Beta ViaFrei is in beta: answers and coverage can change, and the AI can make mistakes. Please check important details with the source named. What this means
A535 motorway now
The A535 runs from Sonnborner Kreuz interchange to Velbert-Nord interchange, about 13 km long (schematic), through North Rhine-Westphalia, with 6 junctions and interchanges (2 of them interchanges). Reported on the A535 now: 0 closures, 0 jams, 3 roadworks (as of 09:15).
Reported now
0 closures · 0 jams · 3 roadworks · as of 09:15
By direction
- Velbert → Wuppertal: 0 closures · 0 jams · 1 roadworks
- Wuppertal → Velbert: 0 closures · 0 jams · 2 roadworks
Map
- Junction or interchange
- Roadworks
- Charging station
- Road-weather station
Schematic: the line joins the points of the Location Code List in their order – not to scale, not a navigation map. Where the list has a gap, the line breaks too.
Map sources
Kartengrundlage: © BKG (2026) dl-de/by-2-0, Datenquellen: https://sgx.geodatenzentrum.de/web_public/gdz/datenquellen/datenquellen_vg_nuts.pdf (Daten verändert)
TMC Location Code List (LCL 22.0): Bundesanstalt für Straßenwesen (BASt), CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/), bearbeitet · licence text
Ladesäulenregister: Bundesnetzagentur.de, CC BY 4.0, bearbeitet · licence text
Ladepunkte: Eco-Movement via Mobilithek, CC BY 4.0, bearbeitet · licence text
Ladepunkte: e-clearing.net (smartlab Innovationsgesellschaft mbH) via Mobilithek, CC0 1.0
Ladepunkte: Hamburger Energienetze GmbH (eRound) via Mobilithek, CC0 1.0
Quelle: Deutscher Wetterdienst. Datenquelle: BMVBS und Straßenbauverwaltungen der Länder · licence text Die Daten der Glättemeldeanlagen stellen ungeprüfte Punktmessungen dar und spiegeln nicht die Verhältnisse auf einem Straßenabschnitt wider. Es besteht kein Anspruch auf regelmäßige und vollständige Datenlieferungen.
Closures, jams and roadworks on the A535
Closures
none
Jams
none
Roadworks
- Roadworks · Sonnborner Kreuz - Wuppertal-Dornap · Wuppertal → Velbert · Map
- Roadworks · Tönisheide - Velbert · Wuppertal → Velbert · Map
- Roadworks · Wuppertal-Dornap - Sonnborner Kreuz · Velbert → Wuppertal · Map
Planned full closures, next 7 days
Autobahn GmbH announces no full closure on this motorway for the next 7 days (as of 09:15).
Route
From Sonnborner Kreuz interchange to Velbert-Nord interchange · 6 junctions and interchanges
about 13 km along the points of the Location Code List (schematic)
Through North Rhine-Westphalia (state by the nearest municipality of each junction)
Junction strip
The junctions in their order, with what is reported at each.
- 6 Sonnborner Kreuz interchange meets A46 2 roadworks · parking · charging
- 5 Wuppertal-Dornap junction parking
- 4 Wülfrath junction parking · charging · road weather
- 3 Tönisheide junction parking · charging
- 2 Velbert junction 1 roadworks · parking · charging
- 1 Velbert-Nord interchange meets A44 parking · charging
Places on the A535
Parking and rest
Car parks
- Park and ride · Wuppertal Sonnborn Bf · at Sonnborner Kreuz interchange
- Park and ride · Wuppertal Sonnborner Ufer · at Sonnborner Kreuz interchange
- Park and ride · Wuppertal Zoo/Stadion · at Sonnborner Kreuz interchange
- Park and ride · Wuppertal Zoolog. Garten Bf · at Sonnborner Kreuz interchange
- Park and ride · Wülfrath-Aprath Bf · at Wuppertal-Dornap junction
Park&Ride-Anlagen: VRR AöR via opendata-oepnv.de, CC BY, bearbeitet · licence text
P+R sites from P+R NRW (CC BY-SA), held separately — not cross-checked with the entries above
- Park and ride · Wuppertal Sonnborn Bf · occupancy not carried by us · 150 m · Map
- Park and ride · Wuppertal Sonnborner Ufer · occupancy not carried by us · 600 m · Map
- Park and ride · Wuppertal Zoo/Stadion · occupancy not carried by us · 800 m · Map
- Park and ride · Wuppertal Zoolog. Garten Bf · occupancy not carried by us · 800 m · Map
- Park and ride · Wülfrath-Aprath Bf · occupancy not carried by us · 1.2 km · Map
P+R NRW: NRW.Mobidrom via Mobilithek, Datensatz „Gebündelte Daten Park+Ride NRW“, CC BY-SA, bearbeitet · licence text
The P+R NRW entries are licensed CC BY-SA (share-alike) by their source: anyone who passes them on, or builds something on them, must release the result under the same licence and with this attribution. We release our adaptation under CC BY-SA 4.0
More car parks mapped by OpenStreetMap
- Stocko-Parkplatz · at Sonnborner Kreuz interchange · 400 m
- Wanderparkplatz Reuterstraße · at Wülfrath junction · 750 m
- Kirchplatz Tönisheide Kirchstraße 43 · at Tönisheide junction · 500 m
- ALDI · at Velbert junction · 400 m
- Parkplatz Brauhaus · at Velbert junction · 400 m
- Parkplatz Café Klärchen · at Velbert junction · 450 m
- Katholischer Friedhof St. Marien · at Velbert-Nord interchange · 800 m
- Wanderparkplatz Langenhorst Fasanenweg 1 · at Velbert-Nord interchange · 850 m
OSM-Standortdaten: © OpenStreetMap-Mitwirkende, ODbL 1.0 · licence text
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Charging
Charging stations within 600 m of the junctions and service areas. Charging stations read 09:14; each point's status with its own time.
- ALDI Nord Parkplatz · 2 charge points · up to 150 kW · no status data · at Sonnborner Kreuz interchange
- go2zero charging solutions gmbh SV Bayer Wuppertal · 4 charge points · up to 7 kW · status from 06:32 — possibly out of date, 2 without status · at Sonnborner Kreuz interchange
- SV Bayer Wuppertal e.V. · 4 charge points · up to 22 kW · no status data · at Sonnborner Kreuz interchange
- 11230089_Wülfrath · 2 charge points · up to 300 kW · no status data · at Wülfrath junction
- Shell Recharge OBN 0885 - Shell Hohdalsfeld · 4 charge points · up to 300 kW · status from 08:41 — possibly out of date · at Wülfrath junction
- Kuhlendahler Straße 14 · 2 charge points · up to 22 kW · status from 20 Oct, 21:37 — possibly out of date, 1 without status · at Tönisheide junction
- OBI Velbert · 2 charge points · up to 11 kW · no status data · at Velbert junction
- Pfalzwerke Ladestation (OBI) · 6 charge points · up to 400 kW · status from 04:26 — possibly out of date · at Velbert junction
- Siedlergemeinschaft Langenhorst e.V. · 2 charge points · up to 22 kW · no status data · at Velbert-Nord interchange
Only a few operators publish live occupancy; “no status data” means unknown, not free.
Fast charging from 150 kW and power classes
Longest stretch without a charging site of 150 kW or more: from Sonnborner Kreuz interchange to Wülfrath junction, about 6.8 km (schematic).
By power: under 50 kW: 5 · 150 kW and up: 4.
Our count of the sites above (within the distance named from a junction or service area) – whether one is free, the list says.
Ladesäulenregister: Bundesnetzagentur.de, CC BY 4.0, bearbeitet · licence text
Ladepunkte: e-clearing.net (smartlab Innovationsgesellschaft mbH) via Mobilithek, CC0 1.0
Ladepunkte: Eco-Movement via Mobilithek, CC BY 4.0, bearbeitet · licence text
Ladepunkt-Verfügbarkeit: Eco-Movement via Mobilithek, CC BY 4.0, bearbeitet · licence text
Ladepunkt-Verfügbarkeit: Hamburger Energienetze GmbH (eRound) via Mobilithek, CC0 1.0
Ladepunkte: Hamburger Energienetze GmbH (eRound) via Mobilithek, CC0 1.0
Ladepunkte: Smartlab Innovationsgesellschaft mbH (ladenetz.de) via Mobilithek, CC0 1.0
Weather along the motorway
Official warnings of the Deutscher Wetterdienst
No official warning along the motorway.
Road-surface forecast
DWD road-surface forecast for the nearest road-weather stations — a model forecast (run 08:00), not a measurement and not an official warning
- Wuelfrath · at Wülfrath junction · 10:00: dry, road surface 11.8 °C
Each line is for the station's own location, not for the whole road.
Quelle: Deutscher Wetterdienst. Datenquelle: BMVBS und Straßenbauverwaltungen der Länder · licence text Die Daten der Glättemeldeanlagen stellen ungeprüfte Punktmessungen dar und spiegeln nicht die Verhältnisse auf einem Straßenabschnitt wider. Es besteht kein Anspruch auf regelmäßige und vollständige Datenlieferungen.
Fuel prices
We load the prices of the filling stations along the motorway only when you ask for them. Loading the prices needs JavaScript on this page.
Loading prices …
The prices cannot be fetched right now.
On every motorway
Lorry driving ban
On Sundays and public holidays, lorries over 7.5 t and lorries with trailers may not drive between 00:00 and 22:00. (§ 30 Abs. 3 StVO)
Next ban day: Sunday 25 October.
The motorway's states by the nearest municipality of each junction. Holidays per § 30 Abs. 4 StVO, reviewed 8 October 2026 · Informational, not legal advice.
- On the Autobahn there is no general speed limit where no sign says otherwise; the advisory speed is 130 km/h. Drive faster and you can share liability in a crash. (Autobahn-Richtgeschwindigkeits-V)
- Rescue lane: as soon as traffic slows on a motorway or rural road with at least two lanes per direction, keep a lane free between the leftmost lane and the one beside it — immediately, not once the blue lights arrive. (§ 11 Abs. 2 StVO)
- 112 reaches ambulance and fire service (Europe-wide), 110 the police — free from any network, credit or not. (Notrufverordnung (NotrufV))
Reviewed 19 September 2026 · Informational, not legal advice.