Nürnberg Zickstraße between Bärenschanzstraße and Fürther Straße One-way road control, construction site, from 10/03/2026, 07:30 to 18/12/2026, 15:00 The SUN channel operation, … · Original (German) →Full text
Nürnberg Zickstraße between Bärenschanzstraße and Fürther Straße One-way road control, construction site, from 10/03/2026, 07:30 to 18/12/2026, 15:00 The SUN channel operation, which N-Ergie and SÖR are setting up a common site at the corner Willstraße/Fürther Straße. After the canal work and laying of the supply lines, the walkways and the roadway are renovated. Willstraße Kernstraße and Bärenschanzstraße are fully closed during this period. The Fürther Straße is only accessible with one lane per direction of travel.