ViaFrei Transport data, spoken Connect
Connect in one minute

Beta ViaFrei is in beta: answers and coverage can change, and the AI can make mistakes. Please check important details with the source named. What this means

A15 motorway now

The A15 runs from Spreewald interchange to Bademeusel junction, about 63 km long (schematic), through Brandenburg, with 8 junctions and interchanges (1 of them an interchange). Reported on the A15 now: 0 closures, 0 jams, 8 roadworks (as of 09:15).

Reported now

0 closures · 0 jams · 8 roadworks · as of 09:15

By direction

  • Breslau → Cottbus: 0 closures · 0 jams · 3 roadworks
  • Breslau → Dreieck Spreewald: 0 closures · 0 jams · 1 roadworks
  • Cottbus → Breslau: 0 closures · 0 jams · 3 roadworks
  • Cottbus → Dreieck Spreewald: 0 closures · 0 jams · 1 roadworks
Stretch and direction

Direction:

Show:

Whole motorway

Map

Schematic map of the A15The A15 from Spreewald to Bademeusel, drawn schematically through its junctions, with the reported closures, roadworks and jams.
  • Junction or interchange
  • Roadworks
  • Service area or lorry park
  • Charging station

Schematic: the line joins the points of the Location Code List in their order – not to scale, not a navigation map. Where the list has a gap, the line breaks too.

Closures, jams and roadworks on the A15

Closures

none

Jams

none

Roadworks

  • Roadworks · Boblitz - Spreewald · Cottbus → Dreieck Spreewald · Map
  • Roadworks · Cottbus-Süd - Dubje · Breslau → Dreieck Spreewald · Map
  • Roadworks · Cottbus-Süd - Forst · Cottbus → Breslau · Map · 2 identical reports
  • Roadworks · Forst - Cottbus-Süd · Breslau → Cottbus · Map · 2 identical reports
  • Roadworks · Forst - Roggosen · Breslau → Cottbus · Map
  • Roadworks · Roggosen - Forst · Cottbus → Breslau · Map

Planned full closures, next 7 days

Autobahn GmbH announces no full closure on this motorway for the next 7 days (as of 09:15).

Route

From Spreewald interchange to Bademeusel junction · 8 junctions and interchanges

about 63 km along the points of the Location Code List (schematic)

Through Brandenburg (state by the nearest municipality of each junction)

Junction strip

The junctions in their order, with what is reported at each.

  1. 1 Spreewald interchange meets A13
  2. 2 Boblitz junction 1 roadworks · parking
  3. 3 Vetschau junction parking · charging
  4. 4 Cottbus-West junction 1 roadworks
  5. 5 Cottbus-Süd junction parking · charging
  6. 6 Roggosen junction 2 roadworks
  7. 7 Forst junction 2 roadworks · parking
  8. 8 Bademeusel junction

Places on the A15

Parking and rest

Lorry parks and service areas

  • Lorry parking · Belten · 57 spaces · 20 lorry spaces · at Boblitz junction
  • Lorry parking · Leipe · 57 spaces · 20 lorry spaces · at Boblitz junction
  • Lorry parking · Dubje · 54 spaces · 20 lorry spaces · at Vetschau junction
  • Lorry parking · Eichower Fließ · 57 spaces · 20 lorry spaces · at Vetschau junction
  • Lorry parking · 3 lorry spaces · at Forst junction

Verkehrsdaten: Autobahn GmbH des Bundes

LKW-Parken: © Lkw-Parken BAB Deutschland / Bundesministerium für Verkehr (BMV) 2026 — GeoNutzV, Daten verändert

More car parks mapped by OpenStreetMap

  • Madlow Umsteigehaltestelle (P+R) · at Cottbus-Süd junction · 550 m

OSM-Standortdaten: © OpenStreetMap-Mitwirkende, ODbL 1.0 · licence text

These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.

Charging

Charging stations within 600 m of the junctions and service areas. Charging stations read 09:14; each point's status with its own time.

  • Circle K I Vetschau Berliner Str. 23 · 14 charge points · up to 175 kW · status from 20 Oct, 12:57 — possibly out of date, 6 without status · at Vetschau junction
  • Cottbus, Germany · 12 charge points · up to 250 kW · status from 16 Oct, 10:00 — possibly out of date, 9 without status · at Cottbus-Süd junction

Only a few operators publish live occupancy; “no status data” means unknown, not free.

Fast charging from 150 kW and power classes

Longest stretch without a charging site of 150 kW or more: from Cottbus-Süd junction to Bademeusel junction, about 28 km (schematic).

By power: 150 kW and up: 2.

Our count of the sites above (within the distance named from a junction or service area) – whether one is free, the list says.

Ladepunkte: Eco-Movement via Mobilithek, CC BY 4.0, bearbeitet · licence text

Ladepunkt-Verfügbarkeit: Eco-Movement via Mobilithek, CC BY 4.0, bearbeitet · licence text

Ladepunkt-Verfügbarkeit: Tesla Germany GmbH via Mobilithek, CC0 1.0

Ladepunkte: Tesla Germany GmbH via Mobilithek, CC0 1.0

Weather along the motorway

Official warnings of the Deutscher Wetterdienst

No official warning along the motorway.

Fuel prices

We load the prices of the filling stations along the motorway only when you ask for them. Loading the prices needs JavaScript on this page.

On every motorway

Lorry driving ban

On Sundays and public holidays, lorries over 7.5 t and lorries with trailers may not drive between 00:00 and 22:00. (§ 30 Abs. 3 StVO)

Next ban day: Sunday 25 October.

The motorway's states by the nearest municipality of each junction. Holidays per § 30 Abs. 4 StVO, reviewed 8 October 2026 · Informational, not legal advice.

  • On the Autobahn there is no general speed limit where no sign says otherwise; the advisory speed is 130 km/h. Drive faster and you can share liability in a crash. (Autobahn-Richtgeschwindigkeits-V)
  • Rescue lane: as soon as traffic slows on a motorway or rural road with at least two lanes per direction, keep a lane free between the leftmost lane and the one beside it — immediately, not once the blue lights arrive. (§ 11 Abs. 2 StVO)
  • 112 reaches ambulance and fire service (Europe-wide), 110 the police — free from any network, credit or not. (Notrufverordnung (NotrufV))

Reviewed 19 September 2026 · Informational, not legal advice.

All motorways