ViaFrei Transport data, spoken Connect
Ready in one minute

Beta ViaFrei is in beta: answers and coverage can change, and the AI can make mistakes. Please check important details with the source named. What this means

A24 motorway now

The A24 runs from Hamburg-Horn junction to Havelland interchange, about 233 km long (schematic), through Hamburg, Schleswig-Holstein, Mecklenburg-Western Pomerania and Brandenburg, with 28 junctions and interchanges (4 of them interchanges). Reported on the A24 now: 2 closures, 0 jams, 26 roadworks (as of 06:59).

Reported now

2 closures · 0 jams · 26 roadworks · as of 06:59

By direction

  • Berliner Ring → Pritzwalk: 0 closures · 0 jams · 2 roadworks
  • Hamburg → Schwerin: 1 closure · 0 jams · 4 roadworks
  • Pritzwalk → Berliner Ring: 0 closures · 0 jams · 3 roadworks
  • Pritzwalk → Schwerin: 0 closures · 0 jams · 3 roadworks
  • Schwerin → Hamburg: 0 closures · 0 jams · 3 roadworks
  • Schwerin → Pritzwalk: 0 closures · 0 jams · 3 roadworks
  • no direction given: 1 closure · 0 jams · 8 roadworks
Stretch and direction

Direction:

Show:

Whole motorway

Map

Schematic map of the A24The A24 from Hamburg-Horn to Havelland, drawn schematically through its junctions, with the reported closures, roadworks and jams.
  • Junction or interchange
  • Closure
  • Roadworks
  • Service area or lorry park
  • Charging station
  • Traffic camera
  • Road-weather station

Schematic: the line joins the points of the Location Code List in their order – not to scale, not a navigation map. Where the list has a gap, the line breaks too.

Map sources

Kartengrundlage: © BKG (2026) dl-de/by-2-0, Datenquellen: https://sgx.geodatenzentrum.de/web_public/gdz/datenquellen/datenquellen_vg_nuts.pdf (Daten verändert)

TMC Location Code List (LCL 22.0): Bundesanstalt für Straßenwesen (BASt), CC BY 4.0, bearbeitet · licence text

LKW-Parken: © Lkw-Parken BAB Deutschland / Bundesministerium für Verkehr (BMV) 2026 — GeoNutzV, Daten verändert

Verkehrsdaten: Autobahn GmbH des Bundes

Ladepunkte: Hamburger Energienetze GmbH (eRound) via Mobilithek, CC0 1.0

Ladepunkte: Eco-Movement via Mobilithek, CC BY 4.0, bearbeitet · licence text

Ladesäulenregister: Bundesnetzagentur.de, CC BY 4.0, bearbeitet · licence text

Ladepunkte: Ampeco Ltd. (EDRI) via Mobilithek, CC0 1.0

Ladepunkte: EnBW AG via Mobilithek, CC BY 4.0, bearbeitet · licence text

Verkehrskameras: Freie und Hansestadt Hamburg, Behörde für Verkehr und Mobilitätswende, (BVM), Datenlizenz Deutschland – Namensnennung – Version 2.0 · licence text The publisher states that the internet transmission is occasionally stopped by the Verkehrsleitzentrale for data-protection reasons, so the camera images are not reliably available 24 hours a day.

Quelle: Deutscher Wetterdienst. Datenquelle: BMVBS und Straßenbauverwaltungen der Länder · licence text Die Daten der Glättemeldeanlagen stellen ungeprüfte Punktmessungen dar und spiegeln nicht die Verhältnisse auf einem Straßenabschnitt wider. Es besteht kein Anspruch auf regelmäßige und vollständige Datenlieferungen.

Closures, jams and roadworks on the A24

Closures

  • Closure · Hamburg → Schwerin · Map · 2 identical reports

Jams

none

Roadworks

  • Roadworks · Map
  • Roadworks · Map
  • Roadworks · Schwerin → Hamburg · Map
  • Roadworks · Dorngrund Nord - Meyenburg · Schwerin → Pritzwalk · Map
  • Roadworks · Dorngrund Süd - Putlitz · Pritzwalk → Schwerin · Map
  • Roadworks · Fehrbellin - Walsleben-Ost · Berliner Ring → Pritzwalk · Map · 2 identical reports
  • Roadworks · Hagenow - Wittenburg · Schwerin → Hamburg · Map
  • Roadworks · Hagenow - Wöbbelin · Hamburg → Schwerin · Map
  • Roadworks · Meyenburg - Pritzwalk · Schwerin → Pritzwalk · Map
  • Roadworks · Pritzwalk - Meyenburg · Pritzwalk → Schwerin · Map
  • Roadworks · Putlitz - Meyenburg · Schwerin → Pritzwalk · Map
  • Roadworks · Sachsenwald - Witzhave · Schwerin → Hamburg · Map
  • Roadworks · Stolpe - Blievenstorf · Pritzwalk → Schwerin · Map
  • Roadworks · Walsleben-Ost - Fehrbellin · Pritzwalk → Berliner Ring · Map · 2 identical reports
  • Roadworks · Wittenburg - Hagenow · Hamburg → Schwerin · Map
  • Roadworks · Witzhave - Sachsenwald · Hamburg → Schwerin · Map
  • Roadworks · Wöbbelin - Schwerin · Hamburg → Schwerin · Map
  • Roadworks · Map
  • Roadworks · Pritzwalk → Berliner Ring · Map
  • Roadworks · Map · 2 identical reports
  • Roadworks · Map · 2 identical reports
  • Roadworks · Map

Planned full closures, next 7 days

Announced by Autobahn GmbH, not started yet (as of 06:59).

  • from 20:00 · Closure

Some stretches are described in German only; the German page shows them.

Route

From Hamburg-Horn junction to Havelland interchange · 28 junctions and interchanges

about 233 km along the points of the Location Code List (schematic)

Through Hamburg, Schleswig-Holstein, Mecklenburg-Western Pomerania, Brandenburg (state by the nearest municipality of each junction)

Junction strip

The junctions in their order, with what is reported at each.

  1. 1 Hamburg-Horn junction parking · charging
  2. 2 Hamburg-Jenfeld junction parking · charging
  3. 3 Hamburg-Ost interchange meets A1 parking · camera · road weather
  4. 4 Reinbek junction
  5. 5 Witzhave junction 2 roadworks · parking · charging · road weather
  6. 6 Schwarzenbek/Grande junction
  7. 7 Talkau junction
  8. 8a Hornbek junction parking
  9. 8b Gudow junction
  10. 9a Gallin/Valluhn parking · charging · road weather
  11. 9b Zarrentin junction
  12. 10 Wittenburg junction 1 closure · 2 roadworks · parking · charging
  13. 11 Hagenow junction 2 roadworks · parking
  14. 12 Wöbbelin junction 3 roadworks · parking
  15. 13 Schwerin interchange meets A14 1 roadworks · road weather
  16. 14 Neustadt-Glewe junction parking · charging
  17. 15 Parchim junction 1 roadworks · parking
  18. 16 Suckow junction
  19. 17 Putlitz junction 3 roadworks · parking
  20. 18 Meyenburg junction 2 roadworks · parking
  21. 19 Pritzwalk junction 1 roadworks · parking · charging
  22. 20 Wittstock/Dosse interchange meets A19 parking · charging
  23. 21 Herzsprung junction 1 roadworks · parking · charging
  24. 22 Neuruppin junction 1 roadworks · parking
  25. 23 Neuruppin-Süd junction parking
  26. 24 Fehrbellin junction 1 roadworks · parking · road weather
  27. 25 Kremmen junction
  28. 26 Havelland interchange meets A10 2 roadworks

Places on the A24

Parking and rest

Truck stops (Autohof)

  • Lorry parking · Aral Autohof Wittenburg · 98 spaces · 51 lorry spaces · at Wittenburg junction
  • Lorry parking · Hoyer Autohof Mecklenburg · 139 spaces · 89 lorry spaces · at Neustadt-Glewe junction
  • Lorry parking · Agip-Autohof Liebenthal · 62 spaces · 40 lorry spaces · at Pritzwalk junction
  • Lorry parking · Shell Autohof Herzsprung · 300 spaces · 180 lorry spaces · at Herzsprung junction
  • Lorry parking · Total Autohof Neuruppin · 80 spaces · 55 lorry spaces · at Neuruppin junction

"Autohof" by the name the operator gives – our grouping.

Lorry parks and service areas

  • Lorry parking · Hahnenkoppel Nord · 27 spaces · 8 lorry spaces · at Witzhave junction
  • Lorry parking · Hahnenkoppel Süd · 32 spaces · 13 lorry spaces · at Witzhave junction
  • Lorry parking · Roseburg · 44 spaces · 15 lorry spaces · at Hornbek junction
  • Lorry parking · Tramm · 51 spaces · 16 lorry spaces · at Hornbek junction
  • Lorry parking · Gudow Nord · 187 spaces · 76 lorry spaces · at Gallin/Valluhn
  • Lorry parking · Gudow Süd · 107 spaces · 49 lorry spaces · at Gallin/Valluhn
  • Lorry parking · Schaalsee Süd · 127 spaces · 42 lorry spaces · at Gallin/Valluhn
  • Lorry parking · Wittenburger Land Nord · 45 spaces · 20 lorry spaces · at Wittenburg junction
  • Lorry parking · Wittenburger Land Süd · 45 spaces · 20 lorry spaces · at Wittenburg junction
  • Lorry parking · Schremheide Nord · 34 spaces · 12 lorry spaces · at Hagenow junction
  • Lorry parking · Schremheide Süd · 34 spaces · 12 lorry spaces · at Hagenow junction
  • Lorry parking · LTG-PP an der B 106 · 117 spaces · 63 lorry spaces · at Wöbbelin junction
  • Lorry parking · Blievenstorf Nord · 40 spaces · 9 lorry spaces · at Neustadt-Glewe junction
  • Lorry parking · Blievenstorf Süd · 38 spaces · 8 lorry spaces · at Neustadt-Glewe junction
  • Lorry parking · Stolpe Nord · 103 spaces · 44 lorry spaces · at Parchim junction
  • Lorry parking · Stolpe Süd · 126 spaces · 20 lorry spaces · at Parchim junction
  • Lorry parking · Dorngrund Nord · 24 spaces · 14 lorry spaces · at Putlitz junction
  • Lorry parking · Dorngrund Süd · 25 spaces · 15 lorry spaces · at Putlitz junction
  • Lorry parking · 13 spaces · 13 lorry spaces · at Putlitz junction
  • Lorry parking · 11 spaces · 11 lorry spaces · at Putlitz junction
  • Lorry parking · 13 lorry spaces · at Meyenburg junction
  • Lorry parking · 11 lorry spaces · at Meyenburg junction
  • Lorry parking · Prignitz Ost · 57 spaces · 7 lorry spaces · at Wittstock/Dosse interchange
  • Lorry parking · Prignitz West · 52 spaces · 9 lorry spaces · at Wittstock/Dosse interchange
  • Lorry parking · 10 lorry spaces · at Herzsprung junction
  • Lorry parking · 9 lorry spaces · at Herzsprung junction
  • Lorry parking · 27 lorry spaces · at Herzsprung junction
  • Lorry parking · 28 lorry spaces · at Herzsprung junction
  • Lorry parking · Walsleben Ost · 107 spaces · 16 lorry spaces · at Neuruppin junction
  • Lorry parking · Walsleben West · 84 spaces · 11 lorry spaces · at Neuruppin junction
  • Lorry parking · 9 lorry spaces · at Neuruppin-Süd junction
  • Lorry parking · 9 lorry spaces · at Neuruppin-Süd junction
  • Lorry parking · Linumer Bruch Nord · 222 spaces · 96 lorry spaces · at Fehrbellin junction
  • Lorry parking · Linumer Bruch Süd · 220 spaces · 94 lorry spaces · at Fehrbellin junction

Car parks

  • Park and ride · P+R Horner Rennbahn (Parkpalette) · 177 spaces · 88 free (as of 06:52) · at Hamburg-Horn junction

Verkehrsdaten: Autobahn GmbH des Bundes

P+R-Anlagen: Freie und Hansestadt Hamburg, Behörde für Verkehr und Mobilitätswende, (BVM), Datenlizenz Deutschland – Namensnennung – Version 2.0 (www.govdata.de/dl-de/by-2-0), Daten geändert (bearbeitet) · licence text

LKW-Parken: © Lkw-Parken BAB Deutschland / Bundesministerium für Verkehr (BMV) 2026 — GeoNutzV, Daten verändert

More car parks mapped by OpenStreetMap

  • hvv switch Punkt Caspar-Vogt-Straße · at Hamburg-Horn junction · 700 m
  • hvv switch Punkt Griesstraße · at Hamburg-Horn junction · 800 m
  • Jen · at Hamburg-Jenfeld junction · 1.0 km
  • Barsbüttel-Mitte · at Hamburg-Ost interchange · 650 m
  • Marktplatz · at Hamburg-Ost interchange · 700 m
  • Rako · at Witzhave junction · 250 m
  • Tesla · at Herzsprung junction · 550 m
  • P+M Neuruppin · at Neuruppin-Süd junction · 300 m

OSM-Standortdaten: © OpenStreetMap-Mitwirkende, ODbL 1.0 · licence text

These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.

Charging

Charging stations within 600 m of the junctions and service areas. Charging stations read 05:53; each point's status with its own time.

  • 487 · 2 charge points · up to 22 kW · status from 05:41 — possibly out of date · at Hamburg-Horn junction
  • 8324 · 2 charge points · up to 22 kW · status from 05:41 — possibly out of date · at Hamburg-Horn junction
  • 8332 · 2 charge points · up to 22 kW · status from 05:41 — possibly out of date · at Hamburg-Horn junction
  • JOLT HH008701 · 2 charge points · up to 350 kW · status from 15 Oct, 10:15 — possibly out of date · at Hamburg-Jenfeld junction
  • Ubitricity Raja-Ilinauk-Straße 31 · 4 charge points · up to 22 kW · status from 15 Oct, 10:15 — possibly out of date, 3 without status · at Hamburg-Jenfeld junction
  • Shell Recharge OBN 6782 - Shell Moellner Landstrasse · 4 charge points · up to 360 kW · status from 15 Oct, 10:15 — possibly out of date, 1 without status · at Witzhave junction
  • E.ON Drive GmbH · 2 charge points · up to 50 kW · no status data · at Gallin/Valluhn
  • E.ON Drive Infrastructure · 2 charge points · up to 50 kW · no status data · at Gallin/Valluhn
  • Raststätte Gudow Süd, A24 · 2 charge points · up to 100 kW · no status data · at Gallin/Valluhn
  • ENBW · 8 charge points · up to 400 kW · no status data · at Wittenburg junction
  • McD_0938 · 4 charge points · up to 300 kW · no status data · at Wittenburg junction
  • Allego - Neustadt-Glewe A24 · 6 charge points · up to 300 kW · status from 15 Oct, 10:15 — possibly out of date · at Neustadt-Glewe junction
  • IONITY GmbH IONITY Heiligengrabe · 12 charge points · up to 350 kW · status from 15 Oct, 10:15 — possibly out of date, 1 without status · at Pritzwalk junction
  • E.ON Drive GmbH · 2 charge points · up to 50 kW · no status data · at Wittstock/Dosse interchange
  • E.ON Drive GmbH · 2 charge points · up to 50 kW · no status data · at Wittstock/Dosse interchange
  • E.ON Drive Infrastructure · 2 charge points · up to 50 kW · no status data · at Wittstock/Dosse interchange
  • E.ON Drive Infrastructure · 2 charge points · up to 50 kW · no status data · at Wittstock/Dosse interchange
  • Raststätte Prignitz Ost, A24 · 2 charge points · up to 100 kW · no status data · at Wittstock/Dosse interchange
  • Raststätte Prignitz West, A24 · 2 charge points · up to 100 kW · status from 03:16 — possibly out of date, 1 without status · at Wittstock/Dosse interchange
  • Shell Recharge OBN 9179 - Shell Autohof Herzsprung · 8 charge points · up to 300 kW · status from 15 Oct, 10:15 — possibly out of date · at Herzsprung junction

Only a few operators publish live occupancy; “no status data” means unknown, not free.

Fast charging from 150 kW and power classes

Longest stretch without a charging site of 150 kW or more: from Neustadt-Glewe junction to Pritzwalk junction, about 59 km (schematic).

By power: under 50 kW: 4 · 50 to 149 kW: 9 · 150 kW and up: 7.

Our count of the sites above (within the distance named from a junction or service area) – whether one is free, the list says.

Ladesäulenregister: Bundesnetzagentur.de, CC BY 4.0, bearbeitet · licence text

Ladepunkte: Eco-Movement via Mobilithek, CC BY 4.0, bearbeitet · licence text

Ladepunkt-Verfügbarkeit: Eco-Movement via Mobilithek, CC BY 4.0, bearbeitet · licence text

Ladepunkt-Verfügbarkeit: Ampeco Ltd. (EDRI) via Mobilithek, Open Data (freie Nutzung)

Ladepunkte: Ampeco Ltd. (EDRI) via Mobilithek, CC0 1.0

Ladepunkte: EnBW AG via Mobilithek, CC BY 4.0, bearbeitet · licence text

Ladepunkt-Verfügbarkeit: Hamburger Energienetze GmbH (eRound) via Mobilithek, CC0 1.0

Ladepunkte: Hamburger Energienetze GmbH (eRound) via Mobilithek, CC0 1.0

Weather along the motorway

Official warnings of the Deutscher Wetterdienst

No official warning along the motorway.

Road-surface forecast

DWD road-surface forecast for the nearest road-weather stations — a model forecast (run 06:00), not a measurement and not an official warning

  • AK Hamburg-Ost · at Hamburg-Ost interchange · 07:00: dry, road surface 11.4 °C
  • Sachsenwald · at Witzhave junction · 07:00: dry, road surface 11.3 °C
  • Valluhner Sack · at Gallin/Valluhn · 07:00: dry, road surface 11.3 °C
  • AD Schwerin · at Schwerin interchange · 07:00: dry, road surface 8.9 °C
  • Fehrbellin · at Fehrbellin junction · 07:00: dry, road surface 7.6 °C

Each line is for the station's own location, not for the whole road.

Quelle: Deutscher Wetterdienst. Datenquelle: BMVBS und Straßenbauverwaltungen der Länder · licence text Die Daten der Glättemeldeanlagen stellen ungeprüfte Punktmessungen dar und spiegeln nicht die Verhältnisse auf einem Straßenabschnitt wider. Es besteht kein Anspruch auf regelmäßige und vollständige Datenlieferungen.

Traffic cameras along the motorway

  • A1 Hamburg-Ost interchange · at Hamburg-Ost interchange

view the images on the Verkehrsportal Hamburg. The publisher states that the internet transmission is occasionally stopped by the Verkehrsleitzentrale for data-protection reasons, so the camera images are not reliably available 24 hours a day.

Verkehrskameras: Freie und Hansestadt Hamburg, Behörde für Verkehr und Mobilitätswende, (BVM), Datenlizenz Deutschland – Namensnennung – Version 2.0 · licence text

Fuel prices

We load the prices of the filling stations along the motorway only when you ask for them. Loading the prices needs JavaScript on this page.

On every motorway

Lorry driving ban

On Sundays and public holidays, lorries over 7.5 t and lorries with trailers may not drive between 00:00 and 22:00. (§ 30 Abs. 3 StVO)

Next ban day: Sunday 18 October.

The motorway's states by the nearest municipality of each junction. Holidays per § 30 Abs. 4 StVO, reviewed 8 October 2026 · Informational, not legal advice.

  • On the Autobahn there is no general speed limit where no sign says otherwise; the advisory speed is 130 km/h. Drive faster and you can share liability in a crash. (Autobahn-Richtgeschwindigkeits-V)
  • Rescue lane: as soon as traffic slows on a motorway or rural road with at least two lanes per direction, keep a lane free between the leftmost lane and the one beside it — immediately, not once the blue lights arrive. (§ 11 Abs. 2 StVO)
  • 112 reaches ambulance and fire service (Europe-wide), 110 the police — free from any network, credit or not. (Notrufverordnung (NotrufV))

Reviewed 19 September 2026 · Informational, not legal advice.

All motorways