ViaFrei Transport data, spoken Connect
Ready in one minute

Beta ViaFrei is in beta: answers and coverage can change, and the AI can make mistakes. Please check important details with the source named. What this means

A643 motorway now

The A643 runs from Mainz interchange to Anschluss Schiersteiner Straße junction, about 8.3 km long (schematic), through Rhineland-Palatinate and Hesse, with 7 junctions and interchanges (2 of them interchanges). Reported on the A643 now: 1 closure, 0 jams, 4 roadworks (as of 06:54).

Reported now

1 closure · 0 jams · 4 roadworks · as of 06:54

By direction

  • Mainz → Wiesbaden: 0 closures · 0 jams · 1 roadworks
  • Wiesbaden → Mainz: 0 closures · 0 jams · 1 roadworks
  • no direction given: 1 closure · 0 jams · 2 roadworks
Stretch and direction

Direction:

Show:

Whole motorway

Map

Schematic map of the A643The A643 from Mainz to Anschluss Schiersteiner Straße, drawn schematically through its junctions, with the reported closures, roadworks and jams.
  • Junction or interchange
  • Closure
  • Roadworks
  • Charging station
  • Road-weather station

Schematic: the line joins the points of the Location Code List in their order – not to scale, not a navigation map. Where the list has a gap, the line breaks too.

Closures, jams and roadworks on the A643

Closures

Jams

none

Roadworks

  • Roadworks · Schiersteiner Kreuz - Wiesbaden-Äppelallee · Wiesbaden → Mainz · Map
  • Roadworks · Wiesbaden-Äppelallee - Schiersteiner Kreuz · Mainz → Wiesbaden · Map
  • Roadworks · Map
  • Roadworks · Map

Planned full closures, next 7 days

Autobahn GmbH announces no full closure on this motorway for the next 7 days (as of 06:54).

Some stretches are described in German only; the German page shows them.

Route

From Mainz interchange to Anschluss Schiersteiner Straße junction · 7 junctions and interchanges

about 8.3 km along the points of the Location Code List (schematic)

Through Rhineland-Palatinate, Hesse (state by the nearest municipality of each junction)

Junction strip

The junctions in their order, with what is reported at each.

  1. 18 Mainz interchange meets A60 charging · road weather
  2. Mainz-Gonsenheim junction
  3. Mainz-Mombach junction 1 closure · 1 roadworks
  4. Wiesbaden-Äppelallee junction 1 roadworks · parking · charging · road weather
  5. 3 Schiersteiner Kreuz interchange meets A66 2 roadworks · charging
  6. Wiesbaden-Dotzheim junction parking
  7. Anschluss Schiersteiner Straße junction charging

Places on the A643

Parking and rest

More car parks mapped by OpenStreetMap

  • Hinterer Schulparkplatz Waldorfschule · at Wiesbaden-Äppelallee junction · 800 m
  • Asklepios Gesundheitszentrum · at Wiesbaden-Dotzheim junction · 800 m
  • Höco · at Wiesbaden-Dotzheim junction · 550 m
  • VHS · at Wiesbaden-Dotzheim junction · 800 m

OSM-Standortdaten: © OpenStreetMap-Mitwirkende, ODbL 1.0 · licence text

These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.

Charging

Charging stations within 600 m of the junctions and service areas. Charging stations read 03:53; each point's status with its own time.

  • Mainz- Sertoriusring 100 · 2 charge points · up to 22 kW · status from 03:24 — possibly out of date · at Mainz interchange
  • Mainzer Stadtwerke AG · 2 charge points · up to 22 kW · no status data · at Mainz interchange
  • ENBW · 5 charge points · up to 300 kW · status from 01:00 — possibly out of date · at Wiesbaden-Äppelallee junction
  • RINK Niederlassung Wiesbaden · 1 charge point · up to 22 kW · status from 03:42 — possibly out of date · at Schiersteiner Kreuz interchange
  • Wörther-See-Straße · 2 charge points · up to 22 kW · no status data · at Schiersteiner Kreuz interchange
  • Dostojewskistraße · 2 charge points · up to 22 kW · no status data · at Anschluss Schiersteiner Straße junction
  • Jägerstraße · 2 charge points · up to 22 kW · no status data · at Anschluss Schiersteiner Straße junction

Only a few operators publish live occupancy; “no status data” means unknown, not free.

Fast charging from 150 kW and power classes

Longest stretch without a charging site of 150 kW or more: from Mainz interchange to Wiesbaden-Äppelallee junction, about 5.8 km (schematic).

By power: under 50 kW: 6 · 150 kW and up: 1.

Our count of the sites above (within the distance named from a junction or service area) – whether one is free, the list says.

Ladepunkte: chargecloud GmbH via Mobilithek, CC0 1.0

Ladepunkt-Verfügbarkeit: EnBW AG via Mobilithek, CC BY 4.0, bearbeitet · licence text

Ladepunkte: EnBW AG via Mobilithek, CC BY 4.0, bearbeitet · licence text

Ladepunkt-Verfügbarkeit: Hamburger Energienetze GmbH (eRound) via Mobilithek, CC0 1.0

Ladepunkte: Hamburger Energienetze GmbH (eRound) via Mobilithek, CC0 1.0

Ladepunkte: Smartlab Innovationsgesellschaft mbH (ladenetz.de) via Mobilithek, CC0 1.0

Ladepunkte: vaylens GmbH via Mobilithek, CC0 1.0

Ladepunkte und Verfügbarkeit: chargecloud (CC0 1.0) via MobiData BW (NVBW), Datenlizenz Deutschland – Namensnennung – Version 2.0 (www.govdata.de/dl-de/by-2-0), Daten geändert · licence text

Weather along the motorway

Official warnings of the Deutscher Wetterdienst

No official warning along the motorway.

Road-surface forecast

DWD road-surface forecast for the nearest road-weather stations — a model forecast (run 06:00), not a measurement and not an official warning

  • AD Mainz · at Mainz interchange · 07:00: dry, road surface 10.4 °C
  • Schiersteiner Bruecke · at Wiesbaden-Äppelallee junction · 07:00: dry, road surface 10.5 °C

Each line is for the station's own location, not for the whole road.

Quelle: Deutscher Wetterdienst. Datenquelle: BMVBS und Straßenbauverwaltungen der Länder · licence text Die Daten der Glättemeldeanlagen stellen ungeprüfte Punktmessungen dar und spiegeln nicht die Verhältnisse auf einem Straßenabschnitt wider. Es besteht kein Anspruch auf regelmäßige und vollständige Datenlieferungen.

Fuel prices

We load the prices of the filling stations along the motorway only when you ask for them. Loading the prices needs JavaScript on this page.

On every motorway

Lorry driving ban

On Sundays and public holidays, lorries over 7.5 t and lorries with trailers may not drive between 00:00 and 22:00. (§ 30 Abs. 3 StVO)

Next ban day: Sunday 18 October.

The motorway's states by the nearest municipality of each junction. Holidays per § 30 Abs. 4 StVO, reviewed 8 October 2026 · Informational, not legal advice.

  • On the Autobahn there is no general speed limit where no sign says otherwise; the advisory speed is 130 km/h. Drive faster and you can share liability in a crash. (Autobahn-Richtgeschwindigkeits-V)
  • Rescue lane: as soon as traffic slows on a motorway or rural road with at least two lanes per direction, keep a lane free between the leftmost lane and the one beside it — immediately, not once the blue lights arrive. (§ 11 Abs. 2 StVO)
  • 112 reaches ambulance and fire service (Europe-wide), 110 the police — free from any network, credit or not. (Notrufverordnung (NotrufV))

Reviewed 19 September 2026 · Informational, not legal advice.

All motorways