Beta ViaFrei is in beta: answers and coverage can change, and the AI can make mistakes. Please check important details with the source named. What this means
A281 motorway now
The A281 runs from Neuenlander Ring to Bremen-Industriehäfen interchange, about 11 km long (schematic), through Bremen and Lower Saxony, with 8 junctions and interchanges (1 of them an interchange); its course is broken between HB-Seehausen junction and Bremen-Burg-Grambke junction. Reported on the A281 now: 3 closures, 0 jams, 1 roadworks (as of 09:15).
Reported now
3 closures · 0 jams · 1 roadworks · as of 09:15
By direction
- Airport-Stadt → Neustädter Hafen: 0 closures · 0 jams · 1 roadworks
- Neustädter Hafen → Airport-Stadt: 1 closure · 0 jams · 0 roadworks
- no direction given: 2 closures · 0 jams · 0 roadworks
Map
- Junction or interchange
- Closure
- Roadworks
- Charging station
Schematic: the line joins the points of the Location Code List in their order – not to scale, not a navigation map. Where the list has a gap, the line breaks too.
- Broken between HB-Seehausen junction and Bremen-Burg-Grambke junction: the Location Code List gives no course in between, so we draw no line there.
Map sources
Kartengrundlage: © BKG (2026) dl-de/by-2-0, Datenquellen: https://sgx.geodatenzentrum.de/web_public/gdz/datenquellen/datenquellen_vg_nuts.pdf (Daten verändert)
TMC Location Code List (LCL 22.0): Bundesanstalt für Straßenwesen (BASt), CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/), bearbeitet · licence text
Ladepunkte: Eco-Movement via Mobilithek, CC BY 4.0, bearbeitet · licence text
Ladepunkte: Volkswagen Group Charging GmbH via Mobilithek, CC0 1.0
Ladesäulenregister: Bundesnetzagentur.de, CC BY 4.0, bearbeitet · licence text
Closures, jams and roadworks on the A281
Closures
- Closure · Bremen-Strom - Bremen-Airportstadt · Neustädter Hafen → Airport-Stadt · Map
- Closure · Map · 2 identical reports
Jams
none
Roadworks
- Roadworks · Bremen-Strom - HB-Seehausen · Airport-Stadt → Neustädter Hafen · Map
Planned full closures, next 7 days
Autobahn GmbH announces no full closure on this motorway for the next 7 days (as of 09:15).
Some stretches are described in German only; the German page shows them.
Route
From Neuenlander Ring to Bremen-Industriehäfen interchange · 8 junctions and interchanges
about 11 km along the points of the Location Code List (schematic)
Through Bremen, Lower Saxony (state by the nearest municipality of each junction)
Junction strip
The junctions in their order, with what is reported at each.
- Neuenlander Ring parking · charging
- 7 Bremen-Airportstadt junction parking · charging
- 6 Bremen-Neustadt junction 1 closure · parking · charging
- 5 Bremen-Neustädter Hafen junction 1 closure · parking
- 4 Bremen-Strom junction
- 3 HB-Seehausen junction 1 roadworks
- Bremen-Burg-Grambke junction parking · charging
- 17 Bremen-Industriehäfen interchange meets A27
Places on the A281
Parking and rest
More car parks mapped by OpenStreetMap
- Parkhaus 1 · at Neuenlander Ring · 800 m
- Parkhaus 2 · at Neuenlander Ring · 850 m
- Sonneneck · at Neuenlander Ring · 450 m
- Parkhaus 1 · at Bremen-Airportstadt junction · 500 m
- Parkhaus 2 · at Bremen-Airportstadt junction · 500 m
- Parkhaus Süd · at Bremen-Airportstadt junction · 450 m
- REWE-Parkplatz · at Bremen-Neustadt junction · 1.0 km
- MOBI 1 Am Tabakquartier 4 · at Bremen-Neustädter Hafen junction · 900 m
- MOBI 2 Senator-Apelt-Straße 51a · at Bremen-Neustädter Hafen junction · 950 m
- Kundenparkplatz Nehlsen · at Bremen-Burg-Grambke junction · 800 m
OSM-Standortdaten: © OpenStreetMap-Mitwirkende, ODbL 1.0 · licence text
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Charging
Charging stations within 600 m of the junctions and service areas. Charging stations read 09:06; each point's status with its own time.
- mvb plants worldwide · 1 charge point · up to 13 kW · no status data · at Neuenlander Ring
- PI - Airbus Bremen (Gekühlt) · 8 charge points · up to 225 kW · status from 19 Oct, 14:28 — possibly out of date, 1 without status · at Bremen-Airportstadt junction
- August-Dubbers-Straße 1 Bremen · 4 charge points · up to 11 kW · status from 01:01 — possibly out of date, 1 without status · at Bremen-Neustadt junction
- Parkplatz Verkauf · 2 charge points · no status data · at Bremen-Neustadt junction
- Hoyer · 2 charge points · up to 11 kW · no status data · at Bremen-Burg-Grambke junction
Only a few operators publish live occupancy; “no status data” means unknown, not free.
Fast charging from 150 kW and power classes
Longest stretch without a charging site of 150 kW or more: from Bremen-Airportstadt junction to Bremen-Industriehäfen interchange, about 10 km (schematic).
By power: under 50 kW: 3 · 150 kW and up: 1 · not stated: 1.
Our count of the sites above (within the distance named from a junction or service area) – whether one is free, the list says.
Ladesäulenregister: Bundesnetzagentur.de, CC BY 4.0, bearbeitet · licence text
Ladepunkte: Eco-Movement via Mobilithek, CC BY 4.0, bearbeitet · licence text
Ladepunkt-Verfügbarkeit: Eco-Movement via Mobilithek, CC BY 4.0, bearbeitet · licence text
Ladepunkt-Verfügbarkeit: Monta ApS via Mobilithek, CC0 1.0
Ladepunkte: Monta ApS via Mobilithek, Open Data (freie Nutzung)
Ladepunkte: Volkswagen Group Charging GmbH via Mobilithek, CC0 1.0
Weather along the motorway
Official warnings of the Deutscher Wetterdienst
No official warning along the motorway.
Fuel prices
We load the prices of the filling stations along the motorway only when you ask for them. Loading the prices needs JavaScript on this page.
Loading prices …
The prices cannot be fetched right now.
On every motorway
Lorry driving ban
On Sundays and public holidays, lorries over 7.5 t and lorries with trailers may not drive between 00:00 and 22:00. (§ 30 Abs. 3 StVO)
Next ban day: Sunday 25 October.
The motorway's states by the nearest municipality of each junction. Holidays per § 30 Abs. 4 StVO, reviewed 8 October 2026 · Informational, not legal advice.
- On the Autobahn there is no general speed limit where no sign says otherwise; the advisory speed is 130 km/h. Drive faster and you can share liability in a crash. (Autobahn-Richtgeschwindigkeits-V)
- Rescue lane: as soon as traffic slows on a motorway or rural road with at least two lanes per direction, keep a lane free between the leftmost lane and the one beside it — immediately, not once the blue lights arrive. (§ 11 Abs. 2 StVO)
- 112 reaches ambulance and fire service (Europe-wide), 110 the police — free from any network, credit or not. (Notrufverordnung (NotrufV))
Reviewed 19 September 2026 · Informational, not legal advice.