Beta ViaFrei is in beta: answers and coverage can change, and the AI can make mistakes. Please check important details with the source named. What this means
A516 motorway now
The A516 runs from Oberhausen-Eisenheim junction to Oberhausen interchange, about 4.9 km long (schematic), through North Rhine-Westphalia, with 3 junctions and interchanges (1 of them an interchange). Reported on the A516 now: 1 closure, 0 jams, 13 roadworks (as of 06:59).
Reported now
1 closure · 0 jams · 13 roadworks · as of 06:59
By direction
- km -0.11 - → km -0.01: 0 closures · 0 jams · 1 roadworks
- Oberhausen → Oberhausen-Eisenheim: 0 closures · 0 jams · 4 roadworks
- Oberhausen-Eisenheim → Oberhausen: 0 closures · 0 jams · 3 roadworks
- no direction given: 1 closure · 0 jams · 5 roadworks
Next planned full closure: Oberhausen - Oberhausen-Eisenheim · Oberhausen → Oberhausen-Eisenheim, from 18:00
Map
- Junction or interchange
- Closure
- Roadworks
- Charging station
Schematic: the line joins the points of the Location Code List in their order – not to scale, not a navigation map. Where the list has a gap, the line breaks too.
Map sources
Kartengrundlage: © BKG (2026) dl-de/by-2-0, Datenquellen: https://sgx.geodatenzentrum.de/web_public/gdz/datenquellen/datenquellen_vg_nuts.pdf (Daten verändert)
TMC Location Code List (LCL 22.0): Bundesanstalt für Straßenwesen (BASt), CC BY 4.0, bearbeitet · licence text
Ladesäulenregister: Bundesnetzagentur.de, CC BY 4.0, bearbeitet · licence text
Ladepunkte: Eco-Movement via Mobilithek, CC BY 4.0, bearbeitet · licence text
Ladepunkte: EnBW AG via Mobilithek, CC BY 4.0, bearbeitet · licence text
Closures, jams and roadworks on the A516
Closures
- Closure · Map
Jams
none
Roadworks
- Roadworks · Map · 5 identical reports
- Roadworks · Oberhausen-Eisenheim - Oberhausen · Oberhausen-Eisenheim → Oberhausen · Map
- Roadworks · Oberhausen-Eisenheim - Oberhausen-Sterkrade · Oberhausen-Eisenheim → Oberhausen · Map
- Roadworks · Oberhausen - Oberhausen-Eisenheim · Oberhausen → Oberhausen-Eisenheim · Map
- Roadworks · Oberhausen - Oberhausen-Sterkrade · Oberhausen → Oberhausen-Eisenheim · Map · 2 identical reports
- Roadworks · Oberhausen-Sterkrade - Oberhausen · Oberhausen-Eisenheim → Oberhausen · Map
- Roadworks · Oberhausen-Sterkrade - Oberhausen-Eisenheim · Oberhausen → Oberhausen-Eisenheim · Map
- Roadworks · km -0.11 - → km -0.01 · Map
Planned full closures, next 7 days
Announced by Autobahn GmbH, not started yet (as of 06:59).
- from 18:00 · Closure · Oberhausen - Oberhausen-Eisenheim · Oberhausen → Oberhausen-Eisenheim
- from 18:00 · Closure · km -0.29 - → km -0.04
Some stretches are described in German only; the German page shows them.
Route
From Oberhausen-Eisenheim junction to Oberhausen interchange · 3 junctions and interchanges
about 4.9 km along the points of the Location Code List (schematic)
Through North Rhine-Westphalia (state by the nearest municipality of each junction)
Junction strip
The junctions in their order, with what is reported at each.
- 3 Oberhausen-Eisenheim junction 1 closure · 1 roadworks · parking · charging
- 2 Oberhausen-Sterkrade junction 6 roadworks · parking · charging
- 1 Oberhausen interchange meets A2, A3 1 roadworks
Places on the A516
Parking and rest
P+R sites from P+R NRW (CC BY-SA), held separately — not cross-checked with the entries above
- Park and ride · OLGA-Park, Werthfeldstr. · occupancy not carried by us · 350 m · Map
- Park and ride · OB Sterkrade Bf. · occupancy not carried by us · 1.3 km · Map
- Park and ride · Sterkrade Bahnhof, Friedrichstr. · occupancy not carried by us · 1.3 km · Map
P+R NRW: NRW.Mobidrom via Mobilithek, Datensatz „Gebündelte Daten Park+Ride NRW“, CC BY-SA, bearbeitet · licence text
The P+R NRW entries are licensed CC BY-SA (share-alike) by their source: anyone who passes them on, or builds something on them, must release the result under the same licence and with this attribution. We release our adaptation under CC BY-SA 4.0
More car parks mapped by OpenStreetMap
- P10 · at Oberhausen-Eisenheim junction · 900 m
- P11 · at Oberhausen-Eisenheim junction · 1.0 km
- P9 · at Oberhausen-Eisenheim junction · 1.0 km
- Parkhaus Technisches Rathaus · at Oberhausen-Sterkrade junction · 700 m
- Parkplatz Sterkrader Tor · at Oberhausen-Sterkrade junction · 450 m
- Patientenparkplatz · at Oberhausen-Sterkrade junction · 850 m
OSM-Standortdaten: © OpenStreetMap-Mitwirkende, ODbL 1.0 · licence text
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Charging
Charging stations within 600 m of the junctions and service areas. Charging stations read 05:53; each point's status with its own time.
- Energieversorgung Oberhausen AG · 2 charge points · up to 22 kW · no status data · at Oberhausen-Eisenheim junction
- Energieversorgung Oberhausen AG · 2 charge points · up to 22 kW · no status data · at Oberhausen-Eisenheim junction
- Aral Pulse · 6 charge points · up to 300 kW · no status data · at Oberhausen-Sterkrade junction
- Aral pulse Teutoburger Straße 1-3, 46145 Oberhausen · 9 charge points · up to 300 kW · status from 15 Oct, 10:15 — possibly out of date, 2 without status · at Oberhausen-Sterkrade junction
- ENBW · 4 charge points · up to 200 kW · no status data · at Oberhausen-Sterkrade junction
Only a few operators publish live occupancy; “no status data” means unknown, not free.
Fast charging from 150 kW and power classes
Longest stretch without a charging site of 150 kW or more: from Oberhausen-Sterkrade junction to Oberhausen interchange, about 2.6 km (schematic).
By power: under 50 kW: 2 · 150 kW and up: 3.
Our count of the sites above (within the distance named from a junction or service area) – whether one is free, the list says.
Ladesäulenregister: Bundesnetzagentur.de, CC BY 4.0, bearbeitet · licence text
Ladepunkte: Eco-Movement via Mobilithek, CC BY 4.0, bearbeitet · licence text
Ladepunkt-Verfügbarkeit: Eco-Movement via Mobilithek, CC BY 4.0, bearbeitet · licence text
Ladepunkte: EnBW AG via Mobilithek, CC BY 4.0, bearbeitet · licence text
Weather along the motorway
Official warnings of the Deutscher Wetterdienst
No official warning along the motorway.
Fuel prices
We load the prices of the filling stations along the motorway only when you ask for them. Loading the prices needs JavaScript on this page.
Loading prices …
The prices cannot be fetched right now.
On every motorway
Lorry driving ban
On Sundays and public holidays, lorries over 7.5 t and lorries with trailers may not drive between 00:00 and 22:00. (§ 30 Abs. 3 StVO)
Next ban day: Sunday 18 October.
The motorway's states by the nearest municipality of each junction. Holidays per § 30 Abs. 4 StVO, reviewed 8 October 2026 · Informational, not legal advice.
- On the Autobahn there is no general speed limit where no sign says otherwise; the advisory speed is 130 km/h. Drive faster and you can share liability in a crash. (Autobahn-Richtgeschwindigkeits-V)
- Rescue lane: as soon as traffic slows on a motorway or rural road with at least two lanes per direction, keep a lane free between the leftmost lane and the one beside it — immediately, not once the blue lights arrive. (§ 11 Abs. 2 StVO)
- 112 reaches ambulance and fire service (Europe-wide), 110 the police — free from any network, credit or not. (Notrufverordnung (NotrufV))
Reviewed 19 September 2026 · Informational, not legal advice.