Flechtorf
5 closures, 10 roadworks · as of 09:20
Both directions, 10 km either side of the junction
Towards Maschener Kreuz/A7—
- Roadworks · km 136.50 → km 147.50 · Map · Google Maps
50 m after - Roadworks · Fallersleben - Sandkamp · Braunschweig → Wolfsburg · Map · Google Maps
6.2 km after - Closure · Map · Google Maps
6.4 km after - +1
Next stop: Charging · Pfalzwerke AG · 300 m · Map · Google Maps
Towards Salzgitter interchange—
- Roadworks · km 136.50 → km 147.50 · Map · Google Maps
50 m before - Closure · Map · Google Maps
6.4 km before - Closure · Wolfsburg → Braunschweig · Map · Google Maps
6.6 km before - +2
Next stop: Charging · Allego · 14 km · Map · Google Maps
Sources: Autobahn GmbH des Bundes, Bundesanstalt für Straßenwesen, Bundesnetzagentur.de, Eco-Movement
At Flechtorf junction on the A39, reported now: 1 roadworks (as of 09:20).
Traffic light for the A39
Yellow — Roadworks narrowing the road · km 136.50 → km 147.50
For your choice on the A39.
- Roadworks narrowing the road · km 136.50 → km 147.50 · Verkehrsdaten: Autobahn GmbH des Bundes
How the traffic light is set
- Red for a full closure of the carriageway, a wrong-way driver, objects, people or animals on the road, an accident with a closure, a weather warning of level 3–4 or a jam with a delay of 30 minutes or more.
- Yellow for a shorter jam, roadworks narrowing the road, another traffic warning, a weather warning of level 1–2, slippery roads in the road-weather forecast, a closed entry or exit — or when a source is missing or out of date.
- Green only when none of this is reported and the Autobahn GmbH reports, the Deutscher Wetterdienst warnings and, for every state in the area, a police source of its own are current. Green is no guarantee of a clear road.
- With your position, everything within the chosen radius along the motorway that lies ahead of you in the chosen direction counts; what lies behind you or on the other carriageway does not. More than 2.0 km away from the motorway, it is counted from the nearest junction.
- Read: the Autobahn GmbH (closures, jams, traffic warnings, roadworks), police and state traffic messages (for the states we hold a source of their own for), the bridge states in Schleswig-Holstein and the Deutscher Wetterdienst (warnings, road weather).
- No colour from: detours, border crossings, lorry networks, parking and charging. A state with no current police source of its own keeps the light at yellow.
Traffic light for the A39
Yellow — Roadworks narrowing the road · km 136.50 → km 147.50
For your choice on the A39.
- Roadworks narrowing the road · km 136.50 → km 147.50 · Verkehrsdaten: Autobahn GmbH des Bundes
How the traffic light is set
- Red for a full closure of the carriageway, a wrong-way driver, objects, people or animals on the road, an accident with a closure, a weather warning of level 3–4 or a jam with a delay of 30 minutes or more.
- Yellow for a shorter jam, roadworks narrowing the road, another traffic warning, a weather warning of level 1–2, slippery roads in the road-weather forecast, a closed entry or exit — or when a source is missing or out of date.
- Green only when none of this is reported and the Autobahn GmbH reports, the Deutscher Wetterdienst warnings and, for every state in the area, a police source of its own are current. Green is no guarantee of a clear road.
- With your position, everything within the chosen radius along the motorway that lies ahead of you in the chosen direction counts; what lies behind you or on the other carriageway does not. More than 2.0 km away from the motorway, it is counted from the nearest junction.
- Read: the Autobahn GmbH (closures, jams, traffic warnings, roadworks), police and state traffic messages (for the states we hold a source of their own for), the bridge states in Schleswig-Holstein and the Deutscher Wetterdienst (warnings, road weather).
- No colour from: detours, border crossings, lorry networks, parking and charging. A state with no current police source of its own keeps the light at yellow.
All data: 18 entries
The traffic light still judges everything – some of its reasons are hidden right now.
Reported now
5 closures · 0 jams · 10 roadworks live ·
By direction
- Braunschweig → Salzgitter: 0 closures · 0 jams · 1 roadworks
- Braunschweig → Wolfsburg: 0 closures · 0 jams · 1 roadworks
- Hamburg → Lüneburg: 0 closures · 0 jams · 1 roadworks
- km 136.50 → km 147.50: 0 closures · 0 jams · 1 roadworks
- km 147.50 → km 136.50: 0 closures · 0 jams · 1 roadworks
- km 34.50 → km 35.20: 0 closures · 0 jams · 1 roadworks
- km 35.20 → km 34.50: 0 closures · 0 jams · 1 roadworks
- Lüneburg → Hamburg: 0 closures · 0 jams · 1 roadworks
- Salzgitter → Braunschweig: 0 closures · 0 jams · 2 roadworks
- Wolfsburg → Braunschweig: 1 closure · 0 jams · 1 roadworks
- no direction given: 5 closures · 0 jams · 1 roadworks
Today, hour by hour
08:00–09:00 · jams: 2
- A39 | Wolfsburg-Mörse-Nord - Wolfsburg-West (Braunschweig -> Wolfsburg)
- A39 | Wolfsburg-Mörse-Süd - Wolfsburg-West (Braunschweig -> Wolfsburg)
Shown: from Flechtorf junction to Flechtorf junction
Map
- Junction or interchange
- Streets (OpenStreetMap)
- Charging station
As of 09:20
Schematic: the line joins the points of the Location Code List in their order – not to scale, not a navigation map. Where the list has a gap, the line breaks too.
- Broken between Weyhausen junction and Lüneburg-Nord junction: the Location Code List gives no course in between, so we draw no line there.
Map sources
TMC Location Code List (LCL 22.0): Bundesanstalt für Straßenwesen (BASt), CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/), bearbeitet · licence text
Ladesäulenregister: Bundesnetzagentur.de, CC BY 4.0, bearbeitet · licence text
Ladepunkte: Eco-Movement via Mobilithek, CC BY 4.0, bearbeitet · licence text
Ladepunkte: Hamburger Energienetze GmbH (eRound) via Mobilithek, CC0 1.0
Grenzen: © BKG (2026) dl-de/by-2-0, Datenquellen: https://sgx.geodatenzentrum.de/web_public/gdz/datenquellen/datenquellen_vg_nuts.pdf (Daten verändert)
Streets: © OpenStreetMap contributors, ODbL 1.0 · licence text
The streets come from our street database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Closures, jams and roadworks on the A39
Roadworks
1 entrylive ·show 1 roadworks
- at Weyhausen junction (21) · near Wolfsburg · Lower Saxony (placed by ViaFrei)both directionsMon, 6 Jan 2025, 00:00 – Fri, 1 Jan 2027, 00:00 · in force now, ends in 43 daysRestriction unknownworks on a structure (bridge, tunnel)Map 1 · Google Maps · Map 2 · Google Maps2 identical reports
Charging
4 entrieslive · (sources: EnBW AG 03:54, Eco-Movement 18 Nov, 21:59, Tesla Germany GmbH 03:44, Volkswagen Group Charging GmbH 18 Nov, 21:49, e-clearing.net (smartlab Innovationsgesellschaft mbH) 03:54, 800 Volt Technologies GmbH (PUMP) 18 Nov, 15:05, Ampeco Ltd 18 Nov, 10:58, Audi AG (Audi charging hub) 18 Nov, 15:06, ENIO GmbH 18 Nov, 15:06, EW Pricing GmbH (EV Price) 18 Nov, 15:08, EWE 18 Nov, 15:04, GLS Mobility GmbH 18 Nov, 15:17, GP JOULE Connect GmbH 18 Nov, 15:18, Grid & Co 18 Nov, 15:19, Hamburger Energienetze GmbH (eRound) 18 Nov, 10:59, INERGIA GmbH 18 Nov, 15:19, K.u.L 18 Nov, 11:02, LichtBlick eMobility GmbH 18 Nov, 11:41, Monta ApS 18 Nov, 15:20, Qwello Deutschland GmbH 18 Nov, 15:20, Road B.V 18 Nov, 15:20, SMATRICS GmbH & Co KG 18 Nov, 15:21, Wirelane GmbH 18 Nov, 15:11, chargecloud GmbH 18 Nov, 11:42, vaylens GmbH 18 Nov, 11:45, Taubert Consulting GmbH (TC-Backend) 18 Nov, 15:24, ELU Mobility 18 Nov, 15:25, Chargepool Enerando Technologies GmbH 18 Nov, 15:25, eliso GmbH 18 Nov, 14:54, chargecloud (CC0 1.0) 08:25, Taubert Consulting (CC0 1.0) 08:25, ENERANDO Technologies GmbH 09:14, Freie und Hansestadt Hamburg 09:24 · not answering: 2)stale · Audi AG (Audi charging hub) · stale · Bundesnetzagentur.de ·Charging stations within 600 m of the junctions and service areas. Charging stations read 09:25; each point's status with its own time.
- Kaufland 4863_Kland_Wolfsburg_T65-IT1-0723-069 Brandgehaege 9, Wolfsburg at Flechtorf junction · Map · Google Mapsup to 365 kW HPC 11 charge pointsno status data
- up to 350 kW HPC 11 charge pointsoccupied, 9 with status from 18 Nov, 14:13 (possibly out of date), 1 without status (as of 09:15)
- up to 150 kW HPC 6 charge pointsno status data
- Pfalzwerke Ladestation (HORNBACH) Brandgehaege 7, Wolfsburg at Flechtorf junction · Map · Google Mapsup to 150 kW HPC 6 charge pointsstatus from 18 Nov, 23:52 — possibly out of date
Only a few operators publish live occupancy; “no status data” means unknown, not free.
Data: Bundesnetzagentur.de, Eco-Movement, Hamburger Energienetze GmbH
Sources and licences
Ladesäulenregister: Bundesnetzagentur.de, CC BY 4.0, bearbeitet · licence text
Ladepunkte: Eco-Movement via Mobilithek, CC BY 4.0, bearbeitet · licence text
Ladepunkt-Verfügbarkeit: Eco-Movement via Mobilithek, CC BY 4.0, bearbeitet · licence text
Ladepunkt-Verfügbarkeit: Hamburger Energienetze GmbH (eRound) via Mobilithek, CC0 1.0
Ladepunkte: Hamburger Energienetze GmbH (eRound) via Mobilithek, CC0 1.0
Fuel
prices on requestLoading the prices needs JavaScript on this page.
Loading prices …
The prices cannot be fetched right now.
Towns along the route
13 entriesreference data ·- Salzgitter large city · exit Salzgitter-Lebenstedt-Süd junction (41), 2.2 km to the town · Website · Map · Google Mapson A39, A36, A7 · traffic light there: Yellow
- Wolfenbüttel medium-sized town · exit BS-Rüningen-Süd junction (37), 6.1 km to the town · Website · Map · Google Mapson A36, A39 · traffic light there: Green
- Braunschweig large city · exit Braunschweig-Südstadt junction (33), 2.9 km to the town · Website · Map · Google Mapson A391, A392, A39, A36, A2 · traffic light there: Yellow
- Wolfsburg large city · exit Wolfsburg-West junction (23), 3.2 km to the town · Website · Map · Google Mapson A39, A2 · traffic light there: Red
- Lüneburg medium-sized town · exit Lüneburg-Nord junction (6), 3.2 km to the town · Map · Google Mapson A39 · traffic light there: Yellow
- Winsen (Luhe) medium-sized town · exit Winsen-Ost junction (4), 2.8 km to the town · Website · Map · Google Mapson A39 · traffic light there: Yellow
- Seevetal medium-sized town · exit Seevetal-Maschen junction (2), 1.4 km to the town · Website · Map · Google Mapson A39, A1, A7 · traffic light there: Yellow
- Holle · exit Baddeckenstedt junction (44), 2.6 km to the town · Website · Map · Google Mapson A7, A39 · traffic light there: Yellow
- Burgdorf · exit Westerlinde junction (43), 2.9 km to the town · Website · Map · Google Mapson A39 · traffic light there: Yellow
- Cremlingen · exit Cremlingen junction (30), 800 m to the town · Map · Google Mapson A39 · traffic light there: Green
- Weyhausen · exit Weyhausen junction (21), 1.5 km to the town · Map · Google Mapson A39 · traffic light there: Yellow
- Tappenbeck · exit Weyhausen junction (21), 1.5 km to the town · Map · Google Mapson A39 · traffic light there: Yellow
- Bardowick · exit Lüneburg-Nord junction (6), 1.8 km to the town · Map · Google Mapson A39 · traffic light there: Yellow
Municipalities within 15 km (large city), 8.0 km (medium-sized town) or 3.0 km (others) in a straight line of an exit, each listed once at its nearest exit.
Nothing reported:
Closures
none
Jams
none
Weather warnings (DWD)
No official warning along the motorway.
Planned closures
Planned full closures, next 7 days
Autobahn GmbH announces no full closure in this stretch for the next 7 days (as of 09:20); for the whole motorway, clear the selection.
Interchanges and connected motorways
Detours
Signed detours are shown here for North Rhine-Westphalia, Baden-Württemberg and Hamburg. We also hold Schleswig-Holstein's detour routes, but they are not tied to a motorway. Detours give the traffic light no colour.
Police and Land messages
No police or state traffic message on the A39 in the sources we read.
We read current police and state traffic messages here for: Lower Saxony.
Parking
We hold no car park here.
Bridges
We hold bridge states for Schleswig-Holstein only (three bridges); elsewhere the traffic light says nothing about bridges.
Border crossings
Border crossings: Brandenburg only — with no word on whether a crossing is open or how long the wait is.
Some stretches are described in German only; the German page shows them.
Route
reference data · data as of LCL 22.0
From Salzgitter interchange to Maschener Kreuz/A7 · 32 junctions and interchanges
about 96 km along the points of the Location Code List (schematic)
Through Lower Saxony (state by the nearest municipality of each junction)
Junction strip
The junctions in their order, with what is reported at each.
- from here Lower Saxony 27 Flechtorf junction charging · Map · Google Maps
On every motorway
Lorry driving ban
On Sundays and public holidays, lorries over 7.5 t and lorries with trailers may not drive between 00:00 and 22:00. (§ 30 Abs. 3 StVO)
Next ban day: Sunday 22 November.
The motorway's states by the nearest municipality of each junction. Holidays per § 30 Abs. 4 StVO, reviewed 8 October 2026 · Informational, not legal advice.
- On the Autobahn there is no general speed limit where no sign says otherwise; the advisory speed is 130 km/h. Drive faster and you can share liability in a crash. (Autobahn-Richtgeschwindigkeits-V)
- Rescue lane: as soon as traffic slows on a motorway or rural road with at least two lanes per direction, keep a lane free between the leftmost lane and the one beside it — immediately, not once the blue lights arrive. (§ 11 Abs. 2 StVO)
- 112 reaches ambulance and fire service (Europe-wide), 110 the police — free from any network, credit or not. (Notrufverordnung (NotrufV))
Reviewed 19 September 2026 · Informational, not legal advice.