or state roads – for them this is no all-clear
The publishers' own texts are on the German page.
Translated automatically by ViaFrei; the German original is binding. Opus-MT, Helsinki-NLP (Tiedemann, Thottingal) (CC BY 4.0)
Autobahn GmbH's motorway reports are on the “Motorways” card.
For lorries
Long-lorry positive network nearby: B10 650 m, A62 13 km, L474 14 km, A8 15 km
What binds is the Annex to § 2(1) of the LKWÜberlStVAusnV. The publisher states that the data make no claim to be complete or correct, have no legal or official meaning, and are not suitable for navigation or similar purposes.
Ask your AI assistant:Are there closures or jams near Hinterweidenthal?
Ask your AI assistant:Tell me here in this chat when the traffic situation near Hinterweidenthal changes.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →
Short-duration roadworks are planned at short notice and often changed; they replace neither a permit for oversize and heavy transport nor the route check before setting off (our translation of the publisher's note).
The publisher's wording is on the German page.
Nearby
A62 at Thaleischweiler-Fröschen junction · 14 kmdirection unknownfrom Thu 17 Sept, 00:00, end not reported · in force nowRestriction unknownRoadworksMap · Google Maps0.06 km long · 4.5 m wide to pass · 17 Sept – 1 Dec