Beta ViaFrei is in beta: answers and coverage can change, and the AI can make mistakes. Please check important details with the source named. What this means
Lenting
Everything ViaFrei knows about Lenting right now – from open data, with the source of every figure.
For chargers, fuel stations and warnings right where you are – your exact location stays on your device.
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
0 closures · 0 jams and accidents · 42 roadworks within 5.0 km
1.9 kmdirection unknownMon 28 Sept, 07:00 – Sat 31 Oct, 17:00 · in force now, ends in 5 daysRestriction unknownRestrictionMap · Google Mapsthe publisher's wording: Text only in German →
1.9 kmdirection unknownMon 19 Oct, 07:00 – Fri 30 Oct, 17:00 · in force now, ends in 4 daysRestriction unknownRestrictionMap · Google Mapsthe publisher's wording: Text only in German →
2.2 kmdirection unknownMon 7 Sept, 07:00 – Tue 17 Nov, 17:00 · in force now, ends in 22 daysRestriction unknownRestrictionMap · Google Mapsthe publisher's wording: Text only in German →
Bavaria: we do not hold state roads – for them this is no all-clear
The publishers' own texts are on the German page.
Autobahn GmbH's motorway reports are on the “Motorways” card.
City and Land roadworks, now
Roadworks · full closure · until 31 Oct 2026 · 1.9 km · Map · Google Maps
Roadworks · until 30 Oct 2026 · 1.9 km · Map · Google Maps
Roadworks · until 2 Nov 2026 · 2.0 km · Map · Google Maps
The names of the sites are on the German page.
For lorries
Long-lorry positive network nearby: A9 250 m, S2335 1.0 km, S2231 3.0 km, B16A 3.7 km, B16 10 km, B299 16 km
What binds is the Annex to § 2(1) of the LKWÜberlStVAusnV. The publisher states that the data make no claim to be complete or correct, have no legal or official meaning, and are not suitable for navigation or similar purposes.
Ask your AI assistant:Are there closures or jams near Lenting?
Ask your AI assistant:Tell me here in this chat when the traffic situation near Lenting changes.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →
A9 · between Pegnitz junction (44) and Bayreuth-Süd junction (42) · near Pegnitz · Bavaria (placed by ViaFrei)towards Schwielowseeplanned for now, 23 Sept, 00:00–12 Nov, 07:001 of 3 lanes closed · Hard shoulder closedChanged traffic layout: setting up and removing the roadworks barriersMap · Google Maps
A9 · at Altmühltal junction (58) · near Beilngries · Bavaria (placed by ViaFrei)direction unknownplanned for now, 26 Oct, 09:15–30 Oct, 17:45Full closureMaintenance works: surveying and ground investigationMap · Google Maps
A9 · between Großkugel junction (17) and Wiedemar junction (15) · near Schkeuditz · Saxony (placed by ViaFrei)towards Münchenplanned for now, 26 Oct, 19:00–08:00 · further time windows: 32 of 3 lanes closed · Hard shoulder closed · Speed limit 80 km/hMaintenance works: road surface repairMap · Google Maps
A9 · between Schleiz junction (28) and Triptis junction (26) · Thuringia (placed by ViaFrei)towards Schwielowseeplanned 07:00–18:00 · further time windows: 11 of 3 lanes closed · Hard shoulder closed · Speed limit 80 km/hMaintenance works: clearing up after an accidentMap · Google Maps
Short-duration roadworks are planned at short notice and often changed; they replace neither a permit for oversize and heavy transport nor the route check before setting off (our translation of the publisher's note).
The publisher's wording is on the German page.
Nearby
A9Denkendorf - Ingolstadt-Süd · 7.2 kmtowards Münchenfrom Wed, 12 Nov 2025, 00:00, end not reported · in force nowRestriction unknownRoadworksMap · Google Mapsbetween 6.7 km after AS Denkendorf and 1.8 km before AS Ingolstadt-Süd · 11.89 km long · max. 60 km/h · 8.5 m wide to pass · 12 Nov 2025 – 11 Nov 2026
Lorry parking · Köschinger Forst Ost · 266 spaces · 128 lorry spaces · 3.4 km north · Map · Google MapsFacilities per the publisher: toilet · shower · restaurant · fuel station · drinking water · picnic area · playgroundNearby per OpenStreetMap (straight line, access not checked): snack bar 70 mNearby (straight line, access not checked): EV charger 350 kW, 30 m (IONITY)
Lorry parking · Köschinger Forst West · 185 spaces · 115 lorry spaces · 3.4 km north · Map · Google MapsFacilities per the publisher: toilet · shower · drinking water · picnic area · playgroundNearby per OpenStreetMap (straight line, access not checked): snack bar 60 m · restaurant 70 mNearby (straight line, access not checked): EV charger 50 kW, 60 m (Mer Germany)
Live occupancy only where the operator publishes it — ask your assistant.
Ask your AI assistant:Where is a lorry park near Lenting?
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
ASAP Electronics GmbH, Felix-Wankel-Ring 13Lenting · 2 charge points · up to 22 kW · status from 26 Oct, 10:40 — possibly out of date · 500 m north-east · Map · Google Maps
Lenting - BahnhofstraßeBahnhofstraße 16, Lenting · 2 charge points · up to 11 kW · 2 of 2 free(as of 01:48) · 550 m east · Map · Google Maps
ASAP Electronics GmbH, Felix-Wankel-Ring 10Lenting · 2 charge points · up to 22 kW · status from 26 Oct, 17:42 — possibly out of date · 650 m north-east · Map · Google Maps
Ask your AI assistant:Where is the nearest charging station in Lenting?
Ask your AI assistant:Tell me here in this chat as soon as a charge point turns free at the nearest charging station in Lenting.
Your AI assistant gives this answer only when ViaFrei is connected.https://mcp.viafrei.de/mcpHow to connect ViaFrei →