ViaFrei Transport data, spoken Connect
Ready in one minute

Beta ViaFrei is in beta: answers and coverage can change, and the AI can make mistakes. Please check important details with the source named. What this means

A565 motorway now

The A565 runs from Anschluss B257 to Bonn-Nordost interchange, about 25 km long (schematic), through North Rhine-Westphalia, with 14 junctions and interchanges (3 of them interchanges). Reported on the A565 now: 7 closures, 0 jams, 17 roadworks (as of 06:54).

Reported now

7 closures · 0 jams · 17 roadworks · as of 06:54

By direction

  • Bonn → Meckenheim: 1 closure · 0 jams · 7 roadworks
  • Meckenheim → Bonn: 1 closure · 0 jams · 8 roadworks
  • no direction given: 5 closures · 0 jams · 2 roadworks
Stretch and direction

Direction:

Show:

Whole motorway

Map

Schematic map of the A565The A565 from Anschluss B257 to Bonn-Nordost, drawn schematically through its junctions, with the reported closures, roadworks and jams.
  • Junction or interchange
  • Closure
  • Roadworks
  • Service area or lorry park
  • Charging station

Schematic: the line joins the points of the Location Code List in their order – not to scale, not a navigation map. Where the list has a gap, the line breaks too.

Closures, jams and roadworks on the A565

Closures

  • Closure · Bonn-Beuel - Bonn-Auerberg · Bonn → Meckenheim · Map
  • Closure · Bonn-Nord - Bonn-Beuel · Meckenheim → Bonn · Map
  • Closure · Map
  • Closure · Map
  • Closure · Map · 3 identical reports

Jams

none

Roadworks

  • Roadworks · Bonn-Hardtberg - Bonn-Lengsdorf · Meckenheim → Bonn · Map
  • Roadworks · Bonn-Hardtberg - Meckenheim-Nord · Bonn → Meckenheim · Map
  • Roadworks · Bonn-Hardtberg - Merl · Bonn → Meckenheim · Map
  • Roadworks · Bonn-Lengsdorf - Bonn-Endenich · Meckenheim → Bonn · Map · 2 identical reports
  • Roadworks · Bonn-Lengsdorf - Bonn-Hardtberg · Bonn → Meckenheim · Map
  • Roadworks · Bonn-Lengsdorf - Meckenheim-Nord · Bonn → Meckenheim · Map
  • Roadworks · Bonn-Poppelsdorf - Bonn-Hardtberg · Bonn → Meckenheim · Map
  • Roadworks · Bonn-Poppelsdorf - Bonn-Tannenbusch · Meckenheim → Bonn · Map
  • Roadworks · Bonn-Tannenbusch - Bonn-Endenich · Bonn → Meckenheim · Map
  • Roadworks · Bonn-Tannenbusch - Bonn-Poppelsdorf · Bonn → Meckenheim · Map
  • Roadworks · Meckenheim - Meckenheim-Nord · Meckenheim → Bonn · Map
  • Roadworks · Meckenheim-Nord - Bonn-Lengsdorf · Meckenheim → Bonn · Map
  • Roadworks · Merl - Bonn-Hardtberg · Meckenheim → Bonn · Map
  • Roadworks · Map · 2 identical reports
  • Roadworks · Map

Planned full closures, next 7 days

Autobahn GmbH announces no full closure on this motorway for the next 7 days (as of 06:54).

Some stretches are described in German only; the German page shows them.

Route

From Anschluss B257 to Bonn-Nordost interchange · 14 junctions and interchanges

about 25 km along the points of the Location Code List (schematic)

Through North Rhine-Westphalia (state by the nearest municipality of each junction)

Junction strip

The junctions in their order, with what is reported at each.

  1. 14 Anschluss B257 parking
  2. 13 Grafschaft junction
  3. 12 Meckenheim interchange meets A61 parking
  4. 11 Merl junction 3 roadworks · parking · charging
  5. 10 Meckenheim-Nord junction 1 closure · parking
  6. 9 Bonn-Hardtberg junction 5 roadworks · parking · charging
  7. 8 Bonn-Lengsdorf junction 2 roadworks · charging
  8. 7 Bonn-Poppelsdorf junction 1 roadworks · parking · charging
  9. 6 Bonn-Endenich junction 1 closure · 2 roadworks · parking · charging
  10. 5 Bonn-Tannenbusch junction 1 roadworks · parking · charging
  11. 4 Bonn-Nord interchange meets A555 1 roadworks
  12. 3 Bonn-Auerberg junction 1 closure · parking · charging
  13. 2 Bonn-Beuel junction 2 closures · parking
  14. 1 Bonn-Nordost interchange meets A59

Places on the A565

Parking and rest

Lorry parks and service areas

  • Lorry parking · Swistbach · at Meckenheim interchange

LKW-Parken: © Lkw-Parken BAB Deutschland / Bundesministerium für Verkehr (BMV) 2026 — GeoNutzV, Daten verändert

P+R sites from P+R NRW (CC BY-SA), held separately — not cross-checked with the entries above

  • Park and ride · Tannenbusch-Süd · occupancy not carried by us · 1.1 km · Map
  • Park and ride · Park & Ride Siegaue · occupancy not carried by us · 350 m · Map
  • Park and ride · Vilich (U-Bahn) · occupancy not carried by us · 1.5 km · Map

P+R NRW: NRW.Mobidrom via Mobilithek, Datensatz „Gebündelte Daten Park+Ride NRW“, CC BY-SA, bearbeitet · licence text

The P+R NRW entries are licensed CC BY-SA (share-alike) by their source: anyone who passes them on, or builds something on them, must release the result under the same licence and with this attribution. We release our adaptation under CC BY-SA 4.0

More car parks mapped by OpenStreetMap

  • Schloss Gelsdorf · at Anschluss B257 · 550 m
  • Dorfplatz · at Merl junction · 450 m
  • Drei Steine · at Merl junction · 550 m
  • Bahnhofsweg · at Meckenheim-Nord junction · 750 m
  • Jägerhäuschen · at Meckenheim-Nord junction · 800 m
  • Aldi Süd · at Bonn-Hardtberg junction · 550 m
  • Dorfplatz Lengsdorf · at Bonn-Hardtberg junction · 750 m
  • Werkstatt · at Bonn-Hardtberg junction · 450 m
  • BonnNetz Parkhaus · at Bonn-Poppelsdorf junction · 900 m
  • Parkhaus Alte Bushalle · at Bonn-Poppelsdorf junction · 1.0 km
  • Poppelsdorfer Platz · at Bonn-Poppelsdorf junction · 500 m
  • Parkhaus Generalzolldirektion · at Bonn-Endenich junction · 1.0 km
  • Schatzinsel Parkplatz · at Bonn-Tannenbusch junction · 800 m
  • Schülerparkplatz · at Bonn-Tannenbusch junction · 700 m
  • Besucher Bafin · at Bonn-Auerberg junction · 650 m
  • LVR-Klinik Bonn (Haus 6, Parkhaus, Küche) Kaiser-Karl-Ring Haus 6 · at Bonn-Auerberg junction · 900 m
  • Parkplatz Bafin · at Bonn-Auerberg junction · 650 m

OSM-Standortdaten: © OpenStreetMap-Mitwirkende, ODbL 1.0 · licence text

These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.

Charging

Charging stations within 600 m of the junctions and service areas. Charging stations read 06:31; each point's status with its own time.

  • Westenergie Metering GmbH · 1 charge point · up to 22 kW · status from 06:10 — possibly out of date · at Merl junction
  • Westenergie Metering GmbH · 1 charge point · up to 22 kW · status from 06:10 — possibly out of date · at Merl junction
  • Basketsring 2 · 2 charge points · up to 22 kW · status from 06:07 — possibly out of date · at Bonn-Hardtberg junction
  • Telekom (öffentlicher Ladestandort) · 2 charge points · up to 50 kW · status from 05:41 — possibly out of date · at Bonn-Hardtberg junction
  • Im Mühlenbach 2 DC · 2 charge points · up to 150 kW · status from 06:07 — possibly out of date · at Bonn-Lengsdorf junction
  • Im Weiler 12 · 4 charge points · up to 22 kW · status from 06:07 — possibly out of date · at Bonn-Lengsdorf junction
  • Alfred-Bucherer-Straße 103 · 2 charge points · up to 22 kW · status from 06:07 — possibly out of date · at Bonn-Poppelsdorf junction
  • Knauber Parkhaus Bonn · 16 charge points · up to 22 kW · status from 06:07 — possibly out of date · at Bonn-Endenich junction
  • Verdistraße 10 DC50 · 2 charge points · up to 50 kW · status from 06:07 — possibly out of date · at Bonn-Endenich junction
  • 012644 · 2 charge points · up to 150 kW · status from 05:59 — possibly out of date, 1 without status · at Bonn-Tannenbusch junction
  • ALDI SE & Co. KG St. Augustin · 3 charge points · up to 100 kW · status from 06:01 — possibly out of date · at Bonn-Tannenbusch junction
  • Paulusplatz 10 · 2 charge points · up to 22 kW · status from 06:07 — possibly out of date · at Bonn-Tannenbusch junction
  • Porsche Sales & Marketplace PZ Bonn Wallbox rechts · 4 charge points · up to 320 kW · status from 15 Oct, 10:18 — possibly out of date, 1 without status · at Bonn-Tannenbusch junction
  • Friesenweg 6 · 4 charge points · up to 22 kW · status from 06:07 — possibly out of date · at Bonn-Auerberg junction
  • Friesenweg 8 DC · 2 charge points · up to 150 kW · status from 06:07 — possibly out of date · at Bonn-Auerberg junction

Only a few operators publish live occupancy; “no status data” means unknown, not free.

Fast charging from 150 kW and power classes

Longest stretch without a charging site of 150 kW or more: from Anschluss B257 to Bonn-Lengsdorf junction, about 16 km (schematic).

By power: under 50 kW: 8 · 50 to 149 kW: 3 · 150 kW and up: 4.

Our count of the sites above (within the distance named from a junction or service area) – whether one is free, the list says.

Ladepunkt-Verfügbarkeit: chargecloud GmbH via Mobilithek, CC0 1.0

Ladepunkte: chargecloud GmbH via Mobilithek, CC0 1.0

Ladepunkte: Eco-Movement via Mobilithek, CC BY 4.0, bearbeitet · licence text

Ladepunkt-Verfügbarkeit: Eco-Movement via Mobilithek, CC BY 4.0, bearbeitet · licence text

Ladepunkt-Verfügbarkeit: Hamburger Energienetze GmbH (eRound) via Mobilithek, CC0 1.0

Ladepunkte: Hamburger Energienetze GmbH (eRound) via Mobilithek, CC0 1.0

Ladepunkt-Verfügbarkeit: EWE via Mobilithek, CC0 1.0

Ladepunkte: EWE via Mobilithek, CC0 1.0

Ladepunkt-Verfügbarkeit: vaylens GmbH via Mobilithek, CC0 1.0

Ladepunkte: vaylens GmbH via Mobilithek, CC0 1.0

Ladepunkte und Verfügbarkeit: chargecloud (CC0 1.0) via MobiData BW (NVBW), Datenlizenz Deutschland – Namensnennung – Version 2.0 (www.govdata.de/dl-de/by-2-0), Daten geändert · licence text

Weather along the motorway

Official warnings of the Deutscher Wetterdienst

No official warning along the motorway.

Fuel prices

We load the prices of the filling stations along the motorway only when you ask for them. Loading the prices needs JavaScript on this page.

On every motorway

Lorry driving ban

On Sundays and public holidays, lorries over 7.5 t and lorries with trailers may not drive between 00:00 and 22:00. (§ 30 Abs. 3 StVO)

Next ban day: Sunday 18 October.

The motorway's states by the nearest municipality of each junction. Holidays per § 30 Abs. 4 StVO, reviewed 8 October 2026 · Informational, not legal advice.

  • On the Autobahn there is no general speed limit where no sign says otherwise; the advisory speed is 130 km/h. Drive faster and you can share liability in a crash. (Autobahn-Richtgeschwindigkeits-V)
  • Rescue lane: as soon as traffic slows on a motorway or rural road with at least two lanes per direction, keep a lane free between the leftmost lane and the one beside it — immediately, not once the blue lights arrive. (§ 11 Abs. 2 StVO)
  • 112 reaches ambulance and fire service (Europe-wide), 110 the police — free from any network, credit or not. (Notrufverordnung (NotrufV))

Reviewed 19 September 2026 · Informational, not legal advice.

All motorways