Beta ViaFrei is in beta: answers and coverage can change, and the AI can make mistakes. Please check important details with the source named. What this means
Andernach
Andernach, Rhineland-Palatinate: the next departures live with their platform, which lifts and escalators work now, platforms with step-free access, facilities and surroundings – from open data, with source and date.
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Charging
live · (sources: EnBW AG 13:31, Eco-Movement 13:31, Tesla Germany GmbH 13:08, Volkswagen Group Charging GmbH 10:31, e-clearing.net (smartlab Innovationsgesellschaft mbH) 13:30, 800 Volt Technologies GmbH (PUMP) 10:33, Ampeco Ltd 10:33, Audi AG (Audi charging hub) 10:33, ENIO GmbH 10:33, EW Pricing GmbH (EV Price) 10:33, EWE 10:34, GLS Mobility GmbH 10:34, GP JOULE Connect GmbH 10:34, Grid & Co 10:34, Hamburger Energienetze GmbH (eRound) 10:35, INERGIA GmbH 10:40, K.u.L 10:40, LichtBlick eMobility GmbH 10:40, Monta ApS 10:40, Qwello Deutschland GmbH 10:41, Road B.V 10:41, SMATRICS GmbH & Co KG 10:42, Wirelane GmbH 10:42, chargecloud GmbH 10:42, vaylens GmbH 10:42, Taubert Consulting GmbH (TC-Backend) 14:21, ELU Mobility 14:21, Chargepool Enerando Technologies GmbH 14:21, eliso GmbH 14:21, chargecloud (CC0 1.0) 31 Oct, 16:22, Taubert Consulting (CC0 1.0) 31 Oct, 16:22, Bundesnetzagentur.de 01:12, ENERANDO Technologies GmbH 14:51, Freie und Hansestadt Hamburg 14:53 · not answering: 3)stale · ENIO GmbH · stale · Smartlab Innovationsgesellschaft mbH (ladebusiness) · stale · Smartlab Innovationsgesellschaft mbH (ladenetz.de) ·
within 5.0 km
Andernach - Bahnhofstraße 42Bahnhofstraße 42, Andernach · 2 charge points · up to 22 kW · no status data · 350 m north-west · Map · Google Maps
ENBW, Breite Straße 31-41Andernach · 5 charge points · up to 300 kW · status from 31 Oct, 18:59 — possibly out of date · 350 m west · Map · Google Maps
Energieversorgung Mittelrhein AG, Am Stadtgraben 31aAndernach · 2 charge points · up to 11 kW · no status data, per charging point register · 450 m north · Map · Google Maps
Only a few operators publish live occupancy; “no status data” means unknown, not free.
Facilities
♿Step-free access
🎫Travel centre
🛒Travel essentials
🅿️Car parking
🚲Bicycle parking
🚕Taxi rank
🚏Local transport
♿Mobility service: A mobility service is offered. · Mon–Sun 06:15–12:30 · Meeting point: Bahnhofshalle
☎️3-S service centre: 06131/151055
As of 31 October 2026
Around the station
Within 300 m:
Pharmacy
Post-Apotheke150 m · Breite Straße 76 · Map · Google Maps
Food
Nam Linh - Asia Sushi100 m · Breite Straße 75 · Map · Google Maps
Europa-Grill150 m · Breite Straße 111 · Map · Google Maps
Yellow — Roadworks narrowing the road · Andernach, Ernestus-Platz bis Hochstraße zwischen Koblenzer Straße und Obere Wallstraße · 500 m
Within 5.0 km of Andernach. No motorway junction within 5.0 km: the traffic light judges the other roads.
3 × Roadworks narrowing the road · Verkehrsmeldungen der Polizei: Landesbetrieb Straßenbau NRW (VIZ.NRW) via Mobilithek, Datenlizenz Deutschland – Zero – Version 2.0
Schematic map – not for navigation.Streets (OpenStreetMap)Buses and trainsLorry parking and rest areas
The streets come from our street database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Red for a full closure of the carriageway, a wrong-way driver, objects, people or animals on the road, an accident with a closure, a weather warning of level 3–4 or a jam with a delay of 30 minutes or more.
Yellow for a shorter jam, roadworks narrowing the road, another traffic warning, a weather warning of level 1–2, slippery roads in the road-weather forecast, a closed entry or exit — or when a source is missing or out of date.
Green only when none of this is reported nearby and both the traffic messages and the German Weather Service's warnings for this place can be read. Green is no guarantee of a clear road.
Read: every traffic message for this place within 5.0 km (Autobahn GmbH, police, Land and city) and the German Weather Service (warnings, road weather).
No colour from: parking, charging, fuel, buses and trains.
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
🚧 Roads
Andernach · 5.0 kmlive · (sources: Landesbetrieb Straßenbau NRW (VIZ.NRW) 14:46, Die Autobahn GmbH des Bundes (Mobilithek) 14:48, Landesmeldestelle für den Verkehrswarndienst Baden-Württemberg (Innenministerium Baden-Württemberg) 14:45, Landesmeldestelle Polizei Schleswig-Holstein 14:25, Senatsverwaltung für Mobilität 14:28, Landesmeldestelle Berlin (LMST BE) 14:51, Digitale Plattform Stadtverkehr Berlin / Baustellen 14:28, Stadt Köln 14:28, Landeshauptstadt Hannover – Fachbereich Tiefbau 14:29, Verkehrsmanagementzentrale Bremen 14:27, Stadt Rüsselsheim am Main 11:55, Stadt Kassel 14:31, Stadt Leipzig 14:23 · not answering: 1)↻
0 closures · 0 jams and accidents · 12 roadworks within 5.0 km
500 mdirection unknownMon 2 Mar, 00:00 – Thu 31 Dec, 23:30 · in force now, ends in 60 daysRestriction unknownRoadworksMap · Google MapsAutomatic translation: Andernach, Ernestus-Platz to Hochstraße between Koblenzer Straße and Obere Wallstraße Construction site, closed, until 31/12/2026, 23:30 Full lock Hochstraße - Emergency lock - … · Original (German) →Full text
Andernach, Ernestus-Platz to Hochstraße between Koblenzer Straße and Obere Wallstraße Construction site, closed, until 31/12/2026, 23:30 Full lock Hochstraße - Emergency lock - danger of falling stones in the area of the city wall
550 mdirection unknownMon 2 Mar, 00:00 – Thu 31 Dec, 23:30 · in force now, ends in 60 daysRestriction unknownRoadworksMap · Google MapsAutomatic translation: Andernach, Ernestus-Platz between Hindenburgwall and Am Stadtgraben Construction site, closed, until 31/12/2026, 23:30 Full lock Hochstraße - Emergency lock - danger of falling … · Original (German) →Full text
Andernach, Ernestus-Platz between Hindenburgwall and Am Stadtgraben Construction site, closed, until 31/12/2026, 23:30 Full lock Hochstraße - Emergency lock - danger of falling stones in the area of the city wall
800 mdirection unknownMon 3 Aug, 00:00 – Fri 18 Dec, 23:59 · in force now, ends in 47 daysRestriction unknownRoadworksMap · Google MapsAutomatic translation: Andernach, Goethestraße between Schillerring and Uhlandhof Construction site, closed, until 18/12/2026, 23:59 Road development Goethestraße · Original (German) →
Rhineland-Palatinate: we do not hold federal or state roads – for them this is no all-clear
The publishers' own texts are on the German page.
Translated automatically by ViaFrei; the German original is binding. Opus-MT, Helsinki-NLP (Tiedemann, Thottingal) (CC BY 4.0)
Autobahn GmbH's motorway reports are on the “Motorways” card.
For lorries
Long-lorry positive network nearby: B256 2.1 km, L121 3.0 km, L123 5.4 km, A61 5.5 km, L117 6.3 km, B412 7.1 km
What binds is the Annex to § 2(1) of the LKWÜberlStVAusnV. The publisher states that the data make no claim to be complete or correct, have no legal or official meaning, and are not suitable for navigation or similar purposes.
Ask your AI assistant:Are there closures or jams near Andernach?
Ask your AI assistant:Tell me here in this chat when the traffic situation near Andernach changes.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →
🛣 Motorways
Andernachstale · not read yet (sources: Autobahn GmbH des Bundes not read yet · not answering: 1)↻
A61 · between Sinzig interchange (31) and Bad Neuenahr interchange (30) · near Sinzig · Rhineland-Palatinate (placed by ViaFrei)towards Nettetalplanned 3 Nov, 19:00–4 Nov, 05:00 · further time windows: 2Hard shoulder closed · Speed limit 80 km/hChanged traffic layout: setting up and removing the roadworks barriersMap · Google Maps
Short-duration roadworks are planned at short notice and often changed; they replace neither a permit for oversize and heavy transport nor the route check before setting off (our translation of the publisher's note).
The publisher's wording is on the German page.
Nearby
A61Moseltal-West - Koblenz/Dieblich · 15 kmtowards Ludwigshafenfrom Tue 9 Jun, 00:00, end not reported · in force nowRestriction unknownRoadworksMap · Google Mapsbetween 0.1 km after Moseltal-West and 0.5 km before AS Koblenz/Dieblich · 1.65 km long · max. 80 km/h · 7 m wide to pass · 9 Jun 2026 – 2 Dec 2030
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Truck-parking occupancy (Toll Collect, SID)
By clicking you accept the terms of use (section 2, truck parking).