Kreis Neuwied L257 between Frorath and Weißfeld Construction site, closed, from 12/10/2026, 00:00 to 01/10/2027, 23:59 Full lock of L 257 Place passage Frorath (houses, Wied) due … · Original (German) →Full text
Kreis Neuwied L257 between Frorath and Weißfeld Construction site, closed, from 12/10/2026, 00:00 to 01/10/2027, 23:59 Full lock of L 257 Place passage Frorath (houses, Wied) due to the full expansion of the OD. The diversion takes place via the K 5 Stopperich and Over to Waldbreitbach. In the direction of Hausen (Wied) the L 255 and L 257 are to be used. The redirection route for the LKW-Verkehr takes place via L254 and L256 to Roßbach and is then routed via L255 towards Waldbreitbach.