Beta ViaFrei is in beta: answers and coverage can change, and the AI can make mistakes. Please check important details with the source named. What this means
A281 motorway now
The A281 runs from Neuenlander Ring to Bremen-Industriehäfen interchange, about 11 km long (schematic), through Bremen and Lower Saxony, with 8 junctions and interchanges (1 of them an interchange); its course is broken between HB-Seehausen junction and Bremen-Burg-Grambke junction. Reported on the A281 now: 3 closures, 2 jams, 1 roadworks (as of 06:59).
Reported now
3 closures · 2 jams · 1 roadworks · as of 06:59
By direction
- Airport-Stadt → Neustädter Hafen: 2 closures · 2 jams · 1 roadworks
- no direction given: 1 closure · 0 jams · 0 roadworks
Map
- Junction or interchange
- Closure
- Roadworks
- Jam
Schematic: the line joins the points of the Location Code List in their order – not to scale, not a navigation map. Where the list has a gap, the line breaks too.
- Broken between HB-Seehausen junction and Bremen-Burg-Grambke junction: the Location Code List gives no course in between, so we draw no line there.
Map sources
Kartengrundlage: © BKG (2026) dl-de/by-2-0, Datenquellen: https://sgx.geodatenzentrum.de/web_public/gdz/datenquellen/datenquellen_vg_nuts.pdf (Daten verändert)
TMC Location Code List (LCL 22.0): Bundesanstalt für Straßenwesen (BASt), CC BY 4.0, bearbeitet · licence text
Closures, jams and roadworks on the A281
Closures
- Closure · Bremen-Airportstadt - Bremen-Strom · Airport-Stadt → Neustädter Hafen · Map
- Closure · Map
- Closure · Neuenlander Ring - Bremen-Neustadt · Airport-Stadt → Neustädter Hafen · Map
Jams
- Jam · Neuenlander Ring - Bremen-Neustädter Hafen · Airport-Stadt → Neustädter Hafen · +30 min · Map
- Jam · Neuenlander Ring - Bremen-Neustadt · Airport-Stadt → Neustädter Hafen · +6 min · Map
Roadworks
- Roadworks · Bremen-Strom - HB-Seehausen · Airport-Stadt → Neustädter Hafen · Map
Planned full closures, next 7 days
Announced by Autobahn GmbH, not started yet (as of 06:59).
- from 18 Oct, 09:00 · Closure
- from 18 Oct, 09:00 · Closure · Bremen-Strom - Bremen-Airportstadt · Neustädter Hafen → Airport-Stadt
Some stretches are described in German only; the German page shows them.
Route
From Neuenlander Ring to Bremen-Industriehäfen interchange · 8 junctions and interchanges
about 11 km along the points of the Location Code List (schematic)
Through Bremen, Lower Saxony (state by the nearest municipality of each junction)
Junction strip
The junctions in their order, with what is reported at each.
- Neuenlander Ring parking
- 7 Bremen-Airportstadt junction 2 closures · 2 jams · parking
- 6 Bremen-Neustadt junction 1 closure · parking
- 5 Bremen-Neustädter Hafen junction parking
- 4 Bremen-Strom junction
- 3 HB-Seehausen junction 1 roadworks
- Bremen-Burg-Grambke junction parking
- 17 Bremen-Industriehäfen interchange meets A27
Places on the A281
Parking and rest
More car parks mapped by OpenStreetMap
- Parkhaus 1 · at Neuenlander Ring · 800 m
- Parkhaus 2 · at Neuenlander Ring · 850 m
- Sonneneck · at Neuenlander Ring · 450 m
- Parkhaus 1 · at Bremen-Airportstadt junction · 500 m
- Parkhaus 2 · at Bremen-Airportstadt junction · 500 m
- Parkhaus Süd · at Bremen-Airportstadt junction · 450 m
- REWE-Parkplatz · at Bremen-Neustadt junction · 1.0 km
- MOBI 1 Am Tabakquartier 4 · at Bremen-Neustädter Hafen junction · 900 m
- MOBI 2 Senator-Apelt-Straße 51a · at Bremen-Neustädter Hafen junction · 950 m
- Kundenparkplatz Nehlsen · at Bremen-Burg-Grambke junction · 800 m
OSM-Standortdaten: © OpenStreetMap-Mitwirkende, ODbL 1.0 · licence text
These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.
Charging
This motorway's charging stations are being read – they will be here on your next visit.
Weather along the motorway
Official warnings of the Deutscher Wetterdienst
No official warning along the motorway.
Fuel prices
We load the prices of the filling stations along the motorway only when you ask for them. Loading the prices needs JavaScript on this page.
Loading prices …
The prices cannot be fetched right now.
On every motorway
Lorry driving ban
On Sundays and public holidays, lorries over 7.5 t and lorries with trailers may not drive between 00:00 and 22:00. (§ 30 Abs. 3 StVO)
Next ban day: Sunday 18 October.
The motorway's states by the nearest municipality of each junction. Holidays per § 30 Abs. 4 StVO, reviewed 8 October 2026 · Informational, not legal advice.
- On the Autobahn there is no general speed limit where no sign says otherwise; the advisory speed is 130 km/h. Drive faster and you can share liability in a crash. (Autobahn-Richtgeschwindigkeits-V)
- Rescue lane: as soon as traffic slows on a motorway or rural road with at least two lanes per direction, keep a lane free between the leftmost lane and the one beside it — immediately, not once the blue lights arrive. (§ 11 Abs. 2 StVO)
- 112 reaches ambulance and fire service (Europe-wide), 110 the police — free from any network, credit or not. (Notrufverordnung (NotrufV))
Reviewed 19 September 2026 · Informational, not legal advice.