ViaFrei Transport data, spoken Connect
Ready in one minute

Beta ViaFrei is in beta: answers and coverage can change, and the AI can make mistakes. Please check important details with the source named. What this means

A11 motorway now

The A11 runs from Barnim interchange to Penkun junction, about 109 km long (schematic), through Brandenburg and Mecklenburg-Western Pomerania, with 15 junctions and interchanges (2 of them interchanges). Reported on the A11 now: 2 closures, 0 jams, 7 roadworks (as of 06:59).

Reported now

2 closures · 0 jams · 7 roadworks · as of 06:59

By direction

  • Berliner Ring → Kreuz Uckermark: 1 closure · 0 jams · 2 roadworks
  • Kreuz Uckermark → Stettin: 0 closures · 0 jams · 1 roadworks
  • Stettin → Berliner Ring: 0 closures · 0 jams · 1 roadworks
  • no direction given: 1 closure · 0 jams · 3 roadworks
Stretch and direction

Direction:

Show:

Whole motorway

Map

Schematic map of the A11The A11 from Barnim to Penkun, drawn schematically through its junctions, with the reported closures, roadworks and jams.
  • Junction or interchange
  • Closure
  • Roadworks
  • Service area or lorry park
  • Charging station
  • Road-weather station

Schematic: the line joins the points of the Location Code List in their order – not to scale, not a navigation map. Where the list has a gap, the line breaks too.

Map sources

Kartengrundlage: © BKG (2026) dl-de/by-2-0, Datenquellen: https://sgx.geodatenzentrum.de/web_public/gdz/datenquellen/datenquellen_vg_nuts.pdf (Daten verändert)

TMC Location Code List (LCL 22.0): Bundesanstalt für Straßenwesen (BASt), CC BY 4.0, bearbeitet · licence text

LKW-Parken: © Lkw-Parken BAB Deutschland / Bundesministerium für Verkehr (BMV) 2026 — GeoNutzV, Daten verändert

Verkehrsdaten: Autobahn GmbH des Bundes

Ladepunkte: Eco-Movement via Mobilithek, CC BY 4.0, bearbeitet · licence text

Ladesäulenregister: Bundesnetzagentur.de, CC BY 4.0, bearbeitet · licence text

Quelle: Deutscher Wetterdienst. Datenquelle: BMVBS und Straßenbauverwaltungen der Länder · licence text Die Daten der Glättemeldeanlagen stellen ungeprüfte Punktmessungen dar und spiegeln nicht die Verhältnisse auf einem Straßenabschnitt wider. Es besteht kein Anspruch auf regelmäßige und vollständige Datenlieferungen.

Closures, jams and roadworks on the A11

Closures

  • Closure · Berliner Ring → Kreuz Uckermark · Map · 2 identical reports

Jams

none

Roadworks

  • Roadworks · Joachimsthal - Warnitz · Berliner Ring → Kreuz Uckermark · Map
  • Roadworks · Penkun - Pomellen · Kreuz Uckermark → Stettin · Map
  • Roadworks · Schmölln - Warnitz · Stettin → Berliner Ring · Map
  • Roadworks · Suckower Forst - Rathsburgseen-Nord · Berliner Ring → Kreuz Uckermark · Map
  • Roadworks · Map
  • Roadworks · Map · 2 identical reports

Planned full closures, next 7 days

Autobahn GmbH announces no full closure on this motorway for the next 7 days (as of 06:59).

Some stretches are described in German only; the German page shows them.

Route

From Barnim interchange to Penkun junction · 15 junctions and interchanges

about 109 km along the points of the Location Code List (schematic)

Through Brandenburg, Mecklenburg-Western Pomerania (state by the nearest municipality of each junction)

Junction strip

The junctions in their order, with what is reported at each.

  1. 17 Barnim interchange meets A10
  2. 16 Bernau-Süd junction
  3. 15 Bernau-Nord junction parking · charging
  4. 14 Wandlitz junction parking
  5. 13 Lanke junction
  6. 12 Finowfurt junction 1 closure · parking · road weather
  7. 11 Werbellin junction parking · charging
  8. 10 Chorin junction
  9. 9 Joachimsthal junction road weather
  10. 8 Pfingstberg junction 2 roadworks · parking
  11. 7 Warnitz junction parking
  12. 6 Gramzow junction 1 roadworks · parking · charging
  13. 5 Kreuz Uckermark interchange meets A20 1 roadworks · parking
  14. 4 Schmölln junction parking · road weather
  15. 4 Penkun junction 2 roadworks · parking

Places on the A11

Parking and rest

Lorry parks and service areas

  • Lorry parking · Gewerbegebiet Bernau-Rehberge · 17 spaces · 17 lorry spaces · at Bernau-Nord junction
  • Lorry parking · Gewerbegebiet OT Schönow · 26 spaces · 26 lorry spaces · at Bernau-Nord junction
  • Lorry parking · Ladeburger Heide · 48 spaces · 18 lorry spaces · at Wandlitz junction
  • Lorry parking · Probstheide · 48 spaces · 18 lorry spaces · at Wandlitz junction
  • Lorry parking · 21 spaces · at Finowfurt junction
  • Lorry parking · Buckowsee Ost · 105 spaces · 25 lorry spaces · at Werbellin junction
  • Lorry parking · Buckowsee West · 116 spaces · 35 lorry spaces · at Werbellin junction
  • Lorry parking · Suckower Forst · 23 spaces · 8 lorry spaces · at Pfingstberg junction
  • Lorry parking · Wilmersdorfer Forst · 23 spaces · 8 lorry spaces · at Pfingstberg junction
  • Lorry parking · at Warnitz junction
  • Lorry parking · Rathsburgseen Nord · 48 spaces · 16 lorry spaces · at Gramzow junction
  • Lorry parking · Rathsburgseen Süd · 48 spaces · 16 lorry spaces · at Gramzow junction
  • Lorry parking · Star-Tankstelle · 35 spaces · 21 lorry spaces · at Gramzow junction
  • Lorry parking · Randowbruch Süd · 12 lorry spaces · at Kreuz Uckermark interchange
  • Lorry parking · Randowbruch Nord · 12 lorry spaces · at Schmölln junction
  • Lorry parking · GPOMELLEN SCHWA · 40 spaces · 40 lorry spaces · at Penkun junction
  • Lorry parking · GPOMELLEN STETT · 40 spaces · 40 lorry spaces · at Penkun junction

Verkehrsdaten: Autobahn GmbH des Bundes

LKW-Parken: © Lkw-Parken BAB Deutschland / Bundesministerium für Verkehr (BMV) 2026 — GeoNutzV, Daten verändert

Charging

Charging stations within 600 m of the junctions and service areas. Charging stations read 06:59; each point's status with its own time.

  • CoMoly GmbH · 4 charge points · up to 300 kW · no status data · at Bernau-Nord junction
  • Circle K I Schorfheide-Buckowsee BAB Ost/a 11 · 16 charge points · up to 175 kW · status from 15 Oct, 10:21 — possibly out of date, 4 without status · at Werbellin junction
  • Circle K I Schorfheide-Buckowsee BAB West/a 11 · 16 charge points · up to 175 kW · status from 15 Oct, 10:21 — possibly out of date, 2 without status · at Werbellin junction
  • DC-10032-04 · 16 charge points · up to 200 kW · status from 15 Oct, 10:21 — possibly out of date, 8 without status · at Gramzow junction
  • Tesla Germany GmbH · 4 charge points · up to 250 kW · no status data · at Gramzow junction

Only a few operators publish live occupancy; “no status data” means unknown, not free.

Fast charging from 150 kW and power classes

Longest stretch without a charging site of 150 kW or more: from Werbellin junction to Gramzow junction, about 43 km (schematic).

By power: 150 kW and up: 5.

Our count of the sites above (within the distance named from a junction or service area) – whether one is free, the list says.

Ladesäulenregister: Bundesnetzagentur.de, CC BY 4.0, bearbeitet · licence text

Ladepunkte: Eco-Movement via Mobilithek, CC BY 4.0, bearbeitet · licence text

Ladepunkt-Verfügbarkeit: Eco-Movement via Mobilithek, CC BY 4.0, bearbeitet · licence text

Ladepunkte: Road B.V. (Road Public Network) via Mobilithek, Open Data (freie Nutzung)

Weather along the motorway

Official warnings of the Deutscher Wetterdienst

No official warning along the motorway.

Road-surface forecast

DWD road-surface forecast for the nearest road-weather stations — a model forecast (run 06:00), not a measurement and not an official warning

  • Finowfurt · at Finowfurt junction · 07:00: dry, road surface 5.3 °C
  • Joachimsthal · at Joachimsthal junction · 07:00: dry, road surface 6.7 °C
  • Schmoelln · at Schmölln junction · 07:00: damp, road surface 6.8 °C

Each line is for the station's own location, not for the whole road.

Quelle: Deutscher Wetterdienst. Datenquelle: BMVBS und Straßenbauverwaltungen der Länder · licence text Die Daten der Glättemeldeanlagen stellen ungeprüfte Punktmessungen dar und spiegeln nicht die Verhältnisse auf einem Straßenabschnitt wider. Es besteht kein Anspruch auf regelmäßige und vollständige Datenlieferungen.

Fuel prices

We load the prices of the filling stations along the motorway only when you ask for them. Loading the prices needs JavaScript on this page.

On every motorway

Lorry driving ban

On Sundays and public holidays, lorries over 7.5 t and lorries with trailers may not drive between 00:00 and 22:00. (§ 30 Abs. 3 StVO)

Next ban day: Sunday 18 October.

The motorway's states by the nearest municipality of each junction. Holidays per § 30 Abs. 4 StVO, reviewed 8 October 2026 · Informational, not legal advice.

  • On the Autobahn there is no general speed limit where no sign says otherwise; the advisory speed is 130 km/h. Drive faster and you can share liability in a crash. (Autobahn-Richtgeschwindigkeits-V)
  • Rescue lane: as soon as traffic slows on a motorway or rural road with at least two lanes per direction, keep a lane free between the leftmost lane and the one beside it — immediately, not once the blue lights arrive. (§ 11 Abs. 2 StVO)
  • 112 reaches ambulance and fire service (Europe-wide), 110 the police — free from any network, credit or not. (Notrufverordnung (NotrufV))

Reviewed 19 September 2026 · Informational, not legal advice.

All motorways