ViaFrei Transport data, spoken Connect
Ready in one minute

Beta ViaFrei is in beta: answers and coverage can change, and the AI can make mistakes. Please check important details with the source named. What this means

A115 motorway now

The A115 runs from Nuthetal interchange to Funkturm interchange, about 27 km long (schematic), through Brandenburg and Berlin, with 9 junctions and interchanges (2 of them interchanges). Reported on the A115 now: 1 closure, 0 jams, 5 roadworks (as of 06:59).

Reported now

1 closure · 0 jams · 5 roadworks · as of 06:59

By direction

  • Dreieck Funkturm → Dreieck Nuthetal: 0 closures · 0 jams · 2 roadworks
  • Dreieck Nuthetal → Dreieck Funkturm: 0 closures · 0 jams · 3 roadworks
  • no direction given: 1 closure · 0 jams · 0 roadworks
Stretch and direction

Direction:

Show:

Whole motorway

Map

Schematic map of the A115The A115 from Nuthetal to Funkturm, drawn schematically through its junctions, with the reported closures, roadworks and jams.
  • Junction or interchange
  • Closure
  • Roadworks
  • Service area or lorry park

Schematic: the line joins the points of the Location Code List in their order – not to scale, not a navigation map. Where the list has a gap, the line breaks too.

Closures, jams and roadworks on the A115

Closures

Jams

none

Roadworks

  • Roadworks · Am Stern - Hüttenweg · Dreieck Nuthetal → Dreieck Funkturm · Map
  • Roadworks · Dreilinden - Kleinmachnow · Dreieck Funkturm → Dreieck Nuthetal · Map
  • Roadworks · Hüttenweg - Kreuz Zehlendorf · Dreieck Funkturm → Dreieck Nuthetal · Map
  • Roadworks · Kleinmachnow - Hüttenweg · Dreieck Nuthetal → Dreieck Funkturm · Map
  • Roadworks · Kreuz Zehlendorf - Hüttenweg · Dreieck Nuthetal → Dreieck Funkturm · Map

Planned full closures, next 7 days

Announced by Autobahn GmbH, not started yet (as of 06:59).

  • from 19 Oct, 07:30 · Closure

Some stretches are described in German only; the German page shows them.

Route

From Nuthetal interchange to Funkturm interchange · 9 junctions and interchanges

about 27 km along the points of the Location Code List (schematic)

Through Brandenburg, Berlin (state by the nearest municipality of each junction)

Junction strip

The junctions in their order, with what is reported at each.

  1. 7 Nuthetal interchange meets A10 parking
  2. 6 Saarmund junction
  3. 5a Potsdam-Drewitz junction
  4. Potsdam-Babelsberg junction parking
  5. 5a Kleinmachnow junction 2 roadworks
  6. 4 Kreuz Zehlendorf junction 1 closure · 1 roadworks
  7. 3 Spanische Allee junction 2 roadworks · parking
  8. 2 Hüttenweg junction parking
  9. 1 Funkturm interchange meets A100 parking

Places on the A115

Parking and rest

Lorry parks and service areas

  • Lorry parking · at Nuthetal interchange
  • Lorry parking · Am Stern · 57 spaces · 20 lorry spaces · at Potsdam-Babelsberg junction
  • Lorry parking · Parforceheide · 57 spaces · 20 lorry spaces · at Potsdam-Babelsberg junction
  • Lorry parking · Grunewald · 80 spaces · at Spanische Allee junction
  • Lorry parking · Avus · 184 spaces · 134 lorry spaces · at Funkturm interchange

Verkehrsdaten: Autobahn GmbH des Bundes

LKW-Parken: © Lkw-Parken BAB Deutschland / Bundesministerium für Verkehr (BMV) 2026 — GeoNutzV, Daten verändert

More car parks mapped by OpenStreetMap

  • Nahkauf · at Potsdam-Babelsberg junction · 850 m
  • Waldparkplatz am Großen Stern · at Hüttenweg junction · 100 m
  • Waldparkplatz am Kleinen Stern · at Hüttenweg junction · 750 m
  • ICC · at Funkturm interchange · 200 m
  • P13 · at Funkturm interchange · 350 m

OSM-Standortdaten: © OpenStreetMap-Mitwirkende, ODbL 1.0 · licence text

These entries come from our database derived from OpenStreetMap. We send a complete machine-readable copy (CSV) under the ODbL 1.0 free of charge on request – contact details in the imprint.

Charging

This motorway's charging stations are being read – they will be here on your next visit.

Weather along the motorway

Official warnings of the Deutscher Wetterdienst

No official warning along the motorway.

Fuel prices

We load the prices of the filling stations along the motorway only when you ask for them. Loading the prices needs JavaScript on this page.

On every motorway

Lorry driving ban

On Sundays and public holidays, lorries over 7.5 t and lorries with trailers may not drive between 00:00 and 22:00. (§ 30 Abs. 3 StVO)

Next ban day: Sunday 18 October.

The motorway's states by the nearest municipality of each junction. Holidays per § 30 Abs. 4 StVO, reviewed 8 October 2026 · Informational, not legal advice.

  • On the Autobahn there is no general speed limit where no sign says otherwise; the advisory speed is 130 km/h. Drive faster and you can share liability in a crash. (Autobahn-Richtgeschwindigkeits-V)
  • Rescue lane: as soon as traffic slows on a motorway or rural road with at least two lanes per direction, keep a lane free between the leftmost lane and the one beside it — immediately, not once the blue lights arrive. (§ 11 Abs. 2 StVO)
  • 112 reaches ambulance and fire service (Europe-wide), 110 the police — free from any network, credit or not. (Notrufverordnung (NotrufV))

Reviewed 19 September 2026 · Informational, not legal advice.

All motorways