Hamburg Friedrich-Ebert-Damm, urban inward between Stephanstraße and Begonienweg road narrowing, maximum road width of 3.25 m, permanent construction site, to 01/08/2027, Mo - Fr … · Original (German) →Full text
Hamburg Friedrich-Ebert-Damm, urban inward between Stephanstraße and Begonienweg road narrowing, maximum road width of 3.25 m, permanent construction site, to 01/08/2027, Mo - Fr between 09:00 and 15:00